Contract notice: Construction work Tender in Switzerland - 17378985
Tender notice from Switzerland, published on 16 Oct 2017.
Executive Summary
The OFFICE FÉDÉRAL DES ROUTES — INFRASTRUCTURE ROUTIÈRE OUEST — FILIALE ESTAVAYER-LE-LAC has issued a Tender notice for the procurement of a Contract notice: Construction work in the Switzerland. This Tender notice was published on 16 Oct 2017 and is scheduled to close on 20 Nov 2017, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 17378985, while the tender notice number is 408667-2017 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Ministry or any other national or federal authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: GPA Award criteria: The most economic tender CPV code: 45000000, 45233210, 45000000, 45233210 CPV Description: Construction work Surface work for highways. N09.52 100020 - Ant. Montreux - Roche - Coating work on the N09 (ID 4850). The reconstruction of the bituminous enrobes includes the renewal of the tread and, if necessary, the tie layer on the motorway. Traffic count probes and relevant weather probes will be replaced. The markings aMain site: Highway N09 between Chexbres and Villeneuve, maintenance center of Rennaz and subsidiary F1 of the OFROU in Estavayer-le-Lac (seances). The work of rehabilitation of the bituminous enrobes include the renewal of the tread and, where applicable, the tie layer on the highway. Traffic count probes and meteorological probesconcerned will be replaced. The markings are composed of the following sections: Junction of Vevey: - Chaussee Lac - Ax N9 - km 26.556 a km 28.600 and km 29.200 a km 29.900, - Chaussee Montagne - Ax N9 - km 26.557 a km 29.000, - Cross-road Lake - Axis N9_VEYR - PR 100 a 122, - Counter-road Mountain - Axis N9_VEYR - PR 200 a 224, on the Vevey road up to the Hauteville road, - Ramp N12 - N9 towards Villeneuve on 400 m from km 72.345. Montreux - Villeneuve: - Chaussee Lac - Ax N9 - km 35.245 km 35.365 km 37.500 km 40.300, - Chaussee Montagne - Ax N9 - km 35.245 to km 35.425 and km 37.500 to km 40.300. The following certificates / confirmations must be filed at the same time as the tender dossier meas may be otherwise specified; In the absence of an offer, the tender will not be considered: Q1 Technical capacity: Q1.1 Reference of the tenderer: A reference work of comparable complexity, carried out in the same specialized field. In addition to the description, the dates, the amount of work and the name of the client will be indicated. For works carried out in a consortium, the company iindicates the nature of the tasks carried out by him and the percentage share of his services on all the works. The company indicates the works in reference realized by subcontracting. Q1.2 Quality system: Valid certificate of a quality system according to ISO 9001 or a system of management of the equivalent quality recon Q1.3 Subcontracting: 50% maximum of the service can be provided by subcontracting. Q2 Economic and financial capacity: Q2.1 Turnover: Annual turnover is more than twice the annual amount of the contract. Q2.2 Documents to be submitted: Documents a remewith the offer of the tenderer: - Voluntary declaration of the tenderer (signed); - Extract (s) from the commercial register or, for companies having their seat abroad, similar certificate (s) dated less than 3 months in relation to the deadline for submission of the tender). Q2.3 Certificates to be submitted after the tender has been submitted: Certificates to be delivered after submission of the tender by the tenderer- on the request of the grantor within 7 days: - extracts from the register of prosecution (more recent than three months compared to the deadline for submission of the tender); - justifications for current payments for AVS / AI / APG / AC, as well as SUVA and AFC; - justifications for current BVG payments; - professional liability insurance certificate (s) for damage and settlementsQ3 Key data: Q3.1 Key person reference: A reference work of the key person (*) relating to the project of comparable complexity, fully realized, indicating the period, the overall investment of the project, the work executed and the interlocutor (Client) authorizes to provide information.A key to criterion Q3.1 is the person who will perform the duties of the work supervisor (responsible for the conduct of the work, the main contact person for the DLT). Q3.2 Availability: Proof that the availability of key persons (*) is greater than or equal to the availability required for the duration of the project. Detailed description and description of the load in the(*) As key persons for criterion Q3.2, the person performing the duties of the operator of the work and the person performing the duties of the foreman shall be considered. Partial offers are not permitted. Conditions for countries not adhering to WTO agreements: none Negotiations: remain reservedConditions governing the procedure: the contracting authority awarded public contracts for services in Switzerland only to successful tenderers who guarantee compliance with the provisions on the protection of work, the conditions of employment of employees and employees as well as equality of wages between men and women. Other indications: 1) Criteria for awarding contracts C1 Price [50%]-Evidence for this criterion: price serie. Elements of judgment: the price considered for valuation is the amount of the offer with discounts, without discount and without VAT, after control by the proxy of the MO and correction of the arithmetic errors. Prices are priced according to the following method: the maximum score (5) is allocated to the revised offer at the lowest price. Tenders, the price of whichis greater than or equal to 30% of the lowest bid, are rated 0. Between 2, the evaluation is linear and takes into account the centuries. C2 Quality, plausibility of the work program in relation to the course of work [30%] Evidence for this criterion: - Technical report; - General and Retail Programs. Elements of judgment: - Plausibility: concordancethe program of work and resources and means; - Identification and optimization of resources and resources; - Method of work and coordination of teams; - Proposed measures to reduce traffic divergence; - Adequacy of work to ensure optimum quality; - Respect of deadlines; - Content, structures and level of detail of the work program (informations on all the essential phases of the construction site); - Detailed procedures for implementation and quality management, including detailed planning of night operations for the main activities (milling, SAMI installation, etc.) with indication of the self-control procedures, control of the suppliers, and procedures of the company's laboratory; - Quality and clarity of documents. C3 Means to ensure the quality of the structure [20%] Evidence for this criterion: - Technical report; - Site installation plan; - Supply of the site; - Organizational Chart; - Analysis of the risks inherent in the project; - CV of the key people. Elements of judgment: Technical report: - Relevance of the execution procedures; - Description of organization, truck access forprovision of the site, demonstration of the taking into account of the conditions of access and slope; - Adequacy of machinery and inventory used for the construction of the structure; - Rationalization of means and methods (in particular description of waste disposal lines) for the protection of the environment. Site installation plan: - Exhausting of installationsions; - Optimization of site installations according to the phases of the works. Organizational chart: - Relevance and adequacy of the organization; - Relevance of information flow and decision flow. Risk analysis: - Relevance of the risks specific to the implementation of the project; - Adequacy of measures proposed to eliminate or reduce risks and definition of those responsible. Key personnel: Work supervisor and foreman as provided in the tenderer's organization chart: - Basic and continuing training in relation to the areas covered by the project; - Experience: number of years of experience in the fields concerned by the project, adequacy of references projects in relation to the market, functions performed in reference projects. To-all the evidence: - Quality and clarity of the documents Assessment of the criteria for award other than the criterion of price (C1): the evaluation is always indicated by the notes 0 to 5: 0 = Evaluation impossible; no information 1 = Critere ... Internet address (URL): https://www.simap.ch Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Construction work was 20 Nov 2017. Bidding is closed.
This tender has been issued by OFFICE FÉDÉRAL DES ROUTES — INFRASTRUCTURE ROUTIÈRE OUEST — FILIALE ESTAVAYER-LE-LAC in Switzerland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45233210 - Surface work for highways.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 17378985. The purchaser document reference is 408667-2017.
This tender falls under Construction and Real Estate in Switzerland. Suppliers in these sectors can track similar Switzerland tenders using CPV-based alerts.