ВОДОСНАБДЯВАНЕ И КАНАЛИЗАЦИЯ ООД ГР. СИЛИСТРА has floated a tender for Contract notice: Construction-site supervision services. The project location is Bulgaria and the tender is closing on 01 Apr 2020. The tender notice number is 100338-2020, while the TOT Ref Number is 41082277. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Bulgaria

Summary : Contract notice: Construction-site supervision services

Deadline : 01 Apr 2020

Other Information

Notice Type : Tender

TOT Ref.No.: 41082277

Document Ref. No. : 100338-2020

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : ВОДОСНАБДЯВАНЕ И КАНАЛИЗАЦИЯ ООД ГР. СИЛИСТРА
Office Name: Водоснабдяване и канализация ООД гр. Силистра
Address: ул. Баба Тонка 19
Town: Silistra
Postal Code: 7500
Contact Point: Пл. Ганчева - организатор ЗОП, Кр. Коев - юрисконсулт

Phone: +359 86820559
Fax: +359 86820558
Bulgaria
Email :vikss@vik-silistra.com
URL :http://vik-silistra.com/

Tender Details

Object of the contract
Construction-site supervision services

Description: Contract notice: Construction-site supervision services

Authority Type: Utilities entity
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 71521000, 71520000, 71521000, 71521000, 71520000
CPV Description: Construction-site supervision services.

Construction supervision services.

EXERCISE OF HCH AND performing functions of engineers in FIDIC for objects connected to an external water supply and water mains town. TUTRAKAN

EXERCISE OF HCH AND performing functions of engineers in FIDIC FOR PROJECTS RELATED TO EXTERNAL WATER SUPPLIES AND WATER SUPPLY NETWORK, TUTRACAN, as a service provider, Contractort will act as:

Main Site: Gr. Silistra, Tutrakan, Silistra district, incl. in "Water Supply and Sewerage" Ltd. - Silistra, as well as in accordance with the needs arising in the process of realization, offices of the Contractor

EXPLOITATION of NSN and FUNCTIONING OF FUNCTIONS OF ENGINEERING INSTITUTES, as in execution of the service, ExecThe engineer will act as:

1.Engineer within the meaning of Clause 3 of the CONTRACTUAL CONDITIONS FOR TECHNOLOGICAL EQUIPMENT AND DESIGN OF CONSTRUCTION FOR ELECTRICAL AND MECHANICAL INSTALLATION WORKS AND CONSTRUCTION ENGINEERING Terms of Service - International Federation of Consulting Engineers (FIDIC), as applicable, according to the type of contract subject to the service, and the relevant Specificterms and conditions;

2.Technical design control in design and construction contracts (engineering), preparation of opinions and reports for conformity assessment of the technical projects for the sites described in the Terms of Reference

3.Assessment of conformity in part part Energy efficiency within the meaning of Art. 142, para. 10 and para. 11 of the SPA, where applicable;adzor within the meaning of Art. 168 of the Law on Spatial Planning / ZUT/ ;

5.Coordinator "safety and health" for the stage of investment design and for the stage of construction; for the following contracts with the contractual terms of FIDIC:

1. "Reconstruction of the water supply network in . Tutrakan "

The reconstruction of the water supply network of Tutrakan with a length of 2, 824 km with diameter from Ф90 to Ф355mm is planned., as well as reconstruction and construction of 190 pcs. SVO, construction of 1 pc. water meters and 3 pcs. mines of the PRV. The material intended for construction is PEHD PN 10.

2. SILISTRA "

- Reconstruction of supply and supply pipelines to Silistra power station with total length of 8, 044 km,

- Replacement of pumping units BPS" Raney 1,

- Modernization of pipe systemstopics and electrical equipment and auxiliary buildings of Raney1 class,

- Reconstruction and replacement of HP piping systems Low area 3000m3,

- Reconstruction and replacement of HP piping systems High area 400 m3

- Replacement of pump units PS Silistra II lift,

- Rehabilitation and reconstruction of VK Kalipetrovo (construction part),

- Reconstruction and modernization of chlorination installations at Raney 4, Kl.. Raney 6 and PS II lift Silistra,

- Construction of a chlorine installation at Raney 8,

- Reconstruction and replacement of the Kalipetrovo pipeline systems,

- Replacement of Baney Raney 4 and Raney 5 BPS

3. "RECONSTRUCTION OF EXTERNAL WATER SUPPLY TO TUTRAKAN".

- Reconstruction of supply and supply water pipelines to the Tutrakan agglomeration with a total length of 9, 337 km

- Replacement ofpump units at Raney Class 1, Raney Class 2, Raney Class 3 and Substation II 2nd Tutrakan lift,

- Modernization of pipe systems and electrical equipment and auxiliary buildings of Raney Classes 1, 2 and 3,

- Reconstruction and modernization of a chlorine installation at PS II-rd rise Tutrakan,

- Delivery and installation of a diesel generator with automatic switching on of reserve (AVR) for power supply of Raney 1, 2 and 3

I tr classs of the engineering contract will be executed in accordance with the contractual terms for the technological equipment and the design of the electrical and mechanical systems, and the in the draft contract - part of the standardized public procurement documentsconstruction supervision points and functions of FIDIC Engineer under contract (s) with FIDIC contractual terms for construction of water supply and sewage infrastructure. Art. 166, para. 1, item 1 of the SPA, and for foreign persons - in similar registers or to be a member of a certain organizationaccording to the law of the Member State in which they are established.

Note: In the case of participation of a non-legal entity, compliance with the requirement is demonstrated by those members of the association who, according to the distribution of the persons` participation in the activities provided for in the merger agreement they are committed to the implementation of the activities of the AssociationCompleting the assessment of the conformity of the investment project and / or construction supervision.

Where the tenderer provides for the participation of subcontractors, the requirement shall be proved for those subcontractors who, in accordance with the type and share of the contract assigned to them, will carry out construction supervision / conformity assessment of the investment.

When submitting a bid, the participants declare compliance with thisand selection criterion only by completing the relevant section in the Single European Public Procurement Document (OEDOP) - section A "Eligibility" of OEDOP. under Article 166, Paragraph 1, Item 1 of the Territorial Audit Act or Certificate of the Right to Exercise the Activities under Article 166, Paragraph 1, Item 1 of the Territorial Territory of Personsand under Art. 166, para. 7 of the SPA, accompanied by the list of competent natural persons, which is an integral part of it - (certified copy).

When the participant is a foreign person, he / she should submit a copy of a document certifying the right to carry out such activity, issued by a competent authority of a country - a Member State of the European Union or another State Party to the Europe Agreementwhich economic space according to Art. 166 of the SPA, or submit a declaration or a certificate of existence of such registration by the competent authorities in accordance with the relevant national law. Where the performance of the relevant service (construction supervision), under the law of the country in which the participant is established, requires special authorization or membership of a designated authorityation, the contracting authority requires him to prove the existence of such a permit or membership. 67, para. 5 and Art. 112 PPL. The requirement applies to any participant, member of a consortium or subcontractor, in case the specific personsconformity assessment activities and construction supervision, according to the distribution of persons` participation in the procurement activities provided for in the merger / consortium agreement or the intended participation of a subcontractor.

For the last three financial years ( 2017, 2018, and 2019) the participant has a minimum volumeturnover in the area covered by the contract, calculated on the basis of annual turnover.

... continued Section III.1.3

The certificates must be issued by independent persons accredited by the relevant series of European standards by the Bulgarian Agency Executive Agency for accreditation "or by any other national accreditation body that is a party to the Multilateral Mutual Agreementknowledge of the European Accreditation Organization, the relevant field or to meet the requirements for recognition in accordance with Art. 5a, para. 2 of the Law on National Accreditation of Conformity Assessment Bodies.

3. The tenderer should have management personnel who will be responsible for the execution of the contract with certain professional competence for this, as a minimum.o follows:

Short-term key experts (required key experts for conformity assessment according to the nature of the contract)

Plumbing engineer

Engineer part Constructive

Engineer part Road & Water

Engineer part Electro

Architect

Surveyor

Expert - Fire Safety;

Expert - draft accounting documents

Long-term key experts

Supervisory Team Leader (Resident Engineer)

Deputy CutDent Engineer 1 (for object: "Reconstruction of the water supply network in Tutrakan")

Deputy Resident Engineer 2 (for "Reconstruction of external water supply pipelines to the Silistra agglomeration")

Deputy Resident Engineer 3 (for object "Reconstruction of external water supply pipelines to the city of Tutrakan ")

Plumbing engineer

Safety and health coordinator

Material quality and compliance engineer

Ingenergy part Electro

Surveyor

Engineer part Constructive

Engineer part Road and water supply

Engineer geologist

Engineer - project-accounting documentation

Engineer - Waste management

Minimum requirements for the members of the Management staff for realized general and specific professional experience:

Supervisor supervisor Team (Resident Engineer):

a) Education and Qualification: Higher educationthe National Department of Architecture, Construction and Geodesy or other specialty in the professional field in the field of Technical Sciences according to the Classifier of Areas of Higher Education and Professional Areas, approved by Decree No 125 / 24.06.2002. or equivalent specialty in the above fields, when acquired abroad, in an equivalent professional direction.Professional experience: Minimum of 10 years of professional experience relevant to the qualification. Specific professional experience: Minimum 5 years. experience in construction supervision and / or supervision, of which at least 2d. experience in the position of manager or deputy team leader.

c) Participation in the construction supervision team of at least 2 completed infrastructure sites.

Deputy Resident Engineer 1 (for object: "Water Supply Reconstructionnetwork in Tutrakan ")

Deputy Resident Engineer 2 (for" Reconstruction of external supply pipelines to the Silistra agglomeration ")

Deputy Resident Engineer 3 (for the project" Reconstruction of external supply pipelines to Tutrakan ")

a) Education and qualification: completed higher education in the specialty of Architecture, Construction and Geodesy according to the Classificationfertilizer in the fields of higher education and professional fields, approved by Decree No 125 / 24.06.2002. or equivalent specialty from the specified field, when acquired abroad, in an equivalent professional direction.

b). Total professional experience: Minimum of 10 years of relevant professional experience. Specific professional experience: Minimum 5 years construction supervision experience.

C) TimeIn view of the limited number of characters in the notice template, the requirements for the professional competence and experience of other management personnel are set out in Part III, Section II, letter B of the documentation and the full terms and conditions. for this procurement are provided in the documentation available on the buyer`s profile.


Internet address (URL): http://vik-silistra.com/

Documents

 Tender Notice