Object of the contractConstruction work
Description: Contract notice: Construction work
Authority Type: Other
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45000000, 45453100, 45212314, 92522200, 45442300, 45110000, 45262100, 45262300, 45262310, 45262500, 45223200, 45261310, 45261400, 42416000, 45300000, 45310000, 45350000, 45210000, 45262700, 71220000, 71327000, 71321000, 45000000, 45453100, 45212314, 92522200, 45442300, 45110000, 45262100, 45262300, 45262310, 45262500, 45223200, 45261310, 45261400, 42416000, 45300000, 45310000, 45350000, 45210000, 45262700, 71220000, 71327000, 71321000
CPV Description: Construction work.
Refurbishment work.
Historical monument or memorial construction work.
Preservation services of historical buildings.
Surface-protection work.
Building demolition and wrecking work and earthmoving work.
Scaffolding work.
Concrete work.
Reinforced-concrete work.
Masonry and bricklaying work.
Structural works.
Flashing work.
Sheeting work.
Lifts, skip hoists, hoists, escalators and moving walkways.
Building installation work.
Electrical installation work.
Mechanical installations.
Building construction work.
Building alteration work.
Architectural design services.
Load-bearing structure design services.
Engineering design services for mechanical and electrical installations for buildings.
A Hunyadi teri vasarcsarnok műemlek epueletenek (műemleki toerzsszam: 16244.) atfogo-, allagmegovo reconstruction and restoration works and execution of projects in the framework of the project.
Main Site: Budapest - Main Site: Budapest (Hungary)
Main Site: Budapest VI. keruelet, Hunyadi ter 4 5th sam alatyou, 29451 geotagged real estates.
In the framework of the main contractual framework, the works of the Hunyadi Teri parish halls are to be found (works of art: 16244.) atfogo-, allagmegovo felujitas and restauratori work and the execution of souvenir designs. m.
Basic room level level: spaces are useful (net); something elseo basic floor; gross floor level
Pinceszint: 2885 m; 3456 m; Foeld level: 3036 m; 3416 m;
1. floor (hall legter nelkuel): 1464 m; hot water tank: 19 m; 1831 m; Roof terrace level: roof terrace, atjaro: 210 m;
2. floor (hall with square in): 961 m; fuel flow: 9 m; 1246 m; Padlas level: 30 m; gable terrace: 40 m;.
Levels of oesszesen: 8376 m; 278 m; 9949 m.
Artistic aspects figThe main works of art are:
- Reconstruction of halls and halls of internal facades with the following contents: the tegla coatings, the facades of stone facades, the facades of romancement provencals and the reconstruction of the facade arches, the potlas and the reconstruction of the fa�ade arches: : heardaltar: 2746 m, indoor: 1966 m, 4722 m in oesszesen,
- Specialist restoration works: restoration of facade figural relief sculptural discs: 57 facade consoles: 32 pieces of feminine resonance castor parts: 114 pieces plus 86 m,
- Preparation of monolithic reinforced concrete structures: new and reinforced concrete counter-plate structures: 4576 m base, - an interior drainage system for insulating walls: 453 m on horizontal basement flooring,
- 28 168 legm terttatot, 10 meters up to 19 meters, with a large belmagassagu teret covering structure with terallvanyozas fel�jit�sa,
epuelet pinceszintje complete or relative grooves secured uti insulated isolation horizons with water injections (320 wall crossings m), and an internal (wall pillars with anchorage of 2193 m) on the side of the archipelago, and the insulates (with a 2513 m insight on the insulation) are continuously being developed.
More important workforces:
- for heating and heating and heat- the solutions to the 650 maximum maximality are adequateheat pump production system and heating and cooling system, where the heating energy demand is more than 200 kW, and the system is equipped with a heat exchanger system (switching coils more than 150 kW Completion plan)
Design work schedules:
- Design project designas well as the documentation and documentation of the relevant legislation (including the standards, the chambers and the professional rules) as well as the practical and practical content of the project, and the latest edition of 1 digit digital and 3 prints. In addition to this, the extravagance of the seamstones, the exhaustion of the samitas, the sixth and theas soon as the contractor and the purchaser of the dealers' agreement,
- Approved design documentation and documentation of the relevant legislation (including the standards, the chambers and the professional rules) as well as with the content of the realization of the project and the date of the program 1 piece of digital and 1 printed- The cost of the design work on the design and execution tasks of the winner AT is thoroughly discussed in the tender dossier for the contractor, who is responsible for the design and construction tasks of the winning AT. rescue technician dock. tartalalmazza. In the procedure, it is not possible to provide a time-consuming, undervalued, and not necessarily validated, economic operator who is a party to the Kbt. Section 62 para. (1) - (2) exclude the grounds for exclusion under all circumstances. The exclusionary reasons justify a check in the Ajanlatkerő 2 coaches: 1. in the coach of the EEKD basis; 2nd coat of 321/2015. (X.30.) Of the Code of Conduct and the Declarations of the Judgmentthe Kbt. According to Section 69 (4), a circular line. The information on the EEKD industry is contained in the co-procurement documents. Further information According to Section 64. The final decision must be made simultaneously with the EEKD.
Under the exclusionary grounds, no justification for the pool is given in case 321/2015. � 8, � 10, 12-14. � 16, according to Article 16 of the Act, which is eligible to be validin this case, 321/2015. According to Section 15 para. (1) of the Civil Code, in the case of subproblems that are not validly validated, Article 67 (4) and 321/2015. According to Section 15 para. (2) of the Act. In the case of a filing in progress, attachment to the date of filing of the filing of the filing of the filing note and the filing of the filing of the filingin the absence of any other written notice, a negative statement must be filed with the date (� 32 � 13). Article 65 (1) (c)]: - The person who has the time or, if the capacity of an organization or a person in relation to an eligible body (s) applies, (s), the organization that has provided the capacities of the organization to make a statement to the effect that the suitability of the suitability test has not been fully verified.
The organizer or the organizer (s) providing the capacities of the facility shall include detailed information on the completeness of the suitability test, document filenameplease contact us. According to Section 69, the Applicant shall submit a statement to his / her date that he / she fulfills the applicable requirements set forth in Section S.1 / a, the economic operator who has called for the confirmation of the validity of his / permissible or legally permissible subject to a reasonable trial or a�organizer, chamber member's certificate.
SZ.2 / The taxpayer must attach a statement to his / her date that he or she meets the applicable test set out in Section 2 / item 2, a business participant inviting the creditor to submit a claim or an authorization specified in the applicable collective agreement masatati, and the organizational, chambers' tagsagrol solely justified.
KoeStandard will:
W / 1st It is unsuitable for the contractor to fulfill the contractual obligations, provided that the operators involved in the construction of epithetics are not included in the LXVIII. TV., and in the case of non-Hungarian economic operators in the case of non-resident entrepreneursor in the country of residence in the country of residence, with a license, right or organizational or chambers not subject to execution. It is unsuitable for the contractor to complete the contract if, in accordance with the design services related to the bidding industry, in the name of the relevant Chamber of Commerce in Hungary or the non-HungarianIn the case of registered economic operators registered in the country of the resident there is no registered resident of the country of residence or is licensed, legally authorized, or member of the organization or chamber in the country of the resident of the country of residence.Content check is carried out in AK 2: 1. in a single European co-authoring document (EEKD); 2. in box 321 /2015. (X.30.) Cases of Attorneys and Declarations in the Selection Board of the Kbt. Section 69 (4). The complete information on EEKD equipment is provided in the co-procurement documents. AK Advance Verification Modes are Accepted by Time Brokers, Qualified Traders in a Single European Co-Procurement Document IV. simple alpha statementtat arrol to meet the appropriate minimum requirements.
P1. The submitter shall enclose the 321/2015. (X. 30.) Korm. Issued by the Board of Directors of the Board of Directors of the Board of Directors of the Board of Directors of the Bank of Hungary, Today, half of the Penzueli students' pennies have been paid for the pennies, and half of the penitentiary's pennies have been paid off by the deadline for resignation in 24 months of the day, if they had paid for the pennies for 24 hours a day They quit for 15 days allitas, looking at the time when the runner was rushingand when it started to work when these data were available.
P2. Date Added by 321/2015. (S) (19) (19) (19) (19) (19) (19) (19) (1) (c) of the Criminal Code of the Hungarian Civil Codetkozo), a statement about the time when it was written on paper and when it started to work, provided that these data are available.
A 321/2015. (X. 30.) Section 19 (3) and (7) of the Act. Article 65 (8) of the Constitution.
If the time-holder does not have the nameand in the course of the work of the company, it is necessary to produce the necessary information as a result of the performance of the work in question, in accordance with the requirements of the aforementioned criteria, in accordance with the above-mentioned requirements of the aforementioned special requirements.(hereinafter referred to as "mine"). Article 19 (7) is based on the cases in which the official note of the qualified timers specified in Sections 28 and 36, in the light of Sections 30 and 39, proves that the economic operator is in compliance with the specific experimental test, the classifiedthe European Union may submit a certified copy of the official list to the list of approved members of the public by a list of economic operators established in a different Member State and shall be subject to the acceptance of any other document referred to in paragraph (1) justified mods placet.
A 321/2015. (X. 30.) Section 19 para. (6) of the Criminal Code in the present framework. (X. 30.) of Section 1 (2) of the Criminal Code must prove that it complies with the special provisions applicable to the period of validity. (X. 30.) Section 1 para. (5) of the Constitution.
The Kbt. Section 65 (7) of the Constitution shall be based on the appropriate test procedurethey can meet the needs of all the masses or individuals, and the tiredness of the loose relationship is legal. In this case, Article 65 (8).
For the purpose of limiting the EU's fees, AK provides additional information in VI.3. In the case file.
III.1.3. M2.6. min. 1 person silicate restorationand / or a specialist specialist in this field, who, on the basis of his or her qualifications and professional experience, complies with 439/2013. (XI. 20.) Government Order no. you claim your activity as a matter of urgency in your inventory. Atheists are not allowed by the experts to experiment.
1. Felhivas IV.2.6) "Duration in the month: 2" 60 days
2. AK is the P / 1, P / 2, M / 1, M / 2 suitability test for the qualifiedIt has been harder to put on AT's official list of drafts. The formal requirements of the time-table are: according to KD
4. The following statements and documents are in the affirmative, in accordance with the provisions of the KD:
- Readmission (Section 66 (5) (8))
-Alairasi cimpeldany, subordinate sample, authorizations
�(The declaration under Section 66 para. (6) of the Kbt. shall be made in the One-Sided European Debit Documentary Document) .- - - - - - - - - - - - - - .
Declaration on the Kb. Section 65 (7) (also in neutral content).
-Declaration on the Kb. Article 66 (2) (4) .
-Accompanied expert and expert advice on how to look at the aspects of the subject matter as outlined in the co-procurement documents. CA on the Kb. Section 35 (9) the basis of the project portfolio is excluded.
6. CA on the Kb. Section 75 (2) (e) shall not apply. AK is the timing provider of the time you are trying to get the time you want�must be forgiven until the expiration of the deadline, and the timing of which should be timely. According to the time of the bidder, the Kbt. Article 54 paragraph (2). The rates for the timescales are 20 billion HUF. US $ 10620106-00043401. You must attach a document with a blank document to the request.
8. AT's smust have at least 30, 000, 000 HUF / year and 10, 000, 000 HUF / caretaker designers with a liability liability of at least HUF 1 000 000 000 per month with a minimum liability of HUF 200, 000, 000 / equivalent of a caretaker installment, or the existing liability insurance is extended to the present contractual term in the same sense, for which thea nlataban statement is pleasing to you.
9. CA on the Kb. (4) of Section 131 of the Constitution, or, in the case of a repurchase thereof, for the purposes of listing the most favorable time when it has been designated by the party in the merger of the merger. The full timepiece in vhas well as all the time given in the previous paragraph, should be calculated according to local time in koezep-europai. (CET)
the eleventh The provisions of the documentary, as well as the CXLIII. toervent and executable order. the ireland.
12. The AK consultacio held a non-scheduled local beyad, the date is February 01, 2018, 9:00 am. Place: Buyou are here VI. keruelet, Hunyadi ter 4 No. 5, .
13. FACS: Szabo Balazs (OO351), 1027 Budapest, Bem rakp. 43.,
[email protected].
14. The Kbt. According to Article 57 (2), documents must be submitted by AT or by the electronic signature of the subcontracted named at the time until the expiry of the time-limit. At the same time, documents must be registered with a registered email at the same timeniuek the 1.3. the following information: host name, address, contact name, email address.
15. The CA does not provide the opportunity with respect to the technical assistance of the bureaus.
Internet address (URL): http://www.tvvrt.hu
Directive: Classical Directive (2014/24/EU)