Contract notice: Bus-stop shelter construction Tender - 20111233
Tender notice from Poland, published on 29 Jan 2018.
Executive Summary
The GMINA WIELICZKA has issued a Tender notice for the procurement of a Contract notice: Bus-stop shelter construction work in the Poland. This Tender notice was published on 29 Jan 2018 and is scheduled to close on 06 Mar 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 20111233, while the tender notice number is 034112-2018 and Register on the platform.
Key facts
Summary
Contract notice: Bus-stop shelter construction work
Object of the contract Bus-stop shelter construction work Description: Contract notice: Bus-stop shelter construction work Authority Type: Regional or local authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45213315, 45100000, 45213300, 45231110, 45233222, 45220000, 71000000, 71320000, 71500000, 71700000, 45213315, 45100000, 45213300, 45231110, 45233222, 45220000, 71000000, 71320000, 71500000, 71700000 CPV Description: Bus-stop shelter construction work. Site preparation work. Buildings associated with transport. Pipelaying construction work. Paving and asphalting works. Engineering works and construction works. Architectural, construction, engineering and inspection services. Engineering design services. Construction-related services. Monitoring and control services. "Budowa infrastruktury do obsługi transportu-collective action ", action: Preparation of the bus infrastructure for collective transport needs Reference Number: WZP.271.1.2018 Construction of infrastructure for mass transport services. Main Site: Town and commune Wieliczka. - Disassembly of benches and traffic lights together with transp. to the ZGK in Wieliczka, ul. Single 30-14szt., - Disassembly of the light and transp. to the ZGK in Wieliczka, ul. Single 30-20 pcs., - Carport 3 module. -standardowa z wypos.-83 szt., - shed 3 module. - cantilever (without side walls) with equipment - 17 pcs, - Shed 4 module. - standard with a 3-item equipment, - Pavement cube. concrete. along with the foundation-3760m2, - The edges of the concrete. 15x30x100 cm on the ballast cem.-piask.-1190mb, - The edge of the concrete. 8x30x100 cm on ballast cem.-piask.-1901mb, - Bicycle stand 15 positions with roofing-1pc, - Bicycle stands: 10 posts from- 2 pcs., - Resistance palisade - 93.2 mb, - Drainage with concrete pipes - 330mb, - Pedestrian crossing marked with horizontal and vertical signs (page 8 pfu at shelters) -2 pcs, - INOX-type roof 2p. made. is obliged to make about 720 mb of pedestrian routes as well as piping of existing ditches in the indicated places in PFU, constituting an attachment to the ToR - "Location of bus stops fromakrzej robot "and reconstruct the existing surface in the existing stops in the city of Wieliczka. The contractor is required to obtain consent or final decisions and conditions for the construction of the site for construction purposes. The contract will provide the persons indicated by the power of attorney with the above actions Sheds should be designed, constructed, mounted, pedestrian routes, parking lots, pParking lac is to be designed, built in accordance with the guidelines in PFU. Shelter sheds should be made as spatial architectural objects constituting the canopies of seats for passengers at the bus stop. A roof made as a pitfall towards the rear of the carport with an attic with oval corners, protecting the roof from the front and side sides.yst .: showcase for the timetable (in the cabinets should be equipped with bus shelters in the urban area, and outside the urban area instead of cabinets are expected only OWZ with timetable), strips in the attic - from the front strip with the name of the stop and the lines and the side uphill slat with the name of the stop, bench, detached garbage can - Order. allows baskets integrated with the structuresheds, signs. carports with the D15 sign. Bet is provided under the main poles. foundation slab or prefabricated concrete foundation footings made of C16 / 20 class concrete, placed on a compacted sand bedding with a thickness of 10 cm. The construction of the shed is a skeleton welded from steel or aluminum profiles, delivered to the assembly site as a single element. Filling the rear and side wallsin case of their occurrence is a single laminated VSG laminated pane made of two panes of laminated glass with two layers of polyvinyl butyral foil. The roof is filled with laminated VSG sandwich panels made of two sheets of laminated glass with two layers of polyvinyl butyral film. All rear window panes should be made of solar control glassej with reduced light transmission. Illuminate. sheds should be made in LED technology, in integrated luminaires from constr. the roof. Energy from photovoltaic installations. installed acc. in the roof of the shed will be stored in the accumulator, which should be delivered and placed in a specially dedicated place. For lighting control. automation should be used. In addition, the automation will control the lighting. In such-the way it would turn on after dark and light up the light to the minimum level, eg 10% of the target intensity and increase the degree of illumination of the interior of the shed after detecting an approaching person. The automation must enable switching on the night break in the hours agreed with the order. Used akum. they must be maintenance-free, designed for cyclical operation and in places where unloading occursabove 50% with 1000 work cycles. Required battery capacity. it's min. 65 Ah. Lighting of the shed should be designed and made so as to obtain min. intensity of 20 lux inside the shed (calculated on height of 1 m, for at least 60% of the area of the shed). 1. Contractors who are not subject to exclusion pursuant to art. 24 par. 1 point 12-23 at the PPL and paragraphs 5 points 1 - 8 at PPL, 2. Each contractor must enclose with the tender the Single European Order Document (EJM) valid as at the date of submitting the offers to the extent indicated by the ordering party. 2.1) In case of joint application by contractors, JEDZ submits each of the contractors jointly applying for the order. 2.2) Contractor who intends to entrust the execution of a part of the orders to subcontractors without beingentities referred to in Article 22a of the PPL, it is obliged to include in its EED the relevant information in Part II section D and Part IV section C (the Contractor intends to subcontract the following part (percentage) orders). 2.3) Contractor who refers to the resources of other entities to demonstrate the absence of grounds for exclusion against them, and-compliance, in so far as it relies on their resources, the conditions of participation in the selection procedure or selection criteria shall also be submitted by EED regarding these entities, whereby EAT should be completed for each of the entities concerned and contain the information required in Part II sections A and B, in part III and to the extent that the contractor uses a third party in partIV. This form should have been completed and signed by the person authorized to represent the third party involved. 3. On request in accordance with art. 26 par. 1 of the PPL, the contractor is obliged to submit the documents referred to in paragraph 5, points 1 to 9 of the Regulation of the Minister of Development of 27.7.2016 on the types of documents that can be requested by the contracting authoritythe initiator in the proceedings for the award of the contract (Journal of Laws of 2013, item 1126) hereinafter referred to as the Regulation. 4. If the contractor has its registered office or place of residence outside the territory of the Republic of Poland, instead of the documents referred to in paragraph 5 of the Regulation (item III.1.1) sub-item 3 of the notice), he submits the documents referred to in paragraph 7, para. 1 point 1 and 2 and paragraph 8 para. 1 RegulationINTRODUCTION. Paragraph 7 par. 2, 3 and 4 and paragraph 8 para. 2 of the Regulation, apply. 5. Each of the contractors jointly applying for the award of a contract is obliged to submit to the ordering party's request referred to in point 3 of the documents referred to in point 3. 6. Contractor who relies on the abilities or situation of other entities on the terms specified in 22au Pzp is obliged-to submit at the request of the ordering party mentioned in point 3, with reference to those entities of the documents listed in item 3. 7. Declaration on the capital group - Contractor within 3 days from the date of posting on the website information referred to in art. 86 par. 3 uPzp, will provide the orderer with a declaration of belonging or not belonging to the same group of capital(drawn up according to the form attached as Appendix 2 to the Terms of Reference), referred to in art. 24 sec. 1 point 23 of the Public Procurement Law. Along with the submission of the statement, the contractor will provide evidence that links with another contractor do not lead to distortion of competition in the procurement procedure. In the case of joint application for a contract, each of the contractors jointly applying for-granting the order is obliged to submit the above-mentioned document. 1. The Contractor will meet the condition if he proves that he has financial means or creditworthiness in the amount of at least PLN 200, 000.00. 2. Contractors jointly applying for the award of a contract may show that they meet the above condition jointly. The above-mentioned also applies to the entity of another in whose financial or economic situation-the contractor is involved. In this case, the contractor and other entity may show that they meet the above mentioned condition in total. The offer must be secured by a bid bond in the amount of PLN 20, 000 (in words: twenty thousand zlotys 00/100). The bid bond must be lodged by 6.3.2018 until 09: 50 2. The Contracting Authority provides for the application of the procedure specified in art. 24aa uPzp. 3. The contracting authority does not provide for the conclusion of a contracty. 4. The ordering party does not anticipate a dynamic purchasing system 5. The Contracting Party does not plan to conduct an electronic auction. 6. The Contractor is obliged to submit together with the offer the following documents: 6.1) Offer form - completed and signed The offer form prepared on the basis of the form template constituting Annex No. 1 to the ToR. 6.2) Price form - prepared inbased on the attached price form attached to SIWZ constituting attachment No. 1a to SIWZ - Failure to attach the completed price form to the offer or attach it with errors unsuitable for improvement will result in the rejection of the offer under Art. 89 paragraph 1 point 2 at PPL, 6.3) Obligation of the entity to provide the necessary resources for the needs of the order or another document- if applicable. In order to assess whether the contractor, relying on the abilities or situation of other entities under the principles set out in Article 22a of the PPL (point 5.4 of the ToR), will have the necessary resources to the extent enabling proper execution of the public order and assessment whether the relationship between the contractor and these entities guarantees real access to their resources, the contracting authority requestsincluding the documents together with the offer (in particular written obligations) which specify in particular: - scope of available contractor resources of another entity, - how to use the resources of another entity by the contractor in the performance of the public order, - scope and period of participation of another entity when executing the order public, - whether the subject, on the abilities of which the contractor relies-with reference to the conditions of participation in the proceedings concerning education, professional qualifications or experience, it will perform construction works or services whose indicated capacities relate to 6.4) Appropriate power of attorney - or other document confirming the authorization to sign the offer - if the authorization to sign the offer does not result directly from the offer (power of attorney in oryginale or a copy certified by a notary public for compliance with the original). In the case of contractors jointly applying for the award of a contract - a document establishing a proxy to represent them in the proceedings for the award of a contract (power of attorney in the original or a copy certified by a notary public for compliance with the original). 7. The order will be awarded in the unlimited tender proceduredesign and build it in the formula. The rules for the construction works apply to these proceedings. Due to the fact that the value of the construction works in relation to the entire project (ITI) exceeds the amounts referred to in art. 11 para. 8 pzp, to the n. Orders the provisions applicable to the orders with the value exceeding the amounts referred to in art. 11 para. 8 uPp. 8. Offersshould be submitted in writing. 9. The Contracting Authority provides for the possibility of significant changes to the provisions of the concluded contract in relation to the content of the offer in the case (Article 144 paragraph 1 of the PPL). The contract changes are described in - 12 of the draft contract constituting an attachment to the ToR. Internet address (URL): http://www.wieliczka.eu Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Bus-stop shelter construction work was 06 Mar 2018. Bidding is closed.
This tender has been issued by GMINA WIELICZKA in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45213315 - Bus-stop shelter construction work, 45100000 - Site preparation work, 45213300 - Buildings associated with transport, 45231110 - Pipelaying construction work, 45233222 - Paving and asphalting works, 45220000 - Engineering works and construction works, 71000000 - Architectural, construction, engineering and inspection services, 71320000 - Engineering design services, 71500000 - Construction-related services, 71700000 - Monitoring and control services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 20111233. The purchaser document reference is 034112-2018.