Contract notice: Construction materials Tender in Hungary - 33817509
Tender notice from Hungary, published on 13 Jun 2019.
Exeutive Summary
The BUDAPESTI KÖZLEKEDÉSI ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG has issued a Tender notice for the procurement of a Contract notice: Construction materials and associated items in the Hungary. This Tender notice was published on 13 Jun 2019 and is scheduled to close on 15 Jul 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 33817509, while the tender notice number is 275926-2019 and Register on the platform.
Key facts
Summary
Contract notice: Construction materials and associated items
Object of the contract Construction materials and associated items Description: Contract notice: Construction materials and associated items Authority Type: Utilities entity Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 44100000, 44111700, 44111900, 44100000, 44111700, 44111900, 44111000, 44111510, 44111800, 44114200, 44921100, 44111100, 44191300 CPV Description: Building materials. Ceramic flags. Building materials. Insulators. Mortar (construction). Concrete products. Gypsum Bricks Particle board. Reference number: EKR000684592019 Adasveteli frame contractor (s) Purchase of epoxy materials for 48 months, planned 71346 units / 12 months Main Site: BKV Zrt.The sites of the kerezzeszzes documents are kerueled. Purchase of Burkolo materials in the framework of a framework contract. - according to documents -You can also order targyat fingers for a maximum of 10% of the size of the frame specified in the contract. These cans can be ordered on the basis of the modularity of the authors. (X.30.) KArticle 46 para. (3) of the Ordany decree, reference to any specific product, origin, type, item, item, action, person, patent, or ticket, which may occur in the technical code of the Kezzeszerzes, refers only to the unique, co-operative terms of the Kezekereszgygygy, Ajanlatteve- timeit should be a sub-lesson in the same way: - the time of the ruler, which may not be less than the 12th anniversary of the accusation - that he knows that the newsletter is in an e-mail to the orders, which in his forests: receive orders from a single e-mail address - if the newsletter is at least the electronic mail orderzer al-kueldoed with the receipt of a receipt confirmation - the electronic order to the e-mail address specified by the customer can be verified, the order is considered to be delivered to the customer, (www.bkv.hu/iso iranyitasi systems iso) - the magazineHe got acquainted with the arithmetic of the Iranian-based system, the energy engineer, and the cross-section of the Iranian system, and with his colleagues in the authors' work and his colleagues in the forest department, he also told other people about it. energy efficient work, a - the statement can be completed in the form of a template printed in the reset-fetching documentation of the collec- tion documents. The eljarasbit should not be a timekeeper (koezoes scheduler); Article 62 (1) (2) states the reasons for exclusion, subject to Kbt. Section 62 (3) and (5) of the Act on Public Procurement, and Kbt. Article 63 (3). Pursuant to Article 74 (1), the timeliness prevents it from being updatedhe or she is a subcontractor or an appropriately proof-reading organization who is a) a Kbt. according to the above-mentioned exclusions, the power belongs to; Article 62 Excluded Excluded in the First Step Accredited Certificate Mod: Preliminary Proof Module (in Present): - For Accountser (koezoes timer) in 321/2015. (X.30) Article 1 (1) of the Government Decreein mind, the unified european coexistence document (hereinafter referred to as EEKD) must prove in advance that Kbt does not belong. The power of the exclusions referred to in - 62 para. (X. 30.) on the basis of Article 4 (1) of the Govt. Article 62 (1) (2)(cf. Article 4 (3) (4) and Article 6 (1) (2) of Government Decree 321/2015 (X. 30.)). / 2015th (X. 30.) in Section 15 para. (2) of the Government Decree regarding sub-subcontractors who do not take the correct reader's account in the Kbt. Shall submit a declaration pursuant to Section 67 (4). The statement is ok - In case of Koezoes, in the case of the Koezoes journalists, the statement will be made by the host operator who has introduced the report. : - A 321/2015. (X. 30.) Government Decree 8 and 10 shall be updatedor the timekeeper will verify that the timer does not belong to Kbt. Section 62 (1) (2) of the Act (Article 321/2015. (X. 30.) Government Decree 14 and 16). Section 62 (1) (k) (kc) (kc) in the case of a foreigner established in Hungary is excluded. (X. 30.) Government Decree Article 8 (i) (ib) / ic)under subheading 321/2015. (X. 30.) Government Decree 10 (g) (gb) / gc). The Kbt. For the purposes of subsection (1) (k) (k) (kc) of Section 62 (1), the declaration may be completed in the form of the relevant EDF form and in the form of an entry, - A 321/2015. (X. 30.) Government Decree (15) (1) of the article, the timer is aIn the case of a subcontractor or organization that retains a proper certificate, the KDB will only be inserted into the KDB. The grounds for exclusion in Section 62 para. (1) (2) are not valid in forests, - A 321/2015. (X.30.) Article 1 para. (7) of the Govt.alma valos, - Kbt. According to the provisions of Section 64, you may have the right to Oenthist, - Kbt brings attention to attention. Article 69 (11a). Preliminary Proof Module (in the timeline) - for all issues: P1: For the subscriber in 321/2015. (X. 30.) Government Decree Article 1 (1) bekezdese in its artefact with the introduction of EEKD, the proper conditions must be fulfilled by verbal information to prove that it complies with the appropriate tactical requirements determined by the news. It is only for the respondent to declare that he / she complies with the relevant requirements of the Act IV. Resonance with α (alpha) points is elicited. They are the right weaver If the breeder meets the capacity of a suitable body or person with appropriate skills, he / she also introduces EECDs related to the organizations or individuals that have been identified. In such a case, the organizations or individuals who have the capacity to dispose of them will only declare the relevant terms and conditions, Koezoes, in the case of the Koezoes newsletter, the statement will be made by the host operator who introduced the report. 2015 (X.30.) Government Decree Article 19 (1) (c)you must attach a complete statement of the previous 3 rows of rounds of traffic, which have been completed, and a statement of the date when you started to act, or when these data are available. 321/2015. (X.30.) In the case of Article 19 (3) of the Government Decree; If the subscriber does not have a lock with a locked turn, because he started an artisan after the beginning of the period, he has to make a statement of the arbitrator who has been eliminated during the art works before the expeditious task. The retention force reserves the right to submit the submitted documents check the authenticity and sincerity with whichFor that purpose, the search engine needs to provide all the ideas for it. A 321/2015. (X.30.), Article 1 (7) of the Government Decree, may also be inserted before the expeditionary task, as long as the tens, data content is true. (X.30.), Article 1 (8) of the Govt.a statement or certificate that has been put to the attention of some of the parties. In this case, the subscriber must declare in return which of the trades he is looking for or take into account the realities of the biralat. Section 65 para. (7) is based on the capacities of the appropriate organizations or individuals in the organization.asara tamaszamas can meet, koezoettuek liallo relationship from legal to fueggetlenuel. In this case, you must report this organization in the newsletter, and the relevant points of interest in the case of the relevant search engineer or candidate who is certified in the forests by the resources of this organization or is tantamount to it.. Section 65 para. (8) is based on the organization whose data is used by the subscriber for the eligible property of the farmer and penzuegyi, the Civil Code. 6: 419th According to - -, the timekeeper is responsible for the timeliness of the subscriber fulfilling his or her fault performance or fault performance. The schedule must include the agent of the newsletter fileto give the organization the opportunity to take part in the presentation of the e-declarations in the EDF. Article 69 (11a). 1. Up-to-date information makes e-mails available in the EDF in full scale. Expected to be in the foreground III.1.2 es III.1.3. as described in pointgi has specified and certified the records of the qualified journalists in a string of strict terms. Expected to be in Kbt.81 (4) and (5). applies. 4th The submitter must expressly declare in an appropriate form the EDF form in accordance with section Kbt.66 (2). foglaltakrol. 5th The person presenting the report must expressly declare in -6 (6) of the Kbt. foglaltakrol. 6th You read the scheduleit should include an apot, for which an electronic form will be posted in the EDF 7. The submitter should declare on the correct form of the relevant EDF form whether the entry is in progress. In the event of a pending entry in the event of a change, see 321/2015. (X.30.) To be disrupted according to - 13 of Kr. 8. In the case of Koezoes, see section Kbt.35 (2a). base on your schedulemust be attached to Article Kbt.35 (2). 9. The report must be prepared in Hungarian if all the documents, certificates and declarations attached to the newsletter are not written in Hungarian in the Hungarian language, it must be included in the ututata and the Kbt.47 (2). 10. His attention comes to his attentiont in Kbt.69 (7). laid out. 11th According to Kbt. 12. Expected to be in Kbt.131 (4). be based only on the winner of the event, or - in case of winning the winner - the chief of the newsletter will be in line with the most up-to-date scheduler - ifthe news was published by the journalists in a booklet - the author says. Iranyado Law: The Kbt. and, your orders, ptk 14. Predictive Force in Section Kbt.75 (2). does not apply (e). Kbt. Section 75 (2). the inferior cause in sub-paragraph g) 15. The winning schedule or the winners were impressed by the success of the contractapjan roegzitesre keruel is the frame-of-view, which is defined by keruel as follows: Keretoesszeg = The time of the oestar (how much elteres es opcio nelkuel) / 12 * author's time (home). If the person of the winner is the same, the winner is the same. in this case, with the winner of the given quiz, a piece of authorship keruel, where the wreaths areAccording to the authors, keruel roegzites for the following: Keretoesszeg = the essence of the present-day oak trees (how many elteres es opcio nelkuel) / 12 * author's time (home). Reason for 90% (fixed oesszeg) of Keretoesszeg with the order. 16th Predictive force indicates that the authors who are collecting megcasses are all up-to-date, with 90 days notice, justificationnelkuel can be terminated as stipulated in the draft treaty. Foreword brings attention to Kbt.131 (4) and (9). laid out. 18th Kbt.41 / A is the focus of attention. 19. If more than the same time is the same as the title of the essay, the story is the most favorable one, which is the lowest of the time. Referred to in point IV.2.6made within 1 calendar day of 30 calendar days . The application of -4b Kbt.44 is a prerequisite positioning of the document containing the business secret in the EDF system. The momentum brings attention to the fact that communication is in the process of communication - Kbt.41 / C- (1). apart from the specified excavations - exclusively on the EDF cross-border. 23. somethingthe time in six orphans is set to local time. Due to the character attributes of the advertisment label, further reports related to the preparation of the newsletter are included in the Kezzeszerzesi utmutato 25. FAKSZ: dr. Katalin Varhelyi (00438) Internet address (URL): http://www.bkv.hu
The bid deadline for Contract notice: Construction materials and associated items was 15 Jul 2019. Bidding is closed.
This tender has been issued by BUDAPESTI KÖZLEKEDÉSI ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 44100000 - Construction materials and associated items, 44111700 - Tiles, 44111900 - Ceramic flags, 44111000 - Building materials, 44111510 - Insulators, 44111800 - Mortar (construction), 44114200 - Concrete products, 44921100 - Gypsum, 44111100 - Bricks, 44191300 - Particle board.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 33817509. The purchaser document reference is 275926-2019.