Contract notice: Building demolition and wrecking Tender - 34554631
Tender notice from Hungary, published on 10 Jul 2019.
Executive Summary
The BMSK BERUHÁZÁSI, M?SZAKI FEJLESZTÉSI, SPORTÜZEMELTETÉSI ÉS KÖZBESZERZÉSI ZRT. has issued a Tender notice for the procurement of a Contract notice: Building demolition and wrecking work and earthmoving work in the Hungary. This Tender notice was published on 10 Jul 2019 and is scheduled to close on 09 Aug 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 34554631, while the tender notice number is 320905-2019 and Register on the platform.
Key facts
Summary
Contract notice: Building demolition and wrecking work and earthmoving work
Object of the contract Building demolition and wrecking work and earthmoving work Description: Contract notice: Building demolition and wrecking work and earthmoving work Authority Type: Body governed by public law Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45110000, 45111000, 45111100, 45110000, 45111000, 45111100 CPV Description: Demolition work. National Athletic Center - Bontasi Works Reference Number: EKR000764252019 The Budapest Athletic Arena will be in the forefront of existing, brown-headed epochs. to go to work in Bontasi Main Site: Hungary, Budapest 38086/78 and 38093 hsz-u real estate properties in Bontasi (in more detail in the resume-making of the documents of the Kezsz-derzes in the 3rd edition of the Documentary Documentary). Pest is currently neglectedletikai arena, which will be the center of the Hungarian athletics, will host a domestic and national competition, a sports sports event. The all-rounder, all-knowing vario-developer takes the "zoeld solas" into account, and the Danube bank has the right side of the river and the river. "The arena should be unique, 25 meters long and over 400 meters long.The Danube panorama running skateboard will cover the streets. The arena, the panorama-futopaly, and the dogueloette, nearly 10 hectares, will be used by sportspeople and the public alike, and will play an important role in the health of the people. . The former brown-headed place kialThe bumpy bark of the cave has a significant increase in the quality of the prey in the caves, and it enhances the reel of the eltoeltesere and sportglasses of Budapest's leisure time. On the banks of the Danube, a highly cedar carotid concrete factory, the industrial water heavily contaminated with cement, was the Danube River.the continuous cargo traffic overwhelmed the caverns almost allandoan dust. The yard, the oil spill and the contaminants collapsed into the drains. The athletic arena of the athletic arena crashes the croissant carousel, the teruel will be lost to the people, with an orderly and uninterrupted connection to the Danube. BThe Athletic Arena in Budapest will perform in the forests of its existing, neglected allapotu epuelet (non-demolition license) in the work of Bontasi. The 40 pieces of bontando epuelet (basics) and epuebasic data about letresz-: - oesszes brutto level space: 14 661 m - height of epuel and epilee resorts 3, 10-13, 05 m koezoett changes - epuelet and epiletreser space oesszes 112 286 legm Bontandok on the roads on the terrain. I am going to make sure that the disassembled epuelets, bases, and artefacts on the terrain and other epithetsones. The works must descend into the demolition and possible excavations of the chambers. The bontando epuelets contain 2 bontando eyelets, which, at the level of their cessation, occupy an elusive task. The bontando epuelets are skeletal in terms of structures: - longitudinal wall, - reinforced concrete pillar, - acellite structure structure. Existing, preserved artefacts can be found on the terrain in the FCSM Ferencvaros pump station and in the Budapest Central Heating Waste Water Treatment Plant oak decking sewage treatment plant, which must be secured continuously by the Bontas works. There is a need to take care of Ferencvaros pumping station kiosks, somethingeg for the whistleblowing tasks of the numerical export, it can also be used as a mixer. The Kvassay Zsilip and the VITUKI tower house must be secured continuously during the Bontasi work. The entire Bontasi terrain (147 473 m) is a shelter for the regiment, as well as the ammunition-free suicide. securitysagos handles a task. Wastes should be handled according to the conditions set out in the BREEAM Documentation. It contains a teasel (Technical Leiras). in his master's book is a host player against whom Kbt. Article 62 (1) to (2)one of the reasons for the exclusion is: The Kbt. Article 74 (1). Point b) AK excludes the AT, sub-agent, or alc. a reader who is a reader of the real money, who is the reason for the expulsion. With regard to Article 67 (1) (both the HUNGARIAN STATE-OF-LIVER and the non-MAGYAROREstablished at AT) and, where appropriate, al. the master (s) of the host (s) retaining its true account in 321/2015. Korm.rend. According to - 4, in the EECD, it is not necessary to declare ex ante verifiable the reasons for expulsion. The alatamaszto truths are from Kbt. Article 69 (4). Kbt. Article 69 (4). according to the timeliness of igazolo documents: THE HUNGARIAN STATE-BASED AT (k), and, if applicable, alc. for the record (s) of the host owner (s) in its original account. KR. Article 8 of the Kbt. - 62. - (1) and (2) exclude the grounds for non-recovery. KR. Passes and documentary declarations in accordance with Section 10 of the Act.For expulsion reasons, and in the case of aliases, the authentication documents issued prior to the start of the co-operation may also be presented (usable) as long as the contents of the records are true. Until the opposite proof of AK, the data content of the data is denounced by ATK's relevant statement. KR. Section 15 (1) is based on ATthe alk. In the case of a subscriber or organization that retrieves his / her real-life account, the KDB has to be inserted into the KDB only. Article 62 excludes grounds for refusal in forests. Let's draw attention to Kbt. Article 67 (3) and Article 321/2015. KR. - 3 (2) and (3). I am subordinate to those who do not take a break. on the AT, Kbt. Section 67 para. (4)We should bring attention to the statement in the 321/2015. KR. 12-14. And - 16 and Kbt. Ag iszta ag ag ag ag ag ag ag ag ag ag ag ag ag ag ag ag ag ag ag ag ag ag ag ag ag the Kbt. Article 65 (1) (c) and Article 321/2015. Government Article 26 (1) (a) and Section 26 para. (2) and Article 322/2015. Government Article 21 (1). based in HUNGARYIn the case of the owner-operator, the record number of the non-technical electronic records (https://registracio.kivreg.hu/web/index.phpframe=Search) is based on the data in the register of the construction contractor, not the host established in HUNGARY. In the case of the European Parliament and Council Directive 2014/24 / EU. of the registers listed in the bustst (extract) or other certificate or statement must be submitted. Section 65 (6) - (7), (11), and Article 69 (11). is iranyado. AT, ALV, Kap.organ works at the construction business. to register the ep before you start the appointment. excl. AK on 321/2015. KR. Section 2 (5). indicates that ATs have sufficient sufficiency for the expression in the EEKD α section Preliminary proof of suitability: the EECD is inaugurated, this is Kbt. Article 69 (4). Minimum Qualification (s) of the Applicant: SZ.1. AT is not established in HUNGARIAN if the construction industry is not listed in the notices of non-HUNGARIAN non-HUNGARIAN established AT in case it is not registered in European Union 2014/24 / EU.tongue of the Parliament and of Tacis XI. as well as failing to fulfill any of the other covenants contained in the aforementioned bust (the registration of the Hungarian Chamber may be debated at the earliest on the date of the author's report). Attached to AT: P1) 321/2015. KR. Section 19 (1). c): for the previous 3 rows of rounds of turnout, net of full arbeveteler P2) 321/2015. KR. Section 19 (1). c): statement of the previous 3 nautical mileage culminating in the purchase of the cousin (existing epuel busted out of the occupied epithelium). KR. Section 19 (3). Yes. Section 65 (7) - (8), (11), Article 69 (11). I think about the 321/2015. (X. 30.) KR. Section 2 (5). The proof of the suitability of the candidate is sufficient to justify their suitability for the EEKD "α" section. Preliminary proof of the suit: the EECD is inaugurated, this is found in - 69 (4) of the Kbt. VI.3) continued: 18) AK the submissions are in accordance with the sub-criteria of Article 76 (2) (c) of the Public Procurement Act, sub-clauses of the Best Arrangements as set out in Section II.2.5 of this AF.t specials 1. ert. shrinkage: Oesszesitett netto postlati ar (atalanydij): Sulyszam: 70. 2. ert. resz: The M2) is one of the professionals presented for the relevant study of the epiteuegyi and the epiteuegsseszeguegegegőző activity activities 266/2013. (VII. 11.) Government Decree [1. bust IV. Responsible Technical Manager] is a professional who has been appointed to the holder of the MV-E entitlementPractical experience during the practical period (day; minimum "0", best "60" or more), Sulyszam: 6, 3. ert. resz: The M2) has been presented to 2 professionals who have been trained to work in the field of epiteuegyi and the epiteueg-oesefusze-bleeds activities 266/2013. (VII. 11.) Government Decree [1. bust IV. Responsible technical manager] is entitled to MV-EVThe professional experience of a professional practitioner during the sag is defined as the professional experience of the contractor (day "minimum" 0, most favorable "60" or more), Sulyszam: 6, 4. ert. resz: The M2) has been presented to 3 professionals who have been trained in the field of epiteuegyi and the epiteueg-oesefuőseszőegőű activities 266/2013. (VII. 11.) Government Decree [1. bust IV. Responsibletechnical manager] professional experience of professional advisor during the professional practice period (minimum; "0" month, most favorable "60" month or more) specified for the holder of the MV-EG entitlement. ert. sub-subscriber: Epitope Design Plan Subtopics of Epidemiology Technology; Thread: 6, 5.2. ert. sub-subscriber: Epitope Service Plan Work Plan Subheading; Thread: 6 The 1st ereszszemp. Regarding the relevant KH utmutato (KE147, AP147, December 2016; December 21, 2016). backsheets Apply the reverse gold bullion method according to b) 1 b) to b. ert. Regarding KH utmutato (KE147, AP147, Dec. 2016, December 21, 2016). Buttons Apply a straight gold bullion method according to 1 (b) (bb) to AK. 5.1 to 5.2. in the case of sub-subsections, the relevant KH utmutato (KE 2016, 147. p. 2016; December 21, 2016) uses a dotted (dot-dot) model according to B.1. ert. mods moderately in AD I. 1) Koezb. The method. Article Kbt.40 (1). and the e-Kr base in the EDF for Keruel. The Kbt. 41 / A. - and e-Kr.11-12 2) The statement shall be accompanied by statements of the electronic declaration form generated by the EA in the EDF, as well as printed alairt, scanned pdf-declarations based on the other sample statement provided in Document I of the Prospectus. 3) AK for Kbt. Section 35 (8). based on koezb. at the beginning the winner is not ATm) It is possible to set up a basic organization level. 4) The report must be accompanied by an alairo al-al-cimpeldany, or a ticket from the court / chamber court. alairas-sample (or, where appropriate, authorized representative) 5) In case of in-line variation, the timer is attached to the cegbirosag. in and out of itthe corpse was doped with corn. If you have a change. not in progress, attach a statement to this effect 6) Attach Kbt. Article 66 (2), (5) and (6). statement. Article Kbt.66 (6). 7) AK a Kbt. Article 71 (6). base does not order another hianypotl if hp with AT... was involved in the event, and with this host's character, it would be a flattery of the other hianypot. 8) Az. exhibitors of koevs, who are qualified to qualify for qualifying qualifying criteria of qualified ATs: SZ.1., P.1., P2., M.1., M.2., M.3 9) AF II.1.6) Further explanation: The CoR does not ensure that the information on the file isthat the authors make such a complex breakdown for you. ellatasara iranyul, which is celebrity and justified by an author. within the framework of the same host. The possibility of a filming is not rudimentary for work, work organization and time-saving reasons. He is a fork of the AK to be the winner AT of the chess. (according to the 300 daystari day duration) beluel at six, so it would not be justified to break down the eljaras (taking into account the period of time given to the general limit) 10) AK is the first. doc-store a e-kr. It is the exclusive provider of ATs registered in the EDF system. The EKR Ututato is available at: https://ekr.gov.hu/portal/tamogatas 11) In the case of Koezoes, it is necessary to attach the one-letter reply 12) The IV.2.6. point based on aj. Koet. duration 60 days. 13) K points from 0.00 to 100.00 for each course. 14) FAKSZ: Dr. Laszlo Kiss, registration: 00172 15) AT Keteles will also bring Arazotta Ktgvetes with Arazatlan Ktgvetes, who has been released to AK. The read-out page for these artefactsIn this respect, the "t-column" of the column "I" of the "Main" task sheet of the Tt-Tlan Ktgvetes (Excel spreadsheet) is exclusive to the time-lapse of the nessusitett net in the cell contained in row 34 of the table. For the newsletter, you should skip the professional newsletter with the arabic coel and the 5th edition.. relentless shake. Epitope Service Plan. Referring to Figures 2-4. The artistic drawings according to the articulating tremors do not reproach the professional story. The schedule should include a technical plan for penzuegyi, which does not bother the professional journal. Authors. The winning AT must be updated by the winner of the technical penzuegyet plan.v. with a set of parameters with a set of parameters (to be added to the excavation according to the thirty-sixth anniversary of the thirty-sixth anniversary of the full-time period, the limit of the quarries is HUF 250 million / karesemeny, and at least 500 millio HUF / karev) at AT arrow Continued at III.1.2) Internet address (URL): http://www.bmsk.hu
The bid deadline for Contract notice: Building demolition and wrecking work and earthmoving work was 09 Aug 2019. Bidding is closed.
This tender has been issued by BMSK BERUHÁZÁSI, M?SZAKI FEJLESZTÉSI, SPORTÜZEMELTETÉSI ÉS KÖZBESZERZÉSI ZRT. in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45110000 - Building demolition and wrecking work and earthmoving work, 45111000 - Demolition, site preparation and clearance work, 45111100 - Demolition work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 34554631. The purchaser document reference is 320905-2019.