Expired Tender Bulgaria ICB TOT Ref. 19870517

Contract notice: Construction work Tender in Bulgaria - 19870517

Tender notice from Bulgaria, published on 18 Jan 2018.

Executive Summary

The КМЕТ НА ОБЩИНА ХАСКОВО has issued a Tender notice for the procurement of a Contract notice: Construction work in the Bulgaria. This Tender notice was published on 18 Jan 2018 and is scheduled to close on 23 Feb 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 19870517, while the tender notice number is 022274-2018 and Register on the platform.

Key facts

Summary
Contract notice: Construction work
TOT Ref. No.
19870517
Document Ref. No.
022274-2018
Country
Bulgaria
Notice type
Tender
Competition
ICB
Publication date
18 Jan 2018
Bid deadline
23 Feb 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work
Description: Contract notice: Construction work
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 45000000, 45421000, 45443000, 45400000, 45331000, 45260000, 45000000, 45421000, 45443000, 45400000, 45331000, 45260000
CPV Description: Construction work.
Joinery work.
Facade work.
Building completion work.
Heating, ventilation and air-conditioning installation work.
Roof works and other special trade construction works.
Прилагане на мерки за енергийна ефективност в ДГ 3 „Зорница" — сграда „Незабравка", ул. „Добруджа" № 59, гр. Хасково.
Предмет на настоящата обществена поръчка е „Прилагане на мерки за енергийна ефективност в ДГ 3-"Zornitsa" - building "Nezabravka", 59, Dobrudzha Street, Haskovo ".
Main Site: Gr. 59, Dobrudja Str., Haskovo The planned construction works are planned for implementation of energy efficiency measures in ZZ Zornitsa 3 - building "Nezabravka" The two-storey building was built in 1981 in Regulated Plot I, 491, Haskovo and has the following technical parameters: WP 993, 0 m, total built-up area 1 665, 0 m. The envisaged energy savingThe measures included: replacement of window frames, thermal insulation of external walls, roof and floor, construction of heating and boiler installations, as well as installation of a solar installation
The envisaged works in connection with the energy saving measure "Replacement of joinery" are the following: installation of 479, 3 m new PVC window frames and double glazing with heat transfer coefficient U = 1, 7W / m2K The same will be installedand after dismantling the existing old wooden window frames and metal doors. Part of the old metal doors (2, 61 m) will be replaced with new solid metal doors with thermal insulation of mineral wool. The following additional activities are also foreseen: reversal of openings around doors and windows with 912, 4 m XPS 2 cm with l = 0, 030 W / mK, including plastering and subsequent application of silicone plaster from the outside. Inside-it is planned to turn corners around windows and doors with a 624.75 m plasterboard directly glued at a total width of 20 cm, only the upper corners of these openings will be turned by a 287.65 m polystyrene profile. There is also a delivery and installation of 252.9 m aluminum window panes for windows from the outside, and inside of a 252.9 m PVC window sill.
The envisaged works in connection with the energy saving measure "Heatexternal wall insulation "are as follows: laying on facade walls of 948.59 m thermal insulation of graphite EPS 7 cm with coefficient of thermal conductivity l = 0.032 W / mK / walls first and second floor, without plinth / The same graphite EPS will be applied and on the hoods with a total area of 27, 16 m. After applying the heat insulation on the same area of the facade walls and the visors, it is planned to plaster, primer and apply siloplasterboard / structure 2 mm /. Plastering, priming and laying of silicone plaster is also planned externally on chimneys / without sockets /, rails, ceilings on terraces, as well as external columns - all with a total area of 287.12 m. Concomitant dismantling and assembly activities 750 m facade scaffolding, 8 air conditioners, 7 meters of drainage pipes, the latter being replaced with new ones.Also, new metal profiles for vertical thermal insulation, profiles for sealing of deformation joints, mounting aluminum profile in the area of the socket and angular profiles with water dripping function on the hoods are to be installed
The envisaged works in connection with the energy saving measure "Roof renovation" are the following: laying of 955.06 m thermal insulation on a roof of 15 cm pressed mineral wool withthe thermal conductivity factor l = 0.039W / mK. The upper part of the board will be heat insulated with 85.23 m XPS 3 cm thick and heat conductivity l = 0.030 W / mK and the rest of the board will be heat insulated with 127.85 m mineral wool 5 cm thick. Under Heat on the roof on the same area of 955.06 m should be laid geotextile, and on the thermal insulation on the roof - waterproofing of PVC mebanana. The installation of new PVC coated sheets is envisaged for the purpose of restoration of the sheet metal before the installation of the waterproofing.
The envisaged construction and assembly works in connection with the energy-saving measure "Rehabilitation of the basements / ceilings" are the following: laying the insulation of the base - 96, 94 m XPS 6 cm thick and thermal conductivity coefficient l = 0.030 W / mK, as well as subsequent plastering and layingBlusher of frost-resistant granite tiles. In a section of 13.32 m, a 10 cm thick XPS will be laid with the same characteristics due to the irregularities in the part of the socket. heating radiators and 2400 m black gas pipes. New 124 aluminum radiators of different sizes (according to Pro) will be installedect. Continuing in Section VI.3 The Applicant must hold a Certificate of Registration in the CPSA for Group 1, Group A, minimum Group III construction works.
When submitting the tender, the fulfillment of this requirement is declared in Part IV, Section A of EEDOP, national databases containing the declared circumstances or indicating the competent authorities that agreethe law of the country in which the applicant or the tenderer is established shall be required to provide information. In order to prove the requirement, the participants shall submit a copy of the Certificate of Registration in the CPSP certified by "True to the original" and signature of the representative of the participant under the terms of Article 67, Paragraphs 5 and 6 of the Public Procurement Act.1 To prove the requirement under p.1 from "required minimum level" participantsthey provide a proof of their professional liability insurance "Professional liability of the builder" certified by "True to the original" and signature of the representative of the participant under the conditions of Art. 67 para. 5 and 6 of the PPA. Participants fill in the relevant information in Part IV, Section B, paragraph 5 of the EEDOP. Applicable item 12.1 of the documentation for participation. To prove the requirement under item 2 of "Requirement. min level "--participants submit a copy of the annual financial statements or parts thereof, when required, certified true to original and signature of the participant's representative under the terms of Article 67, paragraphs 5 and 6 of the PPA, as well as a statement of the turnover construction, to be completed in Part IV, Section B, point 2a of EEDOP Where, for a valid reason, an applicant or participant is unable-to submit the documents requested by the contracting authority, he may prove his economic and financial standing by any other document the contracting authority considers appropriate. Applicable item 12.2 of the documentation.
1. For the participants in the procedure, the circumstances under Art. 54, para. 1 of the Public Procurement Act and Art. 55, para. 1, item 1 and item 3-5 incl. of PPL.
2. In accordance with Art. 104, para. 2 of the HThe OP in conducting the current procedure will evaluate the participants' technical and price proposals before examining the documents for compliance with the selection criteria. The estimated value of the order specified by the assignor represents the maximum price for the execution of the order. Participants who have offered a performance fee that exceeds the price specified by-the estimated value of the assignor will be removed from participation in the procedure. In connection with the possibility that Art. 114 of the Public Procurement Act provides that, with this announcement, the Contracting Authority states that no funding has been provided at the date of initiation of the procedure. In this sense, the performance of the contract is postponed until the date of signing the Financing Agreement between the National Trust EcoFund and thethe beneficiary (as beneficiary). Either party may request the termination of the contract in writing without notice after the expiration of three months from its conclusion in the case of unsecured financing. Further information is contained in the draft contract. This procedure is funded by funds provided by the NTEF under the terms of Art. 114 of the PPL.
Continuation from Section II.2.4. It is also planned to install the necessary new joining fasteners and pipes. Another boiler installation is planned to be constructed after dismantling (and removing) the available hot water boiler, 4000 l DHW cylinder, 2 manifolds, F300 fuse and 2 water circulator pumps. It is necessary to install a new combustion oil burner with a counter flow meterthe project and a new hot water boiler for liquid and gaseous fuel - 308 kW, with a heat meter. This also involves the installation of the necessary new control devices, attaching fasteners, pipes and elbows. The new solar installation will consist of 12 solar collectors type "vacuum" with Aabs = 1.42 m. The solar installation is also planned to install the necessary new control devices, connecting fasteners, pipes and elbows
Internet address (URL): www.haskovo.bg
Directive: Classical Directive (2014/24/EU)

Documents

Tender Notice
Login to view

Similar tenders

Bulgaria Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work was 23 Feb 2018. Bidding is closed.

This tender has been issued by КМЕТ НА ОБЩИНА ХАСКОВО in Bulgaria.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45000000 - Construction work, 45421000 - Joinery work, 45443000 - Facade work, 45400000 - Building completion work, 45331000 - Heating, ventilation and air-conditioning installation work, 45260000 - Roof works and other special trade construction works.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 19870517. The purchaser document reference is 022274-2018.

See the Similar Tenders section on this page or browse other tenders from Bulgaria.

This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.