Object of the contractCommercial refrigerating equipment
Description: Contract notice: Commercial refrigerating equipment
Authority Type: Other
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 42513290, 42513290
CPV Description: Commercial refrigerating equipment.
Delivery of complete PAG refrigeration unit for cooling aqueous propylene glycol solution from 7C (plus 7C) to 2C (minus 2C) as part of the project "Comprehensive expansion ...
Reference Number: INS / EKS-12/2018
The subject of the order is: Delivery of a complete PAG refrigeration unit for cooling waterborne propylene glycol solutiono from 7C (plus 7C) temperature to 2C (minus 2C) as part of the project "Comprehensive extension of experimental and production plant for extraction of vegetable raw materials" Scope of delivery includes: • Complete refrigeration unit, • Assembly of aggregate and associated equipment, electrical and control cabinets and making connections to technological circuits, • crew training, commissioning of agregatta and inclusion in the technological cycle. The detailed description of the subject of the order is included in Annex No. 1 to the Terms of Reference: Technical Specification No. TP-PR-03 The Contractor undertakes to perform the subject of the order in accordance with the requirements specified in the technical specification, principles of technical knowledge, applicable regulations and standards in accordance with point 9 of Annex No. 1 to SIWZ Specification techNo. TP-PR-03 The minimum required warranty period is 24 months. Main Site: DDP delivery base Puławy, Ordering warehouse by Incoterms 2010.
Delivery of a complete PAG refrigeration unit for cooling water propylene glycol solution from 7C (plus 7C) to temperature 2C (minus 2C) as part of the project "Comprehensive extension of the experimental and production installation for the extractji plant raw materials "Scope of delivery includes:
• Complete refrigeration unit,
• Installation of aggregate and associated equipment, electrical and control cabinets and making connections to technological circuits,
• Training of the crew, commissioning of the aggregate and inclusion in the technological cycle. the subject of the orders is included in Appendix No. 1 to the Terms of Reference: Technical Specification No. TP-PR-03
Together with the offer, the Contractor submits, valid as of the day of submitting bids, a statement constituting preliminary confirmation that the Contractor is not subject to exclusion and that he meets the conditions for participation in the proceedings. The Contractor shall submit the declaration in the form of a single European order document (EED) prepared in accordance with the specimen of the standard form set out in the Ordinance implementing regulationEuropean Union issued on the basis of art. 59 par. 2 of Directive 2014/24 / EU. The uniform European order document (EAT) is drawn up electronically. In order to submit a single European order document, the Contractor may use the form prepared by the Ordering Party, which constitutes Annex No. 3 to the ToR. Instructions for completing the EAT are available on the Office's websiteZamowień Publicznych / Repository of Knowledge / Uniform European Order Document (https://www.uzp.gov.pl/baza-wiedzy/jednolity-europejski-dokument-zamowienia) EAT should be submitted using electronic means of communication, to the address e-mail:
[email protected] (maximum message size 20 MB) in accordance with the rules: b) after creating an electronic documentronic The contractor signs the above mentioned a document with a qualified electronic signature, issued by a qualified trust service provider being an entity providing certification services, an electronic signature that meets the security requirements set out in the Act on trust services and electronic identification (Act of 5/09/2016 on trust services and identification of elektronic OJ from 2016, item 1579) c) The signed electronic document should be encrypted, i.e. with an access password. For this purpose, the Contractor may use the tools offered by the software in which he prepares a statement document (eg Adobe Acrobat), or use the open-source (eg 7-ZIP) or commercial open source tools available on the market, eca is encrypted using 7-ZIP. d) The Contractor shall enter the password of access to the EJF file in the contents of his offer form (or password, if more than one statement of EAT is submitted). The content of the offer form may contain, if necessary, other information, for proper access to the document, e.g. a used encryption program or decryption proceduredata contained in EED. e) The Contractor shall send to the Ordering Party encrypted and signed by a qualified signature of the E-mail to the above-mentioned e-mail address in such a way that the document reaches the Ordering Party before the deadline for submission of bids. f) the contracting authority allows, in particular, the following format of the data sent: .pdf, .doc., .docx., .odt, to confirm compliance withwith the Contractor there are no grounds for exclusion, referred to in art. 25 ust. 1 point 3 of the Act: information from the National Criminal Register in the scope specified in art. 24 sec. 1 point 13, 14 and 21 of the Public Procurement Law, issued not earlier than 6 months before the deadline for submission of tenders; an excerpt from the relevant register or from central records and information on economic activity, if separate regulations are requiredthey are entering an entry in the register or records, in order to confirm the absence of grounds for exclusion under Art. 24 sec. 5 point 1 of the Act, the Contractor's statement that he has not been the subject of a final court judgment or final administrative decision on default of taxes, fees or social security or health insurance premiums or in the event of such a verdict or decisionconfirming payment of these claims together with any interest or fines or a binding agreement on repayment of these debts. declaration of the Contractor about the lack of a ruling against him as a preventive measure of the prohibition to apply for a public order. Contractor's declaration of belonging or non-affiliation to the same capital group ...
Wykothe person fulfills the condition if he / she proves that he / she has information from a bank or cooperative savings and credit union confirming the amount of funds held or the contractor's creditworthiness in the period not earlier than one month before the deadline for submission of tenders for a minimum of PLN 500, 000.00 (in words : five hundred thousand zlotys)
The ordering party requires a deposit in the amount of:--PLN 20, 000.00 (in words: twenty thousand zlotys) The bid bond must be submitted before the deadline for submission of tenders. The bid bond is paid in PLN. The bid bond can be paid in one or several of the following forms: 1) money, to the account of the Ordering Party provided in the ToR, 2) bank guarantees or social-savings credit sureties, but the surety is always a guarantee of money3) bank guarantees, 4) insurance guarantees, 5) sureties granted by entities referred to in art. 6b par. 5 points 2 of the Act of 9.11.2000 on the establishment of the Polish Agency for Enterprise Development (Journal of Laws of 2007 No. 42, item 275). The ordering party will exclude from the participation in the proceedings the Contractor against whom at least one of the conditions specified in art. 24-paragraph. 1 item 12 23 and par. 5 point 1 of the PZP Act, subject to art. 24 sec. 8-10 of the Public Procurement Law ("self-cleaning" procedure) The Employer may exclude the Contractor at any stage of the procedure for awarding the contract.The Contracting Authority, before awarding the contract, will call the contractor whose offer has been rated the most, to submit in the designated, not shorter than 10 days, current dates as at the deposit daydeclarations or documents confirming the circumstances referred to in art. 25 ust. 1 of the Public Procurement Law. the offer should be prepared in accordance with the provisions of point XI of the Terms of Reference. Entities acting jointly bear joint and several liability for non-performance or improper performance of obligations. The Contractor may order the execution of a part of the order subject to subcontractors, subject to indication of the part in the offerthose orders that he intends to entrust to subcontractors. In the case of using a subcontractor, the Contractor: is obliged to indicate in the order form the part of the orders that he intends to entrust to the subcontractors, and the subcontractor by the contractor; is required to complete Part II Section D of the Single European Order Document (EAT); is obliged to submit itEuropean order documents (EIN in the form in accordance with point VIII.6 of the ToR) contractors will provide explanations immediately, but not later than 6 days before the deadline for submission of tenders, provided that the request to clarify the content of the Essential Terms of Orders has been received by The ordering party does not later than by the end of the day in which half of the designated one expirestender offer. If the application for clarification of the content of the Essential Terms of Orders was received after the deadline for submitting the application referred to above, the Employer may provide explanations or leave the application without consideration. The extension of the deadline for submitting offers does not affect the course of the application deadline mentioned above. Persons authorized to communicate with performerscami: Katarzyna Kuszyk
[email protected] fax .: 081 473 17 48 Website address where the announcement on the order is placed as well as the Essential Terms and Conditions of the Order: http://www.ins.pulawy.pl/BIP/ Na the contracting party will also post other information required by public procurement law related to this proceeding
Internet address (URL): www.ins.pulawy.pl
Directive: Classical Directive (2014/24/EU)