Contract notice: Construction project management Tender - 36968518
Tender notice from Poland, published on 09 Oct 2019.
Executive Summary
The DYREKTOR URZ?DU MORSKIEGO W GDYNI has issued a Tender notice for the procurement of a Contract notice: Construction project management services in the Poland. This Tender notice was published on 09 Oct 2019 and is scheduled to close on 22 Oct 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 36968518, while the tender notice number is 471818-2019 and Register on the platform.
Key facts
Summary
Contract notice: Construction project management services
Object of the contract Construction project management services Description: Contract notice: Construction project management services Authority Type: Ministry or any other national or federal authority Contact Nature: Services Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 71541000, 71541000, 71520000, 71248000, 71247000, 71244000, 71311000, 71311100, 71317000, 71320000, 71541000, 71520000, 71248000, 71247000, 71244000, 71311000, 71311100, 71317000, 71320000 CPV Description: Construction project management services. Construction supervision services. Supervision of project and documentation. Supervision of building work. Calculation of costs, monitoring of costs. Civil engineering consultancy services. Civil engineering support services. Hazard protection and control consultancy services. Engineering design services. Pełnienie funkcji inżyniera kontraktu w ramach projthe file "Construction of a waterway connecting the Vistula Lagoon with the Gulf of Gdańsk, part I" Reference Number: ZP.371.46.2019.ASz 1. The subject of the contract is a service consisting in performing the function of a contract engineer within the meaning of the FIDIC contract conditions for the implementation of the project called "Construction waterway connecting the Vistula Lagoon with the Bay of Gdańsk ". 1. The subject of the order is a service consisting of nand performing the function of a contract engineer within the meaning of the FIDIC contract conditions for the purposes of implementing the project entitled "Construction of a waterway connecting the Vistula Lagoon with the Gulf of Gdańsk" 2. The purpose of this contract is to establish comprehensive, professional and effective supervision over the implementation of construction works (hereinafter referred to as the "Investment") under the project entitled "Construction of a waterway connecting Zalin Wiślany with the Gulf of Gdańsk, part 1 " 3. The scope of the contract includes the performance of the service consisting of: 1) performing the function of an engineer within the meaning of the FIDIC contractual conditions referred to in the remainder of this chapter; 2) performing the function of a supervision inspector, in accordance with with Polish construction law and executive acts, effective and active supervision of Investments and adminscontract management; 3) performing design works at the request of the Employer, under the conditions specified in the contract; - for the Investment implemented under the project entitled "Construction of a waterway connecting the Vistula Lagoon with the Gulf of Gdańsk." 4. It is the duty of the engineer to comprehensively carry out the tasks assigned to the engineer at the Terms of Reference, including in particular the contract, the model of whichAnnex 5 to the ToR (including in the annexes to the contract) and in the description of the subject of the contract constituting Annex 4 to the ToR, and resulting from applicable law, in particular from the Act of 7.7.1994 Construction Law (i.e. Of Laws of 2019, item 1186, as amended). 5. The detailed scope of the contract engineer's obligations is included in the description of the subject of the contract constituting the attachmentNo. 4 to the ToR. Design documentation for the Investment, together with decisions and arrangements is available on the platform at: https://portal.smartpzp.pl/umgdy.gov.pl/public/postepowaniepostepowanie=469565 in the "Documentation of proceedings" tab and on the Office's website Maritime in Gdynia at: https://www.umgdy.gov.pl in the "Shipping Channel" tab. 6. Start of implementationand Investment is planned for the fourth quarter of 2019 7. Construction works supervised by an engineer will be carried out in accordance with the FIDIC contract conditions: "Contract conditions for construction for engineering and construction works designed by the Employer (FIDIC 1999, 4th edition 2008)" (the Polish text applies), amended by the content of special conditions ( hereinafter referred to as "Conditioncontractual terms "FIDIC"), as amended by the content of the special conditions supplemented with all other documents specifying the Investment and the conditions for its implementation in accordance with the provisions of Polish law. Subcontractors 8. The Contractor intends to entrust subcontractors with the followingdishes given by the Contractor to subcontractors. 9. The Purchaser does not allow submission of variants. 10. The awarding entity envisages the possibility of awarding the orders referred to in art. 67 section 1 item 6 of the Public Procurement Law, i.e. involving the repetition of similar services to the scope of the contract. Orders in the above scope may be awarded if there is a justified need to extend ordersand the basic one, in particular in the event of extension of the investment implementation deadline. The amount of remuneration in the above scope will be determined on the same principles as the order covered by this procedure, based on the prices specified in the Contractor's offer. 11. The Employer requires employment by the Contractor or Subcontractor based on the employment contract of the persons referred to in -2 paragraph 1of the agreement, constituting Annex 5 to the ToR. The detailed requirements regarding the employment of persons by the Contractor or Subcontractor are specified in the provisions of the contract. 1. The Contractor is excluded from the contract award procedure in relation to which any of the conditions referred to in art. 24 paragraph 1 point 12-23 of the Public Procurement Law and referred to in art. 24 paragraph 5 points 1, 2, 3, 4 and 8 of the ActThe PPA. 2. Contractor, which is subject to exclusion on the basis of art. 24 paragraph 1 point 13, 14 and 16 20 and pursuant to Article 24 para. 5 points 1, 2, 3, 4 and 8 of the Public Procurement Law, may provide evidence that the measures taken by him are sufficient to prove its reliability, in particular to prove the repair of damage caused by a crime or a fiscal offense, financial compensation for the sufferedą harm or redress, comprehensive explanation of the facts and cooperation with law enforcement authorities and taking specific technical, organizational and personnel measures that are appropriate to prevent further offenses or fiscal offenses or incorrect conduct of the Contractor (Not applicable if towards the Contractor who is a collective entity, ruled pby a final judgment of the court, the prohibition to apply for the contract and the period of validity of the prohibition specified in that judgment has not expired). 3. Each Contractor must attach to the offer a valid statement as at the date of submission of the offer in the form of a single European order document, hereinafter referred to as the single document (hereinafter: "EAT", "single document") prepared in accordance with the standard modelform specified in the European Commission implementing regulation issued on the basis of art. 59 clause 2 of Directive 2014/24 / EU. The information contained in the single document constitutes preliminary confirmation that the Contractor is not subject to exclusion and meets the conditions for participation in the procedure. Appropriate (evidentiary) verification of compliance with the conditions of participation in the procedure specified by the Employeru will be made on the basis of relevant documents submitted by the Contractor, whose tender will be assessed the highest, at the request of the Employer (Article 26 (1) of the Public Procurement Law). 4. A single document prepared initially by the Employer for the said procedure is available on the platform at: https://portal.smartpzp.pl/umgdy.gov.pl. 5. The contractor may limit himself to being completedand section IV of the EAT form. Thus, the Contractor does not have to complete any of the other sections of Part IV of the form regarding qualification criteria, and the proper (evidentiary) verification of compliance with specific conditions specified by the Employer for participation in the procedure, the Employer will, as a rule, at the end of the procedure, based on the relevant documents submitted by Executethe tender whose offer was highest rated at the request of the Employer (Article 26 (1) of the Public Procurement Law). 6. The Contractor within 3 days of posting on the platform the information referred to in art. 86 section 5 of the Public Procurement Law, will provide the Ordering Party, via the platform, a declaration of belonging or not belonging to the same capital group as referred to in art. 24 paragraph 1 point 23of the Public Procurement Law the Contractor will meet the condition if he demonstrates that he is insured against civil liability, in the scope of conducted business activity related to the subject of the contract, for a guarantee sum of not less than PLN 5, 000, 000 (in words: five million). 1. The Awarding Entity, before awarding the contract, will call the Contractor whose tender has been rated the highest to be submitted in the designated areanot less than 10 days, valid as at the date of submission of the following statements or documents, to confirm the absence of grounds for exclusion from the proceedings: 1) information from the National Criminal Record in the scope specified in art. 24 paragraph 1 item 13, 14 and 21 of the Public Procurement Law, issued not earlier than 6 months before the deadline for submitting bids; 2) an excerpt from the relevant register or pricespermanent records and information on business activities, if separate provisions require an entry in the register or the register, in order to confirm the absence of grounds for exclusion pursuant to art. 24 paragraph 5 point 1 of the Pzp Act; 3) a certificate from the competent head of the tax office (Article 24 paragraph 5 point 8 of the Pzp Act) confirming that the Contractor is not in arrears with tax payments, issued not earlyj than 3 months before the deadline for submitting bids or requests to participate in the proceedings, or other document confirming that the Contractor has entered into an agreement with the competent tax authority regarding the repayment of these receivables along with any interest or fines, in particular, he obtained the exemption provided for by law, deferment or installment of overdue paymentsor withholding in full the implementation of the decision of the competent authority; 4) a certificate of the competent organizational unit of the Social Insurance Institution or Agricultural Social Insurance Fund or other document confirming (Article 24 (5) (8) of the Public Procurement Law) that the Contractor is not in arrears with payment of contributions for social security or health insurance, issued no earlier than 3 mibefore the deadline for submitting bids or requests to participate, or another document confirming that the Contractor has entered into an agreement with the competent authority regarding the repayment of these receivables together with any interest or fines, in particular, he obtained the exemption, deferral or distribution provided for by law. installments of late payments or withholding in cacompliance with the decision of the competent authority; 5) the Contractor's statement that he has not issued a final court judgment against him or a final administrative decision on late payment of taxes, fees or social security or health insurance contributions, or in the event of such judgment or decision of documents confirming payment of these receivables together with any fromhundreds or fines or concluding a binding agreement on the repayment of these receivables (Annex 9 to the ToR); 6) the Contractor's statement of the lack of a decision against him as a preventive measure prohibiting him from applying for public contracts (Annex 10 to the ToR); 7) the Contractor's declaration of non-payment of local taxes and fees, as referred to in the Act of 12.1.1991. on local taxes and fees (Journal of Laws of 2016, item 716) (Annex 11 to the ToR). Note: If the contractor has its registered office or place of residence outside the territory of the Republic of Poland, instead of the documents referred to above, documents referred to in chapter VI point 9 of the ToR. Internet address (URL): www.umgdy.gov.pl
The bid deadline for Contract notice: Construction project management services was 22 Oct 2019. Bidding is closed.
This tender has been issued by DYREKTOR URZ?DU MORSKIEGO W GDYNI in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 71541000 - Construction project management services, 71520000 - Construction supervision services, 71248000 - Supervision of project and documentation, 71247000 - Supervision of building work, 71244000 - Calculation of costs, monitoring of costs, 71311000 - Civil engineering consultancy services, 71311100 - Civil engineering support services, 71317000 - Hazard protection and control consultancy services, 71320000 - Engineering design services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 36968518. The purchaser document reference is 471818-2019.