Object of the contractBoiler installations
Description: Contract notice: Boiler installations
Authority Type: Utilities entity
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 42160000, 42160000, 51135000, 45262630, 45251200, 45262700, 45231220, 71245000, 42160000, 51135000, 45262630, 45251200, 45262700, 45231220, 71245000
CPV Description: Boiler installations.
Installation services of furnaces.
Construction of furnaces.
Heating plant construction work.
Building alteration work.
Construction work for gas pipelines.
Approval plans, working drawings and specifications.
Szedreskerti Fűtőműbe 2 db 4, 7-5, 4 MW-os kondenzacios gazkazan beszerzese, telepitese, a telepiteshez szuekseges epiteszeti munkakkal
Szedreskerti Fűtőműbe 2 db 4, 7-5, 4-Procurement and installation of a MW condensing gas boiler, with installation works for the planters.
Main Site: 8000 Szekesfehervar, Szedreskerti ln. 1. In the Sresreskerti Heating Plant, the procurement and installation of two 4, 7-5, 4 MW condensing gas boilers in the district heating plant, the boiler plant, electric and iranyitastechnical fitting, and the funeral works of the plantmixed elements. The following are the main functions of the water supply system (AT):
- the performance of the boilers: by kueloen-kueloen, kondensacios fuestgaz-hőhasznosito nelkuel: 4, 7 -5, 4MW; Formation: large-water, three-dimensional, one langcsoeves; equipment: foe(gas, ventilator) and safety equipment; standard range: min.1: 5.; permissive pressure sensor: 13 bar,
- condensing heat utilization min. (50 - C return flow temperature drop): 280-360 kW,
- entering the boilerwater heat exchangers with insulators,
- air conditioners: frequency,
- iranyitastechnika: with the possibility of standard connection, the existing autonomous system must be integral with the process flow, - the iranian-mechanical integration of the boilers with the existing pipeline .be,
- the boiling pots of the boiler, the boiling test, the booms,
- the boilers of boiler- the boilers must be connected to the plumbing connection point (thermo-ventilators, gazebo systems), - the boilers must be connected to the boiler,
- 1 cooperacios uezemre alk. frequency-switched circulating pump beep,
at any time-(6 pieces),
- delivery of the sandwich panel section, reversing (planned3x6m),
- ventilation,
- drying up the noise,
- shutters are closed,
- tegla falszerk.potlasa, impregnation,
- regi heating ceiling ventilator ventilator arrow locks, arrow insulator,
- disconnected any(if it qualifies as a waste), it will run away, if it is necessary to have a de-deposit, if it is suitable for the first time. depositing, disposing, unmanageable, hazardous waste,
- runway hoisting section. KIEP. (2botted cable: 4 * 240 mm2 aluminum), a free-flow discharge valve AT is subjected to a heat exchanger-
- the new boilers have to be replaced by new electric boilers, - new power and automatic gearboxes, - boilers with self-control (boiler controls, safety engineering, standard elements),
- circulation pump, flow regulation of heat, pressure. power take-off from scratch,
- defensive safety guards must be fite-mail:
[email protected]. planned upholstery,
- constructed damaged structures, floor restoration.
AT is responsible for the designs. felnelvizsg., ill. specially equipped, electric, iranyitaste technique, delivery, delivery, locally installed, put in place, tests, calibrations, handling eyeoctatas.
A compilation of the subject matter of the artwork, rebuilding, epithetical authorizations. I have to wear a six-pocket and a dummy to wear AT.
The author's full accomplishments are a 14-day successful uesem probe for the full rs and the six-pronged probauezem's emerging defects, as well as KD-resold licensors, (AKA), the AKD is a member of the AFA team, which is equivalent to 10% of the corresponding framework (constraint frame), which has the strict rules of the KD.
In this procedure, there is no time scheduler, you should not be able to claim to be a legitimate economic operator against whom the Kbt. Article 62 (1) and (2)• Certified mod:
Providers of the time-consuming and eligible economic operator are justified in justificatory and justificative reasons in the justifications of the jury, as well as the terms and conditions of the technical justification for the breach of contract. (X.30.) Government Decree 1-16. It must be certified that the application does not fall under the Kb. Section 62 (1) and (2)• Provide a timely and verifiable economic operator with a list of 321/2015. (X.30.) Government Decree II. in accordance with the chapters of this Article, you must certify in advance that you are not a party to the Kbt. Article 62 (1) and (2) of the Constitution.
In the case of a Koezoes time-lapse, You must submit a statement to the prospectus that you will not be required to complete the contract with the contractor. 62 of the Code of Criminal Procedure. In the case of a subcontractor who is eligible to receive a certificate, the applicant shall comply with the Kbt. Section 67 (4) of the Tender Declaration. (4) to (7) of Subsection (69) of Act No. 321/2015 on the grounds of exclusionary grounds and the suitability of evidence of suitability for experimental purposes. (X.30.) Government Decree III. It must be sufficient to justify the chapters that it does not fall within the scope of exclusionary reasons. Section 74-(1) (b) excludes the economic operator from whom the exclusion of the former has occurred. The Kbt. (B) and (f) of Article 62 (1) (b) and (f) of this Article, no other party to the exclusion of the other party to the contract shall be obliged to enter into a contractual arrangement, provided that the KoezbeszerzeHatosag, according to Article 188 (4) of the Constitution of the Republic of Croatia, or in the case of a resident of the United Kingdom, has the final legal force in accordance with Article 188 (5) of the Civil Code that the relevant economic operator has entered into agreements the creditor of the exclusionary reason is sufficient to justify the credibility. It's the final oneat the same time, the economic operator is tested at the same time as the one-off European bidding document. [PPA. Section 64 (1) - (2)].
The tenderer shall apply the above mentioned Code. Article 69 (11). In the case of a current registrar, in the case of an alternate registrar, the date on which the written notice is filed and the date on which it is filedfor which he has verified the cegbirosag altal. If there is no progress report, a non-content statement should be attached to the timeline. For the time-consuming (timely) users, the following documents must be attached to the prospectus of the host and pensioner:
P.1. a 321/2015. (X.30.) Korm. (Hereinafter referred to as "Cr.") Section 19 (1) c(3), which was closed at the end of the trading day, and the same period of time (3 MW outperformance, the installation and installation of gas - based heat production equipment site worka) a solicitor of a civil servant who has been sentenced to death in the case of a letter or a letter of intent when he or she has begun to act when these data are available
If the data subject does not have the required document because he is in a legal form, in which regard the declaration of arbitration is not possible, it is advisable to have the righteous person in the form of a legal form in respect of whom it is not possible to make a statement of the matter on the arbevetel, and to make available the appropriate modality and proof of modalities for those points, the timelataban in the 2nd century BC. in accordance with the chapters of this Article, you must certify in advance that you are in compliance with the minimum qualifying allowance specified in the license. Provider is based on Section 2 (5) of the Cr. shall be accepted by the distinguished economic operator as a simple statement• If the provider agrees to meet the requirements of a suitable body or body, (7) to (8) and (11) of Section 65, and in addition to the individual qualifications organization (s) or person (s) in the single European bidding document, (7) of the Code of Conduct.
According to the time-consuming operators, it is only sufficient to provide a proof of validity of the relevant suitability for the given occupational benefit. proof is given. Article 69 (4) - (7) of the Constitution a-for the exclusionary reasons and for the proofs of probationary claims, It must be appropriate to demonstrate that it complies with the appropriate test procedure, which is limited to the time period.
1. In the case of the Koezbeszerzesi (KD) documents, the lowest one AT or the sub-alozone named in the above schedule must electronically-As defined in point I.3 above, until the expiry of the time limit. The KD record point (point I.3) must be verified with a data sheet that has been masked by the e-mail address
[email protected]. The points of reference given in point II.2.5 are based on adhato points: 1 to 10 points. Sub-criteria of the Ar: 1.1.Executive Net Loans (Optional Loads in Tables) /60.1.2. Optional tetrahedron(net HUF) /5, Modike:3.1-3.2.in the case of points of view, a straightforward golden content, sub-aspects are drawn. you have to confirm the acknowledged power to AT. AK is listed in Annex III.1.2, III.1.3., In the official list of Qualified Listers. It established a more rigorous point-the appropriate test.
4. The offer shall be submitted in 1 original copy of paper and the date of scanning of 1 pcs of electronic scrap metal screeds, in which there are 2 pieces of 4.7-5.4 MW Procurement and installation of condensing gas boiler "" Do not open up to the deadline until the deadline ".a respectable form of experiment is held by the KD.
5. The application must be accompanied by the Kbt. Section 66 para. (5), including the KD Breach of the Reading Room, and the original AT statement concerning Section 66 para. (2). AT must declare the following: Section 66 (4) and (6)., and in the case of eligible economic operators, giving the information provided in Section 65 (7). negativearrow. also attached.
7. Attached to this date is the unreasonable coat of arms of KD. The time span should apply to the full score.
8. The CA examined the security of the time sheet with regard to Section 61 (4) of the Kbt. The examination was found to be preconditioned for the fact that the deadline is not objective even for the purchasers to purchase andtaking into account the coercer and the organic relation of tasks.
9. AK can be set in point III.1.7. the advance payment is to be executed in accordance with the pre-paid advance payment repayment allowance corresponding to the required advance, according to the AT, as per Section 13.3 of the Kbt. (a) of this Article.In the time period, the advance payment repaymentyou will not be able to do so.
10. The date must be enclosed with the date of departure of the person (s) under the umbrella of the person (s) or of the 2006 Vtv.9 (3)., respectively. in the case of a mandate.
11. The FAKSZ in the jargon in this jargon: dr. Ed. Balogh, filed under: 00119.
12. The CA is familiar with the full places and with a good time scheduleYou can place a nursery place. Date: 2018.05.03.11: 00th Location of your workshop: 8000 Szekesfehervar, Szedreskerti ln. 1. In case of an accident with AK scrambling you will have the chance to give you the chance on working days 8 12 o the tried, pre-checked basis (details in KD). AT must provide technical information on pre-recorded, incubatorshe has to present a detailed and detailed presentation on the delivery of escutcheons, in the form of a letter, in a placement, in a souvenir design, by giving permission to do so. emerging, the tasks that are to be taken into consideration in the time schedule are rescheduled. [read more: KD]
14. AT is in charge of declaring that, in the case of his winner, his contractthe minimum liability of $ 100 million will be extended to cover any liability arising out of or in the event of a conflict of interest. Section AK 75 of the Kbt. e) does not apply
Internet address (URL): http://www.szepho.hu
Directive: Classical Directive (2014/25/EU)