Contract notice: Building construction work Tender - 13573257
Tender notice from Hungary, published on 26 May 2017.
Executive Summary
The GÖDÖLLŐI PREMONTREI PERJELSÉG has issued a Tender notice for the procurement of a Contract notice: Building construction work in the Hungary. This Tender notice was published on 26 May 2017 and is scheduled to close on 30 Jun 2017, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 13573257, while the tender notice number is 197695-2017 and Register on the platform.
Object of the contract Building construction work Description: Contract notice: Building construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45210000, 45212000, 45214000, 45262690, 45210000, 45212000, 45214000, 45262690 CPV Description: Building construction work. Construction work for buildings relating to leisure, sports, culture, lodging and restaurants. Construction work for buildings relating to education and research. Refurbishment of run-down buildings. Kivitelezesi szerződes a Goedoellői Premontrei Perjelseg hasznalataban levő zsambeki Zichy-kastely felujitasara (I.B es I.C uetem). Kivitelezesi szerződes a Goedoellői PremOntrei The Zichy casting repository (IB and IC uetem) of the Zambia Zambek in use can be used. NUTS Code: HU102 Main Site: 2072 Zsambek, Zichy ter 3. Oktatasi epuelet Land plot of land: 15 879 m2 Existing built-up area: 3 556 m2 The existing furnaces in the teruelet: water, electricity, sewer, gas Main data of the current construction: I / B uetem: net foeldszinti basic floor: 236, 7 m2 1st floor netGround floor: 677 m2 2. floor net floor area: 667.8 m2 Roofing net floor area: 193.1 m2 Floor area: 627 m2 Ground floor: 1774.6 m2 627 m2. I / C uetem: foeldszinti nett- alapteruelet: 800.16 m2 1st floor net floor plan: 858.34 m2 2nd floor net floor plan: 293.34 m2 ueres padlaster: 253.8 m2 I / C uetem oesszes basic floor space: 1951.8 m2 253.8M2. In the I / B uetem, after the contracted structural work, the specialty industry begins, here in the originally more beautiful periodus, an improvised, western cuddle along the hollow epueletkontur along with the ephemeral epilogue. The new, main body of the western part of the western part of the whole courtyard is connected to the parlor of the park by a double belmagassagu aula-zsibongo. EThe long-standing lobby area is the entrance of the future gym, and a formally-running vertical drifting tower (downhole, pick-up) provides a complete, uninterrupted interior drift system. The hall is in Tancsics M. u. From classrooms. The pipeline leading to the yard in the sundeck, next to a small touring showroom, will be placed in the roof-mechanical engineering. So far, the whole structure of the western suck is covered, its roof-top, the hinged skylight. In the litter, the whole body and the electric body must be epitomized, the layers of the floor structures must be epitheted. The walls must be prepared, plastered, painted, painted, impregnated, impregnated, painted and painted. Legs and locksmithsThese, artificial stone elements have to be placed. In the I / C uetem, the existing functional and technically unusual completely outdated-swimming pool, gymnastics drama has begun to break up until the start of the works in the cloud. This is why the foaming foam level designed for this foel release is located in the gymnasiums of the gymnasiums, small gymnasium and 400 person warming kitchens and kitchens.Foeloette, on the first floor, you can go to the standard basketball pallet gym with a galloping room, with a caretaker, gymnasium room. The skeleton next to the gym is being tested with the small capillary force to provide the epithelial bodyweight. The new epoxy with reinforced concrete, thermal insulation facade system. Beam reinforced above the gymWhich is made of iron-clad foedem keszuel. From the original epoch, the court wall section containing the gate and statue is preserved, and the new structures will be taken up. The roof that is connected to the western barn is covered with a roof-top, and the roof that has been closed is planned to continue. Over the gym, a flat roof, titanic roofed attic. The hinged arches are made of aluminum, -Plastic structures. The interior tiled benches are made of parquet, greslap and resin floor tiles, in the gym with a sports paddle swinging structure. The walls were painted, with spot concrete, natur tegla and stone upholstery, in wet spaces with ceramic tiles. Gypsum board and heradesign ceilings for furniture. In the constructional hand we must take into account the complex (frontal panel-Supportive designs), the technical brochure of which is taut. The designers of the spacecraft, the depleted epilogic structures, and the designers of the design are mentally controversial. The implementation of the precautionary measures and the design of the prospective sub-assembly must be carried out with due consideration. The work has to be washed and stained The teruelet is a regenerative site and the epitaph is preserved, so under the ground floor work must be regenerated, and no work can be made out of the approved plan. In the procedure it can not be time-consuming, subtle and can not take Which is probably the case with a businessman to whom it isThe Kbt. (1) - (2) of - 62. The licensee shall exclude from the commemorative the time-maker, the sub-contractor, or the suitably accountable organization against whom a reason for the exclusion has occurred., The eligible economic operator in the 321/2015. (X. 30.) Government Decree No. 4 (1)On the basis of the preliminary document of the one-off European tender dossier. The grounds for exclusion under - 62 of the Code are inadequate. (X. 30.) Korm. Decree of the Ministry of Economy and Finance on the basis of the subproblem or the body of the eligible taxpayer, Article 62 paraInti kizaro reasons to confirm the truth. The credentials invoked by economic operators in 321/2015. (X. 30.) Government Decree 8-14. -----------------------------------------------------------------------------------------#################################### (4) of Section 67 paraIn the eyes of the excluded reasons, the date, the subtopics and the time of the subpoenas to justify the suitability of the body must not be more than the date of the present invocation. In the first case, the ESPD document is based on the second, and in the case of 321/2015. (X.30.) Kormr. According to the Kbt. Section 69 (4) Please contact us for further information. Section 64 (1) to (2) • To complete the test of the justifications for exclusion, use the web-site created by the European Commission for this purpose. The electronic form sampleAvailable: http://eur-lex.europa.eu/legal-content/EN/TXT/uri=CELEX:32016R0007 A Kbt. Article 65 (1) (c) and 321/2015. (X. 30.) on the basis of Article 26 (1) (a) and 322/2015. (X. 30.) Korm. On the application and application of paragraph (1) of Article 21 of the Act LXVIII of 1997 on the construction of the embossed coat. Toerveny (Etv) serineYou must be a registered trademark of an epitheting industry practitioner. If you are a non-Hungarian repatriated person, you are entitled to complete your contractual term if you are a member of XI. Or in accordance with the test procedures contained in the referenced breast augmentation. The timing of a bona fide arrol is to testify, -The suitability of the suitability test is not complete. Article 69 para. (4) of the Law on the Appointment of the Appellant (containing the Registrar's Chamber of the Registrar) to comply with the provisions of the Act on Subsidies.In addition to his statement, the appropriate test method is correct and the data is available at http://registrracio.kivreg.hu/web/index.phpframe=Search(A) and 321/2015 respectively. (X. 30.) on the basis of Article 19 (1) (c) of the Basic Regulation, the applicant shall attach to the application for a preliminary summons a pre-emptive pre-emptive period of three months from the date on which the merger takes place The time when he was on paper or when he started-To do this, as long as these arithmetic data is available. Subject to 321/2015. (X. 30.) Korm., If the Righteous Person is in a legal form in respect of which he is unable to make a declaration of arbevolt, instead of a suitable test and verbal modality in relation to these points, ajaYou may certify a penzuegy and a business opportunity with a declaration or document considered appropriate. The special needs of a well-timed or recruited recruiter is to prove that he is in a legal form in which the submission of a statement or a statement of the arbets is not possible and difficult to findIn addition to the appropriate test methods and certification modalities, you should be able to justify the modularity of the application. (X. 30.) Korm. The timing of the item is to prove that the suitability of the suitability test is complete. A 321/201(1) and (2) of Section 5 of the Decree No. 5 (X. 30.) on the basis of Article 3 (1) and (2) of the Decree of the Ministry of Foreign Affairs, The Kbt. (4) of paragraph (4) shall be submitted by one and the same time, and the Provider shall only apply the verdictIf the Provider is called upon to submit the Verdicts. 1) The Applicant is obliged to submit the application for a period of time in full or in part, Section 56 may be based on a supplementary service in the time-guest and in the case of the contents of the case-law documents, in cross-referral, as provided in point I.3 of the time-limit. The question-The balls can be edited even in formatted form. 2) The timekeeper will support the appropriate time schedule by placing a placeholder on 31.5.2017. Day, at 14:30 minutes. Location of the event: Zsambek, Zichy ter 3rd main Adventurer's name Attendants are aware that there is no room for admiring a room in the local beyer's arena.(3) The timekeepers' fees: HUF 10, 000, 000, that is, HUF 18 million. The place of payment: or the installer's payment amount: 11784009-21220818. The payer of the time-surety provider (full-time ) To justify their mode: Provider in the jury will provide you with detailed information. That's the timeThe "Provider of Time Zsambek 2017" will notify you without delay of the amount of the prepayment you are paying with the installer's payment account, the pennies interest rate or the secured guarantee or the cashier's handler, or you have a test depositweek. The Penzuai Investment or Secured Guarantee or Secured Contingent Basis has a prominent bargaining assurance license, which includes a minimum of twenty-four hours of provisional probationary working day. The timescales are provided by the Kbt. (5) to (7) of Section 54 of this Act. The time-outs must be up to dateThe fancier is sorry. The Depositary shall not attach a certificate of proof to the Bank or any other party with a bank guarantee level or insurance contract basis, including a pre-emptive handwritten signature of the Depositary, including a copy of the original Account Holder's Certificate of Assurance, attached to the due date, Nt masolati in the period of time to come up with the date of the booth. Timothy Reveal Timers attention to the Kbt. (5) and Article 73 (6) of the Civil Code. 4) CXLIII of 2015 will not be published in the buyer's and in the co-procurement documents in a non-compliant form. The provisions of the decree and of the regulations are ireland. Tender for the Kbt. Section 74 (2) shall not apply. 5) All other information about the date of receipt, statements and statements of evidence is contained in the documents of the co-authorship. 6) Attach any other information to the periodical officer and the co-authoring document as well as to the Kbt. According to the forerunner of the document, and not the document that has not been scanned above, which is to the fullness of the time, to its intentions, (7) Timekeeper calls Up to the attention of the supervisor, Section 53 (6) and the Kbt. (12) of Section 135 of the LPC, in view of the fact that Tamogatasi's authoritative Tamogato Foundation does not refer to the Tender Provider as a test certificate for which the contractor's request or completeness is invalid (Section 53 (5) - 6)- 8) In the case of a case lawyer and a case lawyer in a case-by-case case, the person is the subject of the proceedings. 9) Winning Auction Participant is the lowest of the 400, 000, 000 HUF / 100, 000, 000 HUF / Or to extend the professional liability officer for work. Further VI.4.3. pont. Internet address (URL): http://premontrei.hu/ Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Building construction work was 30 Jun 2017. Bidding is closed.
This tender has been issued by GÖDÖLLŐI PREMONTREI PERJELSÉG in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45210000 - Building construction work, 45212000 - Construction work for buildings relating to leisure, sports, culture, lodging and restaurants, 45214000 - Construction work for buildings relating to education and research, 45262690 - Refurbishment of run-down buildings.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 13573257. The purchaser document reference is 197695-2017.