Expired Tender Romania ICB TOT Ref. 30646646

Contract notice: Composting plant construction Tender - 30646646

Tender notice from Romania, published on 13 Feb 2019.

Executive Summary

The COMPANIA DE AP? „ARIE?” S.A. has issued a Tender notice for the procurement of a Contract notice: Composting plant construction work in the Romania. This Tender notice was published on 13 Feb 2019 and is scheduled to close on 25 Mar 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 30646646, while the tender notice number is 070517-2019 and Register on the platform.

Key facts

Summary
Contract notice: Composting plant construction work
TOT Ref. No.
30646646
Document Ref. No.
070517-2019
Country
Romania
Notice type
Tender
Competition
ICB
Publication date
13 Feb 2019
Bid deadline
25 Mar 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Composting plant construction work
Description: Contract notice: Composting plant construction work
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45253800, 45232422, 71322000, 45253800, 45232422, 71322000
CPV Description: "Sludge Composting Plant at Campia Turzii Treatment Station" (CL3), within the "Regional Infrastructure Development Project water and waste water from [...] details on www.e-licitatie.ro
Reference Number: 20330054_2018_PAAPD1030700
Mininga project for the design and execution of modernization works for the sludge line at the Campia Turzii Wastewater Treatment Plant, respectively a sludge composting plant with a capacity of 3760 t / year, mud [35% su] equivalent to about 10.30 tons / day, operable 24 h / day [biology treatment, no manipulation], 350 days / year [biology treatment, no manipulation]:
Main Site: Cluj County
for the design and execution of the mud line upgrading works at the Campia Turzii Wastewater Treatment Plant, respectively a sludge composting plant with a capacity of 3760 t / year, mud [35% su] equivalent to 10, 30 tons / day, operable 24 h / day [biology treatment, no manipulation], 350 days / year [biology treatment, no manipulation]:
a) Design activities refer to the projecttechnically detailed for the mud line upgrading installation. The project will include, among other things, all necessary documents (such as memos, drawings, calculations, etc.) for the elaboration of the Technical Project in accordance with the national legislation and any documentation necessary for obtaining the construction permits.(c) Construction works (d) Supply and installation of technological equipment and equipment (e) Testing and commissioning (f) Remedy of any defects occurring in the 36-month Defects Notification Period (g) Training of Employee staff or the Operator
Requirement no. 1.
Bidders, associates, supporters and subcontractors should notis to be found in the situations provided by art.177, art.178 and art.180 of Law 99/2016 regarding the sector acquisitions.
The manner by which the fulfillment of the requirements can be demonstrated: The DUAE will be completed by all the operators participating in the procedure, with the information related to their situation. The supporting documents demonstrating the fulfillment of the assumed tasks by completing the DUAE follow ato be submitted, at the request of the contracting entity, only by the first ranked bidder.
These documents are:
O The judicial record of the economic operator and of the members of the management, management or supervisory body of that economic operator, power of representation, decision-making or control within it, as evidenced by the Consissued by the ONRC / Constitutive Act; • A certified statement of the lack of overdue debts regarding the payment of taxes, duties or contributions to the consolidated general budget at the time of their presentation.
A, as the case may be, documents demonstrating that the economic operator benefit from the derogations provided for in Article 179 (2), art. 180 par. (2), Article 184 din Law 99/2016 on Public Procurement
In case the economic operator (bidder / affiliate / subcontractor / third party) is in one of the situations provided by art. 177, art.178 and art.180 of the Law no. 99/2016 regarding the sector acquisitions, it will be excluded from the award procedure, the tender being rejected. 2- Avoiding Conflict of Interest
Operato(leader / associate / subcontractor / third party) will submit the DUAE form confirming that the economic operator is not in any of the situations provided for in art. 73 of the Law no. 99/2016 on sector acquisitions. The decision-makers of the contracting authority regarding the organization, conduct and completion of the award procedure are presentin the declaration of the head of the contracting authority, part of the public procurement file and are the following:
1. Pop Petre - Member Board of Directors
2. Turc Ioan Marius - Member Board of Directors
3. Serestely Elemer - Member Board of Directors
4. Farcas Traian - Member Board of Directors
5. Pop Vasile Cristian - Member Board of Directors
6. Ditof Mihai Serban - Member of the Board of Directors
7. Parjol Iuliu - Member Board of Directors
8. Blaj Gheorghina - Representative of the General Meeting of Shareholders
9. Ceclan Pavel - Representative of the General Meeting of Shareholders
10. Vlad Luminita Violeta - Representative of the General Meeting of Shareholders
11. Udrea Ana Maria - Representative of the General Meeting of Shareholders
12. Grigoryu Gheorghe Dan - Representative of the General Meeting of Shareholders
13. Stavariu Tudor-Calin - Representative of the General Meeting of Shareholders
14. Chiorean Ileana Ana - Representative of the General Meeting of Shareholders
15. Ploscariu Aurelian Dumitru - Representative of the General Meeting of Shareholders
16. Bolog Sandu Alin - Representative of the General Meeting of Shareholders
17. Bogdan Ionut Bobic Director General
18. Bolog Simona-Sarmiza- Chief Financial Officer
19. Sarb Maria Mihaiela - PIU Chief / Chairman of the Evaluation Committee
20. Demeter Adrian - Legal Advisor / Evaluation Committee Member
21. Sarbu Lidia-Ancuta - Financial Officer-UIP / evaluation committee member
22. Pacurar Horatiu - Contract Coordinator / Evaluation Committee Member
23. Fagadar Adrian-Ioan - Contract Coordinator / membru evaluation commission
24. Asafti Ioan-Corneliu Head of purification station / evaluation committee member
25. Apahidean Cristian Mihail Process Engineer / Evaluation Committee Member
26. Bria Zoltan-Emil Contract Coordinator / Reserve Member Evaluation Committee
In case of ... details on www.e-licitatie.ro
Supporter Territor In case the bidder demonstrates his economic and financial situation invocand and the support given by one or more third parties, then the tenderer has the obligation to prove to the contracting entity that he has taken all the necessary measures to have at any time access to the necessary resources, presenting a commitment from the third party / third parties. With the commitment to support, the bidder has the obligation to submit documents sent to him bythird party / third-party supporters, showing how the third party (s) will / will ensure the fulfillment of their support commitment, documents that will be annexed to that engagement. According to art.198 of Law no.99 / 2016 the economic operator and the third party / third party / supporters will jointly answer for the execution of the contractsector. Each sustaining third party will fill in the appropriate IPAE fields on economic and financial capacity. The supporter shall not be in the situation provided by art. 177, 178 and 180 of Law 99/2016, under the sanction of exclusion from the award procedure. Also, the third party / supporter / supporter must not be in the situation provided by art. 72and 73 of Law no. 99/2016. The supporting third party will be unconditionally in agreement with the bidder for the non-fulfillment of any obligations assumed by the bidder on the basis of the sectoral contract and for which the latter has received the economic and financial support under this undertaking,, definitively and irrevocably, at the appealthe benefit of division and discussion.
Requirement no. 1 Turnover The average annual turnover of the last 3 years (2015, 2016, 2017) must be at least 9, 498, 760.94 Lei
- The bidders have the obligation to carefully analyze the Attribution Documentation and to prepare the offer according to all instructions, forms, contractual provisions and technical specifications contained thereinsta Documentation,
- We mention that for the viewing of the awarding documentation uploaded in SEAP, economic operators must have a necessary program to view the electronically signed files, this program being available free of charge on the websites of the electronic signature providers,
- An economic operator can participate in the procedure only if registered in SEAP,
- Correspondsand all documents submitted by the economic operators will be in Romanian, or accompanied by authorized translation in Romanian,
- The awarding documentation shall be posted in full in the tender notice published on the website www.e-licitatie.ro,
- Requests for clarification of potential bidders will address exclusively to SEAP in the "Questions" section of the procedures- The answers to the clarification requests will be posted in the "Documentation, clarification and decision" section of the announcement of participation published on the website www.e-licitatie.ro, within the legal term,
- The Commission evaluation will submit requests for clarification of submitted offers in SEAP to the "Questions" section. Economic operators will passto answer the clarifications and any documents requested during the evaluation of the offers through the SEAP (Section "Questions"), fully in the section corresponding to the respective request, in the form of one or more separate signed documents / files, signed with the electronic signature, - Recommended for the bidders to inspect the location of the project and the surroundings to evaluate, on their own responsibility, chelating and risk, the necessary data to prepare the offer,
- Potential bidders intending to participate in site visits will notify the contracting authority of this at least 24 hours before the scheduled date. Participants to site visits will provide their means of transportation for the visit,
- In case of(natural or legal persons) of a nationality other than the Roman one, the documents will be transmitted in the language in which they were issued, accompanied by their authorized translation in the Romanian language, - If there are first ranked offers equal scores, refresher will be requested through clarification submitted to the bidder, referral is done through SEAP(on-line procedure), in which case the contract will be awarded to the tenderer whose new financial proposal has the lowest price, - the duration of the contract execution: 730 days (from the date of issuing the order for starting the works) of which 274 design days and 456 days execution, - the defect notification period: 36 months (1095 days respectively from the date of approval of the Reception to End ofOf the Works)
- For participation in the procedure, regarding III.2) Conditions of Participation of the tenderers are DUAE (Single European Procurement Document), completed in accordance with Chapter III. V Section 7 of Law no. 99/2016, the DUAE model for participation in the procedure is attached to this award document,
- For DUAE generation, the bidder will use https://ec.europa.eu/growth/tools-databases/espd/filter.
Internet address (URL): www.caaries.ro

Documents

Tender Notice
Login to view

Similar tenders

Romania Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Composting plant construction work was 25 Mar 2019. Bidding is closed.

This tender has been issued by COMPANIA DE AP? „ARIE?” S.A. in Romania.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45253800 - Composting plant construction work, 45232422 - Sludge-treatment works, 71322000 - Engineering design services for the construction of civil engineering works.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 30646646. The purchaser document reference is 070517-2019.

See the Similar Tenders section on this page or browse other tenders from Romania.

This tender falls under Construction and Real Estate in Romania. Suppliers in these sectors can track similar Romania tenders using CPV-based alerts.