Expired Tender Poland ICB TOT Ref. 18826084

Contract notice: Construction work Tender in Poland - 18826084

Tender notice from Poland, published on 02 Dec 2017.

Executive Summary

The SKARB PAŃSTWA PAŃSTWOWE GOSPODARSTWO LEŚNE, LASY PAŃSTWOWE, NADLEŚNICTWO OŚNO LUBUSKIE has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 02 Dec 2017 and is scheduled to close on 10 Jan 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 18826084, while the tender notice number is 483224-2017 and Register on the platform.

Key facts

Summary
Contract notice: Construction work
TOT Ref. No.
18826084
Document Ref. No.
483224-2017
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
02 Dec 2017
Bid deadline
10 Jan 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work
Description: Contract notice: Construction work
Authority Type: Other
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 45000000, 45200000, 44212200, 45213332, 45223500, 45310000, 45400000, 71322000, 45000000, 45200000, 44212200, 45213332, 45223500, 45310000, 45400000, 71322000
CPV Description: Construction work.
Works for complete or part construction and civil engineering work.
Towers, lattice masts, derricks and pylons.
Airport control tower construction work.
Reinforced-concrete structures.
Electrical installation work.
Building completion work.
Engineering design services for the construction of civil engineering works.
Zaprojektowanie i wybudowanie systemu monitoringu do celow ochrfire protection in the Ośno Lubuskie Forest District together with the delivery and installation of equipment for fire localization.
Reference Number: SA.270.2.4.2017
The subject of the order is design and construction of a steel mast with a height of 60, 00 m npt, maintained in balance by means of rope lifts, mast lattice structure and cross-section of the triangular triangle, according to the design of the executionawcy and technical specification together with the delivery and installation of fire monitoring equipment, and adaptation of the existing fire detection system for mounting a fire monitoring camera The mast will be used as part of the forest fire protection system in the area of the Nadleśnictwo Ośno Lubuskie.
Main Site: Land of the Nadleśnictwo Ośno Lubuskie:
The object of the order is design and builte monitoring system for fire protection purposes in the Ośno Lubuskie Forest District along with the delivery and installation of fire detection equipment. Task in the system design and build. Design and construction of a steel mast with a height of 60.00 m, maintained in balance using rope pullers, lattice construction and cross-section of the triangular triangle, according to the designand technical specification. The order includes: a) the general concept of the object, b) the construction design (PB) of the mast along with the land development in paper version (4 copies) and digital (1 CD),
c) the project of connection nn for the mast in accordance with with the connection conditions possessed by the contracting authority, d) obtaining legally required documents necessary to issue permitsfor construction, including: obtaining a decision on environmental conditions for the implementation of the project or an appropriate opinion on the lack of decision (if applicable), obtaining a declaration of the authority responsible for monitoring Natura 2000 sites and declarations of the competent authority responsible for water management (if applicable), and obtaining a building permit on behalf of Zama(e) executive design (PW) in paper version (2 copies) and digital (1 CD),
f) execution of construction and installation works in accordance with the design documentation and building permit and project for modernization of fire monitoring constituting Annex 1B to SIWZ, including: - - temporary robot and earthworks, - foundation of the mast in accordance with the design documentation and-technical specification,
- prefabrication, delivery and assembly of mast and lashing elements in accordance with the design documentation and technical specification, - lightning protection installation in accordance with the design documentation and technical specification, - electrical installation of the power connection in accordance with the connection conditions available to the ordering party nn network, developed harnessednio connection design and technical specification, - a radio-line installation used for transmitting signal from devices installed on the mast ultimately to receiving devices in the PAD building of the Nadleśnictwo Ośno Lubuskie (based on the fire monitoring project owned by the contracting authority, constituting Annex 1B to SIWZ ). - a cable installation for signal transmissionfrom the radio station installed on the tower at the headquarters of the Forest Inspectorate to receiving devices in the PAD Forest Inspectorate (based on the fire monitoring project owned by the contractor, constituting Annex 1B to the SIWZ).
- prefabrication and assembly of steel structures for the installation of equipment and devices monitoring system on existing facilities, observatories (perform-based on the fire monitoring monitoring project owned by the client constituting Annex 1B to SIWZ),
g) preparing and submitting to the Employer complete as-built documentation constituting design documentation supplemented with a construction log, partial acceptance and final acceptance protocols, as-built map, as-built surveying survey, and vertical measurementconstruction, installation instructions for operation of the facility, setting up the object book, obtaining a usage permit,
h) obtaining a reconciliation with the Civil Aviation Office and the Armed Forces of the Armed Forces Movement for the planned mast construction H = 60m,
and ) preparation of other documents legally required for obtainingThe characteristic parameters and description of the requirements of the ordering party in relation to the subject of the order in detail are described in the Functional and Functional Program constituting Annex 1A to the ToR and in the Fire Monitoring Project modernization project. constituting Attachment 1B to the ToR.
The Ordering Party does not set specific requirements regarding the description of spThe ordering party does not make any particular requirements regarding the description of compliance with the condition of participation in the proceedings with respect to the condition regarding economic capacity. The condition with respect to the financial situation will be fulfilled if the Contractor demonstrates that he has financial means or creditworthiness. In order to confirm the lack of grounds for exclusion-from the proceedings and in order to confirm compliance with the conditions for participation in the proceedings, the Contractor will be required to provide the Employer with a Contractor's statement constituting preliminary confirmation of compliance with the conditions for participation in the procedure and no grounds for exclusion, submitted on the uniform European order form.Concerning the financial situation, the Contractor will be obliged to provide the Employer with the information of the bank or cooperative savings and credit union confirming the amount of funds held or the creditworthiness of the contractor, in a period not earlier than one month before the deadline for submission of tenders. If for justified reasons the contractor can not submit documents regarding pthe financial or economic situation required by the customer, he can submit another document, which sufficiently confirms fulfillment of the condition of participation in the procedure described by the orderer.
The Contractor will be required to submit the documents within the deadline indicated by the Employer, not shorter than 10 days, specified in the request sent by Ordering party to the Contractor after openingoffers. The documents should be up to date on the day of submission designated by the Employer. The assessment of compliance with the conditions for participation in the proceedings will be made according to the formula "meets" / "does not meet", based on information contained in EED, then confirmed in documents or statements made by Contractors. Contractors who are not subject to hatching may participate in the proceedingsfrom the procurement procedure in the circumstances referred to in Article 24 sec. 1 item 12-23 of the PPL, art. 24 sec. 5 points 1 and 4 PzP. - List of statements and documents:
1) In order to confirm the lack of grounds for exclusion with progress. and to confirm compliance with the conditions for participation in progress. The Contractor will be required to provide the following statements and documents: - a) ośw. Contractors constituting-preliminary confirmation of compliance with the conditions for participation in the procedure set out in this SIWZ and no grounds for exclusion, submitted on the single European order form document (hereinafter referred to as "EAT"); regarding technical or professional capacity in the field of experience have been carried outd) duly, especially information on whether works were carried out in accordance with the provisions of construction law and properly completed. c) information from the bank or cooperative savings and credit union confirming the amount of funds held or the creditworthiness of the contractor in a period not earlier than one month before expiry of the deadline for submitting bids,
d) a copy from the relevantabout the register or from central records and information on economic activity, if separate regulations require an entry in the register or records, in order to confirm the absence of grounds for exclusion under Art. 24 sec. 5 point 1 Pzp;
e) certificate of the competent head of the tax office confirming that the contractor is not in default of paying taxes, issued no earlier than 3 months beforethe date of submission of bids or other document confirming that the contractor has concluded an agreement with the competent tax authority regarding repayment of such receivables with possible interest or fines, in particular obtained legally permissible, postponement or installment payment of overdue payments or suspension in full of the implementation of the decision of the competent body;
f) responsible certificateand the local organizational unit of the Social Insurance Institution or the Agricultural Social Insurance Fund or other document confirming that the contractor is not in arrears with paying social security or health insurance contributions, issued not earlier than 3 months before the deadline for submission of tenders or other document confirming that the contractor has concluded an agreement with the competent organem regarding the repayment of these receivables together with any interest or fines, in particular obtained legally permissible, postponement or payment of overdue payments or suspension of the execution of the decision of the competent authority in full,
g) information from the National Criminal Register in the scope specified in art. 24 sec. 1 pts 13, 14 and 21 Pzp, issued not earlier than 6 months prafter the deadline for submitting bids,
h) ośw. on the lack of grounds for exclusion of certain Articles 24 sec. 1 point 15 and 22 Pzp;
i) axis. contractors not to pay taxes and local fees, referred to in the Act of 12.1.1991 on local taxes and charges (Journal of Laws of 2016, item 716).
2) Ośw. about belonging or not belonging to the same capital group.
3) Undertaking obligationtow to hand over to the Contractor the necessary resources to fulfill the order if the Contractor relies on the technical or professional capacity or financial or economic situation of these entities.
The Ordering Party requires a security deposit of PLN 10, 000.
All relevant for the parties, the provisions contain the model agreement that constitutes. No. 7 to the ToR. The contract will be concluded on the basis ofin the Bidder's offer. The Employer provides for the possibility of changing the provisions of the contract in relation to the content of the offer, based on which the Contractor was selected, in the event of at least one of the circumstances mentioned in it, taking into account the conditions of their introduction given in the formula.
Internet address (URL): http://www.osnolubuskie.szczecin.lasy.gov.pl/
Directive: Classical Directive (2014/24/EU)

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work was 10 Jan 2018. Bidding is closed.

This tender has been issued by SKARB PAŃSTWA PAŃSTWOWE GOSPODARSTWO LEŚNE, LASY PAŃSTWOWE, NADLEŚNICTWO OŚNO LUBUSKIE in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45000000 - Construction work, 45200000 - Works for complete or part construction and civil engineering work, 44212200 - Towers, lattice masts, derricks and pylons, 45213332 - Airport control tower construction work, 45223500 - Reinforced-concrete structures, 45310000 - Electrical installation work, 45400000 - Building completion work, 71322000 - Engineering design services for the construction of civil engineering works.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 18826084. The purchaser document reference is 483224-2017.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate, Materials and Products in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.