Contract notice: Building construction work Tender - 24937222
Tender notice from Hungary, published on 12 Jul 2018.
Executive Summary
The GY?RI EGYHÁZMEGYE has issued a Tender notice for the procurement of a Contract notice: Building construction work in the Hungary. This Tender notice was published on 12 Jul 2018 and is scheduled to close on 14 Aug 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 24937222, while the tender notice number is 299739-2018 and Register on the platform.
Object of the contract Building construction work Description: Contract notice: Building construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45210000, 45210000, 45210000 CPV Description: Building construction work. Sopron St. Orsolya Gimn. Horvath Home Remodel Reference Number: EKR000350332018 Construction contractor of the Sopron St. George's Roman Catholic Gymnasium, Altalanos School, Ovoda and Collegium, and the construction work for the Horvath Homeland Publications Main Site: 9400 Sopron, Orsolya ter 2 3, hrsz. : 132, 134; Archeological site: 3281, II. k60 m- Vacuum cleaner on sidewall: 10 420 m2 Ceiling finishing on ceiling: 2500 m2 Finishing smooth side veneer: 5150 m2 WTA wall render plaster: 1965 m2 Facade upholstered rough birch wall : 2500 m2 OSB parquet flooring: 1487 m2 Gypsum plasterboard underfloor for double-walled metal structure: 1881 m2 S1740 m2 Parquet flooring industrial parquet: 2749 m2 Application of plastic dispersion paint system: 13560 m2 Surface protection: 672 m2 Insulation for floor insulation: 330 m2 Court rubber cover for floor drainage system: 2040 m2 Gres padlo Construction: 236 m2 Preparation of an undercut reinforced concrete plate: 330 m2 Creating a steel or jute bush:486 m2 Main restoration tasks: This includes the restoration of the richly designed main garret sections, terracotta decorative items of the Varkeruel, the original lithuanian bushing and the restoration of the labas. the restoration of original festivals and the facade toerthe restoration of tenetic syntags. The basic flooring of the exalted works is: Horvath-haz: approx. 3800 m2 St. Orsolya Roman Catholic General School, Gymnasium and Collegium: approx. 4200 m2 Total quantity: Horvath-haz kitchen technology: purchaser of kitchen technological appliances and related workshops Horvath-homeland epueletgebet II: some epuelegepeszet eszkoezo beszspecialty and related workshops Horvath-homeland etelift: the most prestigious supplier and the related works of engineering The optios roofs in the technical documentation, as well as in unreasonable experimentation, are carefully spaced out. Optional teteles are tested on time. In the case of optional tetons, the provider retains the right to opt for optios tethal-vain the eyes of the author, or in the case of the author of the author's thesis, on the third day of the month, and if he wishes to take it only in the form or in the case of the reckoning, or if it may be unequivocally unchecked, the indicated opaque parts. Explain In the procedure, it can not be time-consuming, -and may not be considered as legitimate by any economic operator against whom the Kbt. Section 62 para. (1) - (2) excludes all grounds for exclusion. Article 74 (1) a fundraiser excludes from the commemorative the timer, the subproblem or the organization that has the right to justify it, who is the root of the exclusionary reasons; or the jerk is okaykoevetkezett as you turn. contracting entities may point to the attention of the Public Procurement Act. - 64 (1) and (2) Art. POSSIBILITY oentisztazas formalities of : The bidder of refusal of 321/2015 Korm not there (in the following Korm).. (X.30.) - 1 (1) - (5) - ., Section 2 (1) and (4) para., Section 3, Section 4 (1), (3) and (4) para. 6-8. must certify in accordance with - - 10-i, and in the 12-16.--ai, so thisran: - Section 1 (1) of the Ordinance of the Government. on the basis of the timely provision of time for all time- In the case of the one-off European Case Law Document, you must certify in advance that there are no grounds for exclusion, - then the Kbt. Article 69 (4) according to the time of the interviewee-the exclusionary reasons do not apply to statements and confirmations pursuant to Sections 8 and 10 of the Government Decree. Attorneys call attention to the Kb. Paragraphs (5) to (7) and (9) to (11), (13) to (14) of Article 69. The one-off European Deed of Artwork shall be governed by Articles 3 to 7 of the Government Decree. According to the paragraph, it must be included in the EDF. Provider is Section 2 para. (2) of the Government Decreenot applicable. Section 67 (4) Everyone who has the time to make a statement must state the fact that he or she will not be required to complete the contract. Article 62 (1) and (2), it is unfortunate that a time-lapse does not give rise to the name of known subprojects in the standard. The timekeeper must also declare in his / her statement that-is there a change in the procedure for a change in the record. In the case of a current version of the record, the submitter of the probationary is to attach to the cegbirosag the registered copy of the bill and the certificate from the handover to the cegbirosag altal [Section 13 of the Government Decree]. Please note that the current version of the registration file has to be declared inadmissible. II. Professional tthe following is applicable: SZ / 1. It is unsuitable for the provider, provided that: (i) the economic operator established in Hungary on an epitheting industrial activity is not listed in Art. (3) of the Companies Act, or (ii) in the case of non-Hungarian industrial companiesyou are not listed in your country of residence or if you do not have permission to do so in the country of your resident, with your permission, or with organizational, chamber members. Verify mod: SZ / 1. Section 1 (1) of the Government Decree. Article 5 (1) on the basis of the information provided by the applicant, he must include the single EuropeanARC. in the case of Section "α" in this regard, in view of the fact that according to - 2 (5) of the Korm. Order the acceptor accepts the simple statement by the distinguished economic operator also on the provisional verdict of the suffi cient trial of the SZ / 1. (4) to (7) of Article 69. In the case of a registered economic operator established in Hungary, supervisor; (2) - (1) (2) to (3) of the Government Decree, 5) to P / first A 321/2015. (X.30) Ko(1) and Article 5 (1) of the Order of the Minister of Foreign Affairs (hereinafter: the "Order of Government"), the applicant shall attach the one-week European Documentary Document, (2) (5) of the Korm. Ordinance on the basis of Article 2 (5) of the Korm. Ordinance accepts the plaintiff's explicit statementis also P / 1. (2) of the Korm. Ordinance on the basis of the provisions of the Kbt. (4) - (7) of Section 69 of the Civil Code, as referred to in Annex IV to the Government Decree, It shall be appropriate for the chapters to certify that they comply with the applicable test procedureaccording to the following: P / 1. The last time the deadline for submitting a request for a period of time before the day preceding the day before the deadline, according to the provisions of Article 19 (1) (c) of the Government Decree, must be accompanied by a declaration of intent on the full sum of money the runner when he ripped paper or mwhen it started to work when these data were available. 1. The reason for this is not the reason (s): The timeframe does not provide the opportunity for a given period, given that both the functional and the technical aspects are comparable to each other in terms of performance, which, in view of the lower level of specific materialthe organizational, organizational and organizational aspects of the competition are as well as the opportunity to provide the fundraiser with the opportunity. It is also possible to justify the fact that the warranty claims that may be incurred in relation to each item are easily simplified to a contractor. Also in view of the beruhaThey all look to the same from their home and unios forrasu projects, and from the point of view of the pennies, they are letting them spend time and money on their own, if they are looking for a better companion for their beloved designers. It is to be noted, moreover, that ensuring the continuity of education in the academic world is exclusive to the oed-with the help of a hand held time-honored apprentice. Due to this fact, according to the provider, technical and economical reasons can be secured with the help of the reseller's license, so it does not provide the opportunity. Minimal duration of the probationary period IV.2.6. based on 2 months, that is 60 days, the time limit for which the time has expired. Further, iand the disclosure of such documents is a matter of regret in the course of the proceedings and the urgent need for information. The co-procurement documents must be subtracted from the deadline by the deadline given to the deadline by the deadline.it is a good idea to have the interested host enter a date in the EDF system from the palm of the hand. The timeframe does not cover the bases of the contractor's master plan (project), nor does it allow the winning (koezoes) provider (s). The summaries of the suitability and the proof of the minto the list of prestigious time-keepers, the most rigorously collected limit for the time-consuming party III.1.2. P / first III.1.3) M / 1.-M / 2. point 6. The timekeeper does not give you time to schedule the timing. 7. The Provider reminds us that the Kbt. Paragraph 81 (4) to (5) applies. The timing shall include the date of the Bidder. Section 66 para. (2)statement said. 9th For those who are spending time in the EDF. Section 20 para. (4) of the basic Regulation shall not be required to disclose the information contained in the Kb. Of Section 66 para. (4). 10. For the time being, (6) of Section 66 shall not be required to be filed (also in neutral). The timeframe will give you more attention to the Kbt. Article 138 (1) and (5) of the Constitution. The Kbt. 6(4) of Section 8, with due regard to the fact that, in accordance with the provisions of the EDF. Section 10, paragraph 1, of the form provided by the EDF, shall be accompanied by a reading of the reading room. The Applicant applies the Kbt. Article 75 (2) (e) of the Constitution. The co-procurement process involved-accredited accredited body: dr. Patay Geza (00226) et. Meszaros Aron (00985) 14. Provide the opportunity to provide the latest information about the Kbt. (7) of Section 56 para. Placebear Date: 18.7.2018 9:00 hrs. Location of the local beyars: Szent Orsolya Roman Catholic General School, Gymnasium and Collegium, 9400 Sopron, Orsolya ter 2 3. Internet address (URL): http://gyor.egyhazmegye.hu/
The bid deadline for Contract notice: Building construction work was 14 Aug 2018. Bidding is closed.
This tender has been issued by GY?RI EGYHÁZMEGYE in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45210000 - Building construction work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 24937222. The purchaser document reference is 299739-2018.