Contract notice: Building construction work Tender - 22584119
Tender notice from Hungary, published on 19 Apr 2018.
Executive Summary
The MISKOLC MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA has issued a Tender notice for the procurement of a Contract notice: Building construction work in the Hungary. This Tender notice was published on 19 Apr 2018 and is scheduled to close on 23 May 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 22584119, while the tender notice number is 168456-2018 and Register on the platform.
Object of the contract Building construction work Description: Contract notice: Building construction work Authority Type: Regional or local Agency/Office Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45210000, 45210000, 45212351, 45210000, 45212351 CPV Description: Prehistoric monument construction work Diosgyor Var Complex and Touristic Developer, Interior Var and Kuelső Var Execution Work Diosgyor Var Complex and Touristic Developer, Internal Var and Kuelső Var Executing Work Main Site: Miskolc, Hrsz .: 32827 / 1. In Miskolc, Diosgyőri Var and all reconstructions are the technical contents of the rovidae belowl, with meshes and iranymutato to plan the kiiro to show. II. I use the complete reconstruction of internal varnish: Approved develops (initial substrate) useful base flooring: 2058 m. Basic floor space of bases: 941 m. The useful floor space of the new buildings for the reconstruction of the second floor is 4508 m II. The hollow balloons of water-repellent reconstruction are: 652 m---------------- Reconstructed epueletreszek: the return of the Ny-palotaszarny, the descending tower (with its disembodied ones) with the burial ramps, the return of the high roofs of the palace, the killing and the roofs, the complete reconstruction of the towers with the killing and the roofs, archious walled, cross-shaped, easy to handleit is funny. III. I'm going to make a complete reconstruction of the whole house: The garden of Kiralyne: the use of the gardening techniques of Koezepkori, the use of authentic spices and spinaches on the basis of authentic spicy foods Toebbfunkcioshelyis: the kitchenette on the first floor connected with the theme of the Kyrgyzstan's Fireserver, where original, available recipes can be made. It is possible to show off the process of making such potions, and then the cooked meals can be eaten by the visits. Accelerating minds: disillusioned. Reconstructed epistles: reinstatement of the four bitch pairs, laying down hollow pottery and function, reconstruction of the cortina walls (with the joints), and the reconstruction of the reconstruction of the new buildings, which is a useful base ground: 2880 m. III. In the second part, the sculpted hollow balls of the sculptural reconstruction are: 1970 m The basic depth of the hollow varncto of the net (in the 2nd and 3rd tees): 3650, 90 m -open-roof terraces are always included in the course (II-III.): 4768.87 m. The detailed workload is included in the schedule and the technical description of the time-consuming person and the documentary rescue plan. (X. 30.) Korm. Of Section 46 (3) and the Kbt. Section 98 para. (3) in the revision of the Deryne Homeland Territory.it is not possible to provide a time-consuming, sub-contracted, and not eligible economic operator who is authorized by the Kbt. (1) - (2) of Section 62 of the Constitution of the Republic of Croatia, or in the event of the exclusion of the exclusion of the former. Article 67 (1) EEKD has to prove in advance that it does not belong to the Kbt. (1) to (2) of Section 62 of the Constitution. Gets. order. sorry. too. The Kbt. According to Section 67 para. (4), it does not claim the subversion of a subversive cause. A 321/2015. (X.30.) Korm. Decree No. 8, Section 10 and Articles 12-14. -------------------------------------------------------------------------------------------------------------------- (1) and (2) of Article 62 (1) and (2)the. The timing shall include a statement by the declarant that he is in the process of making a separate entry for him. The application will call attention to the Kb. Article 64. - SZ / 1. The Kbt. Section 65 (1) (c): - A 322/2015 (X.30.) K.r. According to Section 21 the Hungarian settler is the owner of the construction industryyou must repel the Etv. according to the names of the building industry executives. The non-Hungarian indigenous economic operator is licensed or registered in the country of his or her country of establishment, or is licensed in the country of his or her country of establishment, or of his or her organization or chamber. They do not fulfill the obligation of a timely inactivity. Section 67-(1) of the EEKD. A 321/2015. (X.30.) Korm. Order Section 2 (5) of the basic rule The Adoption Board accepts a simple statement by the distinguished economic operator. According to Article 69 (4) of the Act No. 322/2015 (X.30.) K.r. Section 21 of the Hungarian Farmers Act shall include the activities of the designers engaged in the construction of the epithetMarian name. The non-Hungarian indigenous economic operator is licensed or registered in the country of his / her country of origin or in the country of his / her residency, legal or organizational, Article 67 (1) of the EEKD. A 321/2015. (X.30.) Korm. Ordinance - 2 (5) bek.alapjan Gift Provider accepts the excluded ownerI will give you a simple statement. Section 69, subsection (4), subject to the provisions of 322/2015. (X.30.) Korm. Decree 21 - (1). and the Kbt. Article 65 (1) (c) of the basic Regulation. S / 1 minimum requirement: SZ / 1.1. The economic operator in the building industry is unsuitable if it is not registered in the Etv. according to the lawI; if not registered in Hungary, if it is not registered in the European Parliament and Council Directive 2014/24 / EU XI. and does not fulfill any of the other test procedures contained in the aforementioned breastfeeding. Section 65 (6) to (7); (9); (11) of the Kbt. Paragraph (11) of Article 69. I am also persuaded. P / 1. Ajanplease contact us. (1) of Section 67, according to which it complies with the applicable test method (s). A 321/2015. (X.30.) Korm. Of Section 2 of Subsection (5) of the Tender Ordinance shall be approved by the distinguished economic operator for a simple statement. According to Article 69 of Law No. 321/2015. (X.30.) Government Decree (hereafter:-"Article 19 (1) (c) of the Criminal Code of the Criminal Code of the Supreme Court of the United States of America (hereinafter referred to as" the Criminal Code "). - In case of a qualifying organization, in accordance with Section 65 (7) of the Kbt., and in accordance with the provisions of Section 6: 419 of the Civil Code, the Operator shall be responsible for the Ajanlatkewhenever the Ajanlat-val is unable to complete the defeat or defective performance at the end of the race. Pay attention to the Kb. Section 65 (11). The referee will call P / 1. please refer to the appropriate test procedure. Section 140 (9) - P / 2. Time limit for the Kbt. Article 67 (1) of the EEKD declarations, which states that it isit is responsible for the appropriate test method (s). A 321/2015. (X.30.) Korm. Of Section 2, Subsection (5) of the Tender Ordinance on the provisional validity of the suitability test shall be accepted by the distinguished economic operator's simple statement. According to Article 69 of Law No. 321/2015. (X.30.) Korm. Of the Hungarian Government, all (even during the period under review)I have to write a more recent statement with the following content: the number of the guilty person, the date of the same person, and the number of the guilty person, who has been sentenced to a total of 15 days, shall be returned allotted was Under the terms of the "Terms of Use", the Trustee shall refer to the term defined in paragraph 25 of Article 25 of the LXV tv, as stipulated in paragraph 25 of Article 25 of the Law on the Payment Service of a Penservice Service Provider. The EEKD Declaration under Article 67 (1) shall be submitted to the(s). A 321/2015. (X.30.) Korm. Of Section 2 of Subsection (5) of the Tender Ordinance shall be approved by the distinguished economic operator for a simple statement. According to Article 69 para. (1) (b) of the Criminal Code, his or her predecessor is under the administrative law of the last three(if the law of the country of the country where the host is established resides). P1. and P3. points 321/2015. (X.30.) Korm. Rule 19 (3), if the time-holder does not have the document referred to in Article 19 (1) (b) and (c) of the Act on the Data Protection Act, because he is in a legal form, or arbevno written declaration can be made from the South at any time, except in the case of a suitable test and verbal modality, any such statement or document may be used to justify the pennies and the economic capacity. The excellence of the time-consuming developer is to prove that he is in a legal form, in which regard the presentation of the report or the statement of the facts may not be possible and can not be used as an alternative to the appropriate test and certification modalities for these points. The score is 0-10. Translated, quality aspects are straight goldositast. 2nd The comic book documentation is available at: http://miskolcholding.hu/kozbeszerzes 3. The declarant's statement of the Kbt. Section 66 (2); (4) and (6) of this Article. Also in neutral content, the provisions of Section 66 para. (2) are original. The time-consuming host organization will be deprived of the fundamentals Kbt. Article 35 (1) to (8). 4. The timing should contain a read-outthe Kbt. According to Section 66 para. (5) of the Kbt. Article 68 (4). The date must be attached to the person who has the right to take a note, a statement or document to the Alairas cimpeldanyat or a subordinate sample. The offer should include a professional quote, including the timetable, contains an organizational plan in which you will be presentedTo ensure that the timekeeper is required to ensure the continuous flow of var. The professional timeline should include the technical and technology plan and the layout plan for Penzu. The Kbt. On the basis of Article 47 (2) of the Constitution, the verifiers may also appear in a simple masonry, except where the idolater has such an extension. Arrivals: full dayIn the eyes of an orthodox, seaside account, the foreign nationals of the Hungarian National Bank must apply the foreign exchange rates. Iranyado time: koezep-europai local time. (CET) 10th In this case, there is no waiting room and consulates. Winning bidder is trying to test the controversial contractor at the time of the contract-or to extend the cause of the case: the liability insurance for at least HUF 500 000 000 / HUF / milestone, HUF 1, 000 / HUF, per annum. The Applicant shall apply this Tender Procedure as a prerequisite. Section 75 (2) (e). 13. In the case of the current contributor, in the case of the current contributor, please enclose the date. Szerződeskoetesit means that the idler is M.2. (www.mmk.hu) or Magyar Epitesz Kamarai (www.mek.hu), which must be insured during the entire duration of the contract. 15. The accredited accreditation body in this category is Dr. Alexandre Kisely (registration number: 00113) 16. It's in the classYou will receive a respectable time slot for your account as it is net 15 000 000, - HUF, ie net Tizenoetmillio HUF. Providers of the timescales are: the time-surgeons are paid by the CIB Bank Zrt., With a monthly salary of 10700086-42689106-51100005, until the due date of the due date, with the conditionality. The timescale for the juryplease contact us. in accordance with its provisions, in the form of a penitentiary interest or a secured guarantee or in the form of a depositor, or in the form of a written authorization of the assurance undertaking. AK has the technical or professional qualifications as well as the certification of the qualified list of time attendants more rigorously hthe P1, P2, P3 and M1, M2 ratios were 18, respectively. At the end of the period mentioned in point II.2.7 of the cloud, the time limits are: a) Internal Var 16 months b) Attendance Attorney calls attention to the application of the Kbt. Article 98 (3) of the Penal Code. This is possible in the following terms: Deryne haz construction, points 32818/1), which in the case of a bidding for a bidding for a criminal offense of bribery in a court of law, shall be filed according to the provisions of point 13 of the Koezbeszerzesi Documentation. It has also taken into account these possible invested values Internet address (URL): http://www.miskolc.hu Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Building construction work was 23 May 2018. Bidding is closed.
This tender has been issued by MISKOLC MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45210000 - Building construction work, 45212351 - Prehistoric monument construction work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 22584119. The purchaser document reference is 168456-2018.