Contract notice: Construction work Tender in Bulgaria - 20465912
Tender notice from Bulgaria, published on 09 Feb 2018.
Executive Summary
The ОБЩИНА ВЕЛИКО ТЪРНОВО has issued a Tender notice for the procurement of a Contract notice: Construction work in the Bulgaria. This Tender notice was published on 09 Feb 2018 and is scheduled to close on 15 Mar 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 20465912, while the tender notice number is 055879-2018 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Regional or local authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45000000, 45000000, 45200000, 45321000, 45454000, 45421000, 45331000, 45112710, 45000000, 45200000, 45321000, 45454000, 45421000, 45331000, 45112710 CPV Description: Construction work. Works for complete or part construction and civil engineering work. Thermal insulation work. Restructuring work. Joinery work. Heating, ventilation and air-conditioning installation work. Landscaping work for green areas. Дейности по извършване на СМР по проект „Развитие на модерна образователна инфраструктура в гр. Велико Търново" по Приоритетна ос 1 „Устойчиво и интегрирано грDevelopment of Modern Educational Infrastructure in the City of Veliko Tarnovo "under Priority Axis 1" Development of Modern Educational Infrastructure in the City of Veliko Tarnovo "under the Priority Axis 1" Sustainable and Integrated Urban Development "of the Operational Program" Regions for Growth 2014-2020 "lots: Main Site: Gr. 5. Reconstruction and modernization of Alen Mak DG - the investment intentions of the client are related to the reconstruction and implementation of energy efficiency measures in the building. Renovation of furniture, building systems and installations, floor coverings, walls and ceilings, measures to eliminate the causes ofand leakages from the roof and capillary moisture from the penetration of the groundwater surface water, overhaul and improvement of the yard space, creation of an accessible environment for people with disabilities, provision of fire protection requirements for such kind of facilities, overhaul of the building installations and the corresponding thermal insulation measures on walls and roofs to achieve its performanceenergy savings provided in the energy audit for the site. The project envisages the following repair works: dismantling works, floor repairs, swimming pool repairs, wall and ceiling repairs, ceilings and thermal insulation on hanging ceiling, delivery and-installation of joinery - doors, facades - thermal insulation, roof repair, repair of elevators, repair of external steps, repair of existing flooring in pedestrian areas, repair of playgrounds and alleys, new playground for children, playground for children cloakroom, patio, repair fences, parasol, deck of the ashes, patio - atrium, plumbing, sewage, underreplacement of lighting system, repair of electrical switchboards, replacement of boiler installation, subscription in technical premises - swimming pool, heating installation, ventilation installation, solar installation - for 2 pcs. boiler 1 000 liters, solar installation - swimming pool, dismantling works, ventilation installation of boiler, signaling, ventilation and boiler lighting, -wiring of pumps, installation of temperature regulators, gasification The types are working according to the KSU for the object of the position, approved investment project, valid building permit and the technical specification, integral part of the documentation for participation Technical indicators of the site: ZP - 1 234, 51 m and area - 3 495, 59 m. The site is the third category according to art. 137, para. 1, item 3, b"c" and "g" of the SPA and Art. 7, para. 1 in connection with Art. 6, para. 3 of Ordinance No. 1 on the Nomenclature of Construction Types of the Ministry of Regional Development and Public Works. The term for the execution of the public procurement should be no longer than 150 calendar days and not shorter than 120 calendar days. The term for the execution of the construction works starts after the signing of Protocol 2 for opening of the construction site and the level of the site and endswith the issue of Act 15. - The forecasted value in item II.2.6 is the maximum financial resource envisaged. A participant offering a price higher than the estimated value is eliminated Wherever in the notice and / or in the documentation and / or the projects and / or in the quantitative accounts and / or technical specifications and elsewhere in the submission to the participants where it is posdesign, origin, production, patent, type, origin or production to be read "or equivalent." The participant must hold a registration in the Central Professional Register of the Builder at the Bulgarian Chamber of Builders, according to Art. 3, para. 2 of the Chamber of Builders Act, and for a foreign person - in a similar professional or commercial register, in accordance with the legislation of the Member State in which it is established, for the execution of works as follows: - for lot 1 - group I, category III, - for lot 2 - group I, category IV, - for Lot III - Group I, Category III, - For lot 4 - Group I, IV category When submitting the tender, the fulfillment of the requirement is declared in EEDOP, part IV, Section A, point 1, including the relevant national databases containing the declared circumstances or indicating the competent authorities which are required to provide information under the law of the country in which the applicant or the participant is established. shall be submitted by the participant designated as contractor or upon request in the course of the procedure in Artthe students of Art. 67, para. 5 and 6 of the PPL: copy of the document for registration in the CPSR to the Chamber of Builders of the Republic of Bulgaria, according to Art. 3, para. 2 of the CPA for execution of constructions of the required group and category for the respective position; for non-residents - equiv. a document drawn up in accordance with the national law of the participant issued by a competent authority of the State in which it is established proving such a registrationin the case of an association which is not a legal person, the requirement to register is evidenced by each participant in the grouping who will carry out construction in accordance with the distribution of the participation of the persons in the performance of the activities provided for in the unification treaty. Participants point to-the subcontractors' bid and the share of the order they will assign if they intend to use them. Subcontractors must comply with the relevant selection criteria according to the type and the share of the order they will perform and for which there are no grounds for removal from the procedure. For the execution of the order, the participants must hold a valid "Professional"The contracting authority declares the compliance with the selection criteria by filling in the relevant section in EEDOP - Part ІV, Section B "Economic and financial condition", item 5 of the EEDOP, indication of the amount of the insurance policy, its number, the period of validity and by whom it was issued.the person appointed as contractor or on request in the course of the procedure in the cases of Art. 67, para. 5 and 6 of the PPL: In order to prove the requirement, the participants submit a copy of the valid professional liability insurance of the builder, certified by "True to the original" and signature of the representative of the participant. Where, for a valid reason, a participant is unable to submit a postit may prove its economic and financial standing by means of any other document which the contracting authority considers appropriate. In the case of unions which are not legal entities, compliance with the selection criterion shall be demonstrated by the participating grouping and not by any of the persons included therein, except in cases where, according to the distribution-of the participation of the persons in the performance of the activities specified in the contract establishing the grouping, it is stipulated that these persons will carry out construction works. Each of the persons carrying out construction must have the appropriate insurance. The assignor removes from the procedure the participant for whom the grounds under Art. 54, para 1 and Art. 55, para 1, item 1 of the Public Procurement Act, which arose before or duringprocedure. Apart from the grounds under Art. 54, para. 1 of the Public Procurement Act and Art. 55, para. 1, item 1 of the PPA, the assignor removes from the procedure: 1. a participant who does not meet the selection criteria set or fails to fulfill another condition specified in the contract notice or in the documentation; 2. a participant who has submitted an offer that does not meet: (a) the pre-announced terms of the order(a), (b) rules and requirements relating to environmental protection, social and labor law, applicable collective agreements and / or provisions of international environmental, social and labor law listed in Annex 10 to the PPA; a participant who has not submitted the justification under Art. 72, para. 1 of the Public Procurement Act or whose offer has not been accepted according to Art. 72, para. 3-5 of the Public Procurement Act; participantand who are related parties; participants for which there are obstacles to participation in the PPL procedure under the Economic and Financial Relations Act with companies registered in preferential tax jurisdictions, the persons controlled by them and their actual owners; in other cases mentioned in the documentation for participation. 47, para. 4 of the PPL indicate that information: - on taxes and insurance obligations can be found by the National Revenue Agency, - on environmental protection can be found by the Ministry of Environment and Water, - on employment protection and conditions of work can be found by Min. Labor and Social Policy When submitting the tender, the participant declares the absence-the grounds for removal and compliance with the selection criteria by submitting the EEDOP (according to the requirements of Article 67 (1) of the PPL). In case the participant has indicated that he will use the capacity of third parties to prove compliance with the selection criteria or that he will use subcontractors, a separate EEDOP containing the information under Art. 67, para. 1 of-PPL; in the case of unions which are not legal persons, compliance with the selection criteria shall be demonstrated by the participating grouping and not by any of the persons included therein, except for the relevant registration, the presentation of a certificate or other condition necessary for the performance of the the order, according to the requirements of a normative or administrative act and according to the distribution of participation(Article 59 (6) of the PPA) The performance guarantee amounts to 4.5% of the value of the contract, exclusive of VAT, according to the tender and is provides in one of the following forms: 1. cash amount; bank guarantee; insurance that ensures performance by covering the contractor's liabilitywhile the detention and release of the performance guarantee are specified in the contract for performance of the public procurement between the contracting authority and the contractor. The participant designated as a contractor shall choose the form of the performance guarantee and the advance guarantee from the above forms. When the selected contractor is a grouping that is not a legal entity, any of its members may be namedthe bank guarantee, respectively the amount of the guarantee or the insurance policy holder. Upon presenting the guarantee in the form of a payment order, the monetary amount shall be deposited into the account of Veliko Tarnovo Municipality at Municipal Bank AD - FC Veliko Tarnovo: BG97SOMB91303324758001, BIC CODE: SOMBBGSF, when the participant chooses the guarantee to be a bank guarantee, be unconditional, irrevocable and required at first written request in which the contracting authority states that the contractor has failed to fulfill a contractual obligation. Internet address (URL): https://www.veliko-tarnovo.bg Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Construction work was 15 Mar 2018. Bidding is closed.
This tender has been issued by ОБЩИНА ВЕЛИКО ТЪРНОВО in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45200000 - Works for complete or part construction and civil engineering work, 45321000 - Thermal insulation work, 45454000 - Restructuring work, 45421000 - Joinery work, 45331000 - Heating, ventilation and air-conditioning installation work, 45112710 - Landscaping work for green areas.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 20465912. The purchaser document reference is 055879-2018.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.