Contract notice: Building alteration work Tender - 19148249
Tender notice from Bulgaria, published on 15 Dec 2017.
Executive Summary
The ОБЩИНА ВИДИН has issued a Tender notice for the procurement of a Contract notice: Building alteration work in the Bulgaria. This Tender notice was published on 15 Dec 2017 and is scheduled to close on 22 Jan 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 19148249, while the tender notice number is 499570-2017 and Register on the platform.
Object of the contract Building alteration work Description: Contract notice: Building alteration work Authority Type: Regional or local authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45262700, 45262700, 45212300, 45262700, 45212300 CPV Description: "Conservation, Restoration and Exhibition of the Vida Municipal Theater Drama Theater and Landscape Design" The subject of this public procurement is "Conservation, Restoration and Exposition of the Municipal Theater Drama Theater "Vida" and shaping the adjacent surrounding space. " Main SitMunicipality of Vidin, Vidin, district 371, "TsGCH - I part" - Vidin, 12, "Gradinska" Str., The building of the Dramatic Theater - The subject of the present public procurement is "Conservation, restoration and restoration" exhibition of the Vida Municipal Theater Drama Theater and shaping of the adjoining surrounding area. " The subject of this public procurement includes the execution of construction and assembly works and(RNC) in accordance with a prepared, agreed and approved project, in the following parts: • Part of Architecture; • Part of Structures; • Part of Water Supply and Sewerage; • Part of Technology; • Part of Electricity; • Part • Part • Energy Efficiency • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •of the construction waste - The execution of the construction works and the RDA is carried out in accordance with Part Three "Construction" of the Territory Management Act and starts after the signing of the Protocol for the opening of the construction site and determination of the construction line and level of the construction - implementation and acceptance of construction works and putting into operation of the site will be certified by drawing up and signing bythe holders of the relevant acts and protocols in accordance with Ordinance № 3 of 31.07.2003 for the preparation of acts and protocols during the construction The technical execution of the construction must be executed and in accordance with the requirements of the Bulgarian legislation in force, the technical specifications of the inputs in building construction products, materials and equipment, and good constructionand practices in Bulgaria and in Europe The technical realization will be carried out in the same sequence in which the works are described in the working projects, including their numbering It is envisaged to restore and preserve the exterior plasters and elements on the facade of balusters, pilasters, cornices, hatchways and pedestals, as well as balconies, parapets, balusters, columns on the balconies, etc. At allSecondary window niches will be fitted with wooden windows that will restore the previous look of the theater. Both new and interior wooden doors will be fully authenticated. Complete replacement of the wooden roof structure and roofing, repairs on the stage, sanitary units, interior walls, floorsceilings; the old joinery will be replaced with new wooden window frames with the same glazing as the original, etc. - It is planned to replace the plumbing and sewerage, electrical, heating and ventilation installations, new exterior decorative energy-saving lighting will be built and fire-alarm installation. The participant should have a registerin the Central Professional Register of Constructors for the first group, third category of construction works and for sites - constructions under Art. 137, para. (4) (f) of the Spatial Development Act, in accordance with Article 5 (6) of the RVTPPRP (Regulation on the Procedure of Registration and Maintenance of the Central Professional Register of the Constructor), and for non-residents - registration in a corresponding analogue register nand a Member State of the European Union or another State Party to the Agreement on the European Economic Area, under the law of the Member State in which they are established.- Where the participant provides for the participation of subcontractors, the requirement shall be demonstrated for those subcontractors which according to the type and the cases of the order they are assigned will perform constructionshould provide the required information in Part IV "Selection Criteria", Section A "Eligibility", point 1 of the EEDOP, indicating data on the entry of the participant in the relevant professional register in the Member State where he is established, with an exact reference of the document, incl. number, date and scope, indicating whether the relevant documents are available in electronic format as well as the web-address, authority or service issuing the registration document. In order to prove the above requirements, the participants submit before the conclusion of a public procurement contract, according to Art. 67, para. 6 of the Public Procurement Act or upon request in the course of the procedure, according to Art. 67, para. 5 of the Public Procurement Act: The participant certified copy of a valid certificate for registration in the CPSP for execution of Group I constructions, third categoryforest constructions and for sites - constructions under Art. 137, para. (1) (4) (f) of the Spatial Development Act and a coupon or an equivalent document for non-residents proving registration in a similar register under the law of the Member State in which they are established and having the power of entry in the Central Professional Register builder register for the scope of the activities for which-has been issued. The participant must have achieved a minimum total turnover in the scope of the construction contract for the last three financial years ended (2014, 2015 and 2016) depending on the date on which the participant was established or started the activity to the amount of the estimated value of the procurement. When using a subcontractor, the turnover requirements are-also apply to each of the subcontractors, depending on the type and proportion of the contract they will perform. The participant should provide the required information in Part IV "Selection Criteria", Section B, "Economic and Financial Situation", item 2a of EEDOP. 2. The participant should have valid professional liability insurance, in accordance with Article 171 of the TDA, with a minimum liability limit in accordance with Art.-5, para. 2, item 3 of the Ordinance on the terms and conditions for compulsory insurance in the design and construction or an equivalent document for the foreign persons, according to the legislation of the state in which they are established, with coverage corresponding to the object of the procurement, deriving from a normative act, the subject of the contract is the third category of construction.) When the participant envisages participationsubcontractors the requirement is demonstrated for those subcontractors who, depending on the type and proportion of the contract they are awarded, will execute works. The participant should provide the required information in Part IV "Selection Criteria", Section B, "Economic and Financial Condition "point 5 of the EEDOP. 101, para. 11 of the PPL related persons can not be independent participants in the Prothe contracting authority, including as a participant in a grouping. The assignor removes from participation in a public procurement procedure a participant for whom one of the circumstances referred to in Art. 54, para. 1 and Art. 55, para. 1 of the Public Procurement Act and when the same is a company registered in preferential tax jurisdictions and the persons controlled by them-prohibits directly and / or indirectly participation in PPL procedures, including through a civil society / consortium in which a company registered in a preferential tax jurisdiction is involved, except for the exceptions provided in Art. 4 For the demonstration of the above-mentioned requirements for technical and professional opportunities, the participants submit before the conclusion of a contract-for public procurement, according to art. 67, para. 6 of the Public Procurement Act or upon request in the course of the procedure, according to Art. 67, para. 5 of the PPL: 1. List of completed construction, together with evidence (proving the information in EEDOP) about the completed construction - certificates issued by the beneficiary or by another competent body regarding the construction, which contain the value, the date on which it is-has completed the performance, location, type and volume, and whether it has been performed in accordance with the regulatory requirements; A list of key experts indicating the professional competence of the persons; A certified copy of a valid ISO / EMAS 14001: 2015 environmental management system certificate or equivalent covering the scope of construction orand the equivalent or other evidence of equivalent quality assurance measures. The certificate must be valid and issued by independent persons accredited to the relevant European standards series by the Bulgarian Accreditation Service Executive Agency or by another national authority accreditation that is party to the Multilateral Agreement on Mutual Recognition of the Eurothe accreditation organization for the relevant field or meet the requirements for recognition under Art. 5a, para. 2 of the Law on National Accreditation of Conformity Assessment Bodies. The Contracting Authority shall accept equivalent certificates issued by bodies established in other Member States. Where the participant did not have access to such a certificate or was unable to obtain it-in due time for reasons beyond his control, he may provide other evidence of equivalent information system management measures. In these cases, the participant must be able to prove that the proposed measures are equivalent to the required. Before signing the contract, the participant shall also present up-to-date documents to prove the lack of elimination-according to Art. 58 of the Public Procurement Act, if the circumstances are not available through a public free register or the access to them is not provided to Vidin Municipality by official means Note: The documents shall be submitted to the subcontractors and to the third parties, if any. Internet address (URL): www.vidin.bg Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Building alteration work was 22 Jan 2018. Bidding is closed.
This tender has been issued by ОБЩИНА ВИДИН in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45262700 - Building alteration work, 45212300 - Construction work for art and cultural buildings.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 19148249. The purchaser document reference is 499570-2017.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.