Object of the contractConstruction work
Description: Contract notice: Construction work
Authority Type: Other
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45000000, 45210000, 45214200, 45214220, 45262690, 45000000, 45210000, 45214200, 45214220, 45262690
CPV Description: Construction work.
Building construction work.
Construction work for school buildings.
Secondary school construction work.
Refurbishment of run-down buildings.
Szent Gellert Katolikus Altalanos Iskola es Gimnazium felujitasa es bővitese uj szarnnyal.
Szent Gellert Katolikus Altalanos Iskola es Gimnazium felujitasa es bővitese uj szarnnyal.
Main Site : 1012 Budapest, Kosciuszko Tade utca 3. HRSZ. 7591
Beruhazasi program:
There are currently a few things to see on the site: the main hall, the gymnasium and the dog sledding. The parish priest in 1897 was the owner of the cellar. 2 floors with high ceilings, fully furnished with a basic floor, with a large floor-topped lounge area. The gymnasium and the grooming bar can be explained at the same timeepuelt, 1930 cockerel. Both are foam-like, lightweight tegla wall tiles, with a clearing effect.
Megbizo celja is an up-to-date and expanding existing school tuition in accordance with modern pedagogical requirements. In the framework of the present project, the modernization of the existing parish office (electrically, electrically, inexpensive interior lighting, floor heating, padlock heat insulation), the existing gymnasium(electric, electrically) and expanded with a new foeld level gymnastics, and in the bontando oesszekető furry place the new cellar is a layered floor plan, the flat roof epithel is the epitome of it, closely related to other Bontasi-epitesi works and terrain.
The epic has existing joints, which I currently have the school's status. For example, In the past few years, the goblet body was discontinued. During the renovation and expansion of existing buildings, existing water and waste water will be preserved, and a new water and a new gas-fired circus will be created.
The technical content and details of the berth:
- existing up-to-date local drainage modernization: gross 3100 m,
- modern upgrading of untrained epithet: gross 300 m,
- existing discharged epithet: gross 200 m,
- new epueletszarny formation: gross 600 m,
- existing cellar walls with a suction system with a suction drip plate insulation: 246 m.
- on swapped ground lined floor coverings with soil waterproof plate insulator: 626 m,
- insect seals against soil moisture: 170 cross-sectional m,
- insect repellentstAlt toembszigeteles 91 felueleti m,
- padlasfoedem heat insulation configuration at the existing epueletben: 880 m,
- vakolatjavitas in 50 to 75% vakolatpotlas existing, kerueleti local protection allo wall: 353 m
- new brick fa-ade design: 326 m,
- existing rectilinear restoration: 174 pieces,
- new archipelago inscription: 77 pieces,
- interior padlocks and wall coverings replacementin the case of existing: 3200 m,
- auxiliary coatings: 59 m,
- installation of a new gas boiler with a fire extinguishing system complete: 3 pieces
In case of a concrete type, the "or with the same" is always included. The description and the description of the contents are given in the following documents:-it may not be time-consuming, sub-contracted, and may not be considered as a legitimate economic operator against whom the Kbt. (1) - (2) of Section 62 of the Constitution. The listener excludes from the list the time-maker, the sub-contractor or the eligible organization, against which a certain reason for the above mentionedthat's it. A timely, verifiable, economic operator is a 321/2015. (X. 30.) Korm. Of the Ministry of Transport and Communications on the basis of Article 1 (1) The grounds for exclusion under - 62 are dense. A 321/2015. (X. 30.) Korm. Of the Act on the basis of Article 15 of the decree on the basis of the-only organization aspects of the single European koezbeszerzesi to submit that document koeteles Yes. grounds for refusal pursuant to - 62 of the lack of justification in order.
The marriage justify the submission of economic operators called the 321/2015. (October 30) Decree 8-14.. must certify in accordance with - - 16 section and that not one of the grounds for refusal SUBJECT. The subcontractor with regard amthey will not be able to prove that the Applicant is fit to do so. (4) of - 67.
In the case of exclusionary reasons, the date, the subproblems and the date of the subpoenas that have been requested to justify the amount of the allowance shall not be longer than the date of the present invocation. to justify-check out the latest updates. In the first case, the ESPD document is based, and in the other case it is 321/2015. (X.30.) Kormr. according to the Kbt. Article 69 (4) please write a letter to the Registrar. Section 64 (1) to (2) The opportunity to give the attention of the users.
The fullness of the test of the justification for exclusionthe European Commission may use a web site created for this purpose. The format of the electronic form can be found at: http://eur-lex.europa.eu/legal-content/EN/TXT/uri=CELEX:32016R0007.-A Kbt. Article 65 (1) (c) and 321/2015. (X. 30.) Korm. Of the Ministry of Economy and Finance on the basis of Article 26 (1) (a) and 322/2015. (X. 30.) Korm. Decree 21 (1) appliesin order to provide the timer with the formulation and application of the embossed coat of year 1997, LXVIII. toerveny (Etv.). A non-member country based in the Republic of Hungary shall be entitled to complete the contractual term if it is in accordance with Article XI of EU Directive 2014/24 / EU. vthe brains are in compliance with the test procedures contained in the referenced breasts.
The timing of the breech test is to testify that the suitability test is complete. Article 69 (4) of the Act on the Appointment of a Hungarian Employer is not accompanied by a non-probative document.-from the palm of the register. Article 65 (1) (a) and 321/2015. (X. 30.) on the basis of Article 19 (1) (c) of the Regulation, the applicant shall attach to the previous three-month notice the deadline for the submission of the summons to the deadline for submission of the summaries, it is necessary to find out when the time was spent on paper and when it started to work, provided that these data are available to you.
Subject to 321/2015. (X. 30.) Korm., If the Righteous Person is in a legal form in respect of which the declaration of arbevetel is not possible, he shall receive these pointsinstead of a suitable test method and a verifiable mod, any such statement or document may be used to justify the pennies and the economic capacity. The well-being of a well-timed or recruited recruiter is to prove that he is in a legal form in which he or she is involvedIt is not possible to make a statement about the arbevetel, and to make sure that you do not have the opportunity to prove the modalities and the verifiable modalities for these points. (X. 30.) Korm. - In the given time, the buyer is obliged to declare, -so that the appropriate test conditions of the altale can be fulfilled. A 321/2015. (1) and (2) of Section 1 of the Decree No. X. (X. 30.) of the Government of the Republic of Croatia, in accordance with Article 3 of the Single European Charter Document, must provide proof of the date of receipt of the application for a sufficiency test (ESPD α) If the Issuer is a Bidder. Section 69 para. (4)If you give them the time, you will be asked by the Jury only in the case of the Referee, if you have the Provider to submit the Verdicts. (4), accepts the statement of the Beneficiary in which only those statements which are based on the appropriate test methodThe reader can be checked in the correct time period.
1) Section 56 may be based on a supplementary information sheet in the time period and in the case of the documents referred to in Section I, point 3, of the Terms of Reference (
[email protected] and / or 36 28 200 210). A kerdesktops can be smudged in editable form. Attorneys call attention to the Kb. (4) of - 41.
2) The promoter shall provide a local beacon with the appropriate time schedule, starting on 13 December 2017, starting at 10:00 00 minutes. Location of the building: 1012 Budapest, Kosciuszko Tade street 3rd main entrance. Timekeeper calls up the timers to see himThere is no possibility to ask for a solicitor in the lawsuit, and to ask for a case in advance, in accordance with the rules of the supplementary courtesy.
3) CXLIII in 2015 will not be published in the coffers and co-tender documents. the provisions of the decree and the regulations are the iranadas. Gift Provider is Kb.
4) All other information about the time period, the statements and any other information contained in the submission of the verdicts are contained in the contract documents.
5) Attach any other information to the periodical employee and the co-authoring document as well as to the Kbt. according to the forerunner of the document, and the document not mentioned above, which is the complete date(7) The winning bidder is the lowest of 400 million HUF / year and 100 million HUF / cash prize draw at the time of the contract, at the time of the contract, and in the case of the co-authoring documents, to cover or extend the professional liability officer for the work of a hedge fundeni.
8) Accepting a draft contract in the Covenant Document is an essential element of the term. The contingent attachment of the undersigned does not seem to be an issue.
9) The Provider excludes the possibility of disregarding. The workflow of the rebuilding process takes place in parallel with each other, and is closely linked to one another, so the precise technical breakdown of certain rocks can not be achieved.
10) The total amount of time that is given in the above mentioned timeframe and documentation is based on Hungarian local time. The Bontast Tenderer will start with the exactido.com information base.
11) The Tenderer will enclose a statement to the Kbt. (Original) of Section 66 (2), as well as a statement on the Kbt. According to Article 66 (4). The attachment to a non-declaration is also a test.
12) Attach to the Provider:
- The Provider's statement on whether he / she has filed a Variable Registration Record that has not been filed in the Registry of Registry / Registrar's Office. Attachment of a non-declaration is also probable, - If a data recorder (or data modifier) is being processed in the data provider (s), in the case of the excluded entityn shall be accompanied by the printed version of the electronic records relating to the register and the printed version of the electronic certificate issued by the collector. In the case of activities carried out within the framework of the activities, the registry / co-ordinating body / chamber / notary (s) shall be accompanied by a simple copydanyat too.
13) The qualifying features and their provisional modalities for the qualifying criteria of the qualified listener are listed strictly.
14) Scenario: points 0-10. 1st res. scoring, 2nd scoring. Straight Gold Position, 3rd Ring. Translated by: KH utmutato. See Decization Documents
Further VI.4.3. point
.
Internet address (URL): http://www.esztergomi-ersekseg.hu/
Directive: Classical Directive (2014/24/EU)