Contract notice: Building construction work Tender - 38360405
Tender notice from Hungary, published on 27 Nov 2019.
Executive Summary
The DUNA-IPOLY NEMZETI PARK IGAZGATÓSÁG has issued a Tender notice for the procurement of a Contract notice: Building construction work in the Hungary. This Tender notice was published on 27 Nov 2019 and is scheduled to close on 20 Jan 2020, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 38360405, while the tender notice number is 561181-2019 and Register on the platform.
Object of the contract Building construction work Description: Contract notice: Building construction work Authority Type: Regional or local Agency/Office Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45210000, 45210000, 45210000, 45451300, 45421000 CPV Description: Building construction work Interior gardens Joinery work Danube bend Implementation of the center Doemoesoen Reference Number: EKR001257012019 Contract for the construction of the Danube bend at the center of GINOP-7.1.5.-16-2016-00004 Panzio performs the task of renovation of the resource storage that goes to the bottom of the structure. Main Site: 2027 Doemoes Kossuth Lajos Street No. 2 Danube-Ipoly National Park Directorate at 2027 Doemoes, Kossuth L. u. No. 2 of 831/4 wants to create a "Satellite Center epueletian unit" with a garden garden on the cootic terraces.There is a street and many smaller ones. The bad conditions are going to break down. The Forest School (formerly Bergmann Boardinghouse) is rebuilding its epuelet, currently under construction. In the real estate under number 2 (hr. 831/4), the two are single-sidedintersecting - from the tract allo is a one-storey, high-roofed main epuelet (base area: 1, 030.90 m2), with a unique concept based on an interactive, ground-based presentation of the Danube-Ipoly National Park area precursors, features and other natural features, about 300 m2 of interactive display, which is more custom software developer and more mechanicalincludes a demo element. The epuelet also houses a conference room for 150 people, as well as a national park fashion shop and buefe., which employs group or smaller-scale professionalscan be kept. This is where the service units - offices, storeroom, preliminary rooms, laundry room, service apartment, etc. - are located. In the case of Főepuelet, a compact heat pump with a built-in hydraulic block provides the cooler and the heater. Office Oct.Atasi epuelet heat is provided by a split system air-water heat pump. The main reason for the two epuelet coezoetti kueloenbseg is that the floor-heating of the Office-educational epuelet is provided with adequate flow of water at a higher flow rate to provide adequate comfort needs. I am planning a DHW content for the Epueletenken with a 300 l inlet air heat pump. The top of the main epuelet is the electric fishsolar panel group (HMKE photovoltaic system) for keruel designers, which is realized at a maximum power plant limit of 22kVA, with 84 polycrystalline solar panels to be placed on the roof, with support and module clamps. The energy produced can be utilized in its own network.ac. Kizaro reasons: In all cases: - In the process, no economic, sub-contractor or economic operator with whom the Kbt. There is one of the grounds for exclusion listed in - 62 (1) to (2).who is (a) subject to the power of exclusion, (b) who is subject to the exclusion procedure in the procedure. or in the case of economic operators not established in Hungary, in the register of their country of establishment or in their country of establishment. Except as otherwise provided for in Article 62 (1) (b) and (f), the economic operator who procures, submits or duly certifies the exclusions may not exclude of the Co-Procurement Procedure if the Co-Procurement Authority complies with the Kbt. Section 188 (4) - or buriedIn the case of his examination, the final judgment of the bureau under - 188 (5) stated that the economic operator in question had taken, before the date of submission of the offer, reasonable efforts to justify its trustworthiness. (4) - or in the case of a Birosag exequatur, Paragraph 5 of the final decision declares the reliability of the economic operator under the authority of the respective exclusion, and the authority of the time force to accept it. The final decision shall be submitted by the economic operator at the same time as the single European Co-Procurement Document (Kbt. Article 64). Article 67 (1)On the basis of the offer, the tenderer is required to submit the statement contained in the single European Co-Procurement Document for reasons of exclusion. exclusion grounds for failure (X. 30.) Government Decree shall be certified in accordance with the provisions of Article 8 of the Government Decree 321/2015. (X. 30.) Government Decree 321/2015. (X. 30.) Government Decree 12-16. Of the Kbt. Article 67 (4) is based on the arrow of the offererYou must make sure that you do not use Kbt for your contract performance. 62. - 321/2015. (X. 30.) on the basis of Section 15 para. - 62 excludesjustification of causes in the forest The Kbt. Section 65 (1) (c) of Decree 321/2015. (X.30.) Korm. a) and 322/2015. (X. 30.) on the basis of Article 21 para. Coevetings in the list of building contractors carrying out construction work in accordance with In the register - where the Kbt. There is no free control of the relevant data or breeds in the records referred to in Article 69 (11) - a simple extraction of the extract, a certificate drawn up by the managing body of the register or a document certifying the breed in the register.lni. A Kbt. Pursuant to Section 67 para. The timeline is 321/2015. (X. 30.) K.r. Pursuant to Article 2 para. (5), the ex-ante certification of eligible candidates shall accept a simple statement by the adviser. In order to enter the certificates, the invited tenderers must prove that they are suitably qualified as follows: The tenderer attaches: In all cases: P1. No. 321/2015. (X.30.) On the basis of Section 19 (1) (b) of the Government Decree, the last three days prior to the date of the call for tenders shall be closed in accordance with the accounting rules If the law of the country in which you are established requires a trial, then. cloud P.1. does nothas all the time required by the Benchmarking Force, because after the beginning of the period he started the art show, the suitability of the collector's supplies (Item 1: execution of high-level construction work, Item 2: carrying out of construction work is certified by a solemn declaration of revenue. No. 321/2015. (X.30.) Korm.Paragraph (1) (c) based on the total number of business and supply of goods for the business year preceding the call for tenders, completed with the turn of the day (Item 1: execution of high-level work, Item 2: completion of work (a) from the general sales tax (VAT) or the income statementThe date and time of the start of the contractor's activities, if available, if this information is available. does not have a document because it operates in a legal form which is impracticable in submitting the statement of account or the statement of income as required by this paragraphYou may prove your financial and economic capacity by any other statement or document considered appropriate by the date rating system instead of the y and certification mod. The additional information sought by the tenderer in question is intended to prove that it operates in a legal form which is impracticable in submitting the report or the statement of income.Instead of the aptitude test and proof modality required by this clause, you should look for an aptitude test that is acceptable to you on a time basis. According to Article 65 para.for players, the possibility of a one-to-one match is, of course, sufficient if koezueluek is one. The detailed terms of the offer and the formal requirements for entering the offer are included in KD. KD Present Call I.3. The restrictions set out in point 1 are limited to nelkuel, full dog, koezvetlenuel and free of charge at the 11:00 pm deadline on the day. AKthe commissioned commissioners will try to renew: - commissioners commissioned: 1. res: $ 5, 000, 000, 2-3. file: 1 000 000 HUF.Provisional commissioners until the expiry of the time limit for the appointment "Transmission commissioners - Implementation of the Danube Bend Visitor Center - 1./2./3. file "coezlemel with notices, the time power with Hungarian Allamkincstar must be 10032000-01711813-00000000 per accountto pay or to transfer, - your commissioners are Kbt. Article 54 para. Article 54 (4). 4.AK does not make it possible to establish a business organization (project partnership) for the purposes of the contract. The aptitude test (section III.1.2, sections P1-P2, section III.1.3, M1 - M2) has been defined more strictly by qualified advisors. There is also a maximum score of 0-10 points for reviewing the content of the quotes in terms of content. evaluateher method: the ar aspect is a reversed gold certificate, the qualitative aspects are a linear gold certificate (aspect 2 is a 3 point case). The modems are described in detail in KD in keruel. 7. The offer must be accompanied by: - a reading sheet (co-authoring items: name of the offerer, location, main, identifiable information according to bureaucracy) - ifaccording to the quotation extract of the offerer, there is a pending listing procedure, the offeror must attach to the offer the list of letters submitted to the offer and a statement of the same, duly certified by or006. evi V. tv. 9 of the Alairasi - sample., - the Kbt. 66 (2), (6) and 67 (4) (also in the case of negative content) - professional offer (details of professional offer are included in KD) 8. A 322/2015 (X.30.) Korm. Under Article 26, the contract with the contractor shall be at least as long as the contractorat least $ 1, 000, 000 / year and $ 50, 000, 000 / arm, 2nd, 3rd rate: $ 100, 000, 000 / year and $ 10, 000, 000 / month CAR to extend or extend the existing liability insurance contract to the OSCE or to extend it until the date of the last technical claim.maintained. The insurer shall provide cover for the activities of the offeror and for all co-workers, liability for defective performance, faculties of personal serueless, faculties of property, as well as non-material faculties and their purely financial faculties. Winner of the tenderer test at least until the contract test is completed III.1.3) 1st grade M2.A), B), C) in the Chamber Notices of 266/2013. (VII.11.) Government Govt. MV-E, MV-EG, MV-EV shall be entitled to prove their competence, which is the condition of the contract test. K does not apply Kb in this procedure. Invalidity reason under Section 75 (2) (e). On-site Bejar: 12/12/2019, 10:00 am; Meeting point: 2027Doemoes Kossuth Lajos utca 2 12. FAX: Dr. Darago Mate, 00102 Continued in Section VI.4.3) Internet address (URL): http://www.dinpi.hu
The bid deadline for Contract notice: Building construction work was 20 Jan 2020. Bidding is closed.
This tender has been issued by DUNA-IPOLY NEMZETI PARK IGAZGATÓSÁG in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45210000 - Building construction work, 45451300 - Interior gardens, 45421000 - Joinery work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 38360405. The purchaser document reference is 561181-2019.