Contract notice: Assembly of metal structures Tender - 34678240
Tender notice from Romania, published on 15 Jul 2019.
Executive Summary
The INSTITUTUL NA?IONAL DE CERCETARE-DEZVOLTARE PENTRU FIZIC? ?I INGINERIE NUCLEAR? „HORIA HULUBEI” has issued a Tender notice for the procurement of a Contract notice: Assembly of metal structures in the Romania. This Tender notice was published on 15 Jul 2019 and is scheduled to close on 02 Sep 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 34678240, while the tender notice number is 328916-2019 and Register on the platform.
Object of the contract Assembly of metal structures Description: Contract notice: Assembly of metal structures Authority Type: Other Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: Lowest price CPV code: 45223100, 71327000, 45223100, 71327000 CPV Description: ELI / AP / P / 04.07.2019 The contracting authority wishes to acquire the support and screens for the ELI-NP. particle diagnostics at ELI-NP, in accordance with the minimum requirements of the specification. Main Site: IFIN-HH, Str. Reactor no. 30, Magurele, IIn the ELI-NP high-power laser experiments conducted in the experimental area E1-E6, a series of diagnostics will be used to characterize the radiation spectra emitted by the laser-target interaction. For the detection and characterization of proton spectra and accelerated heavy ionization experiments with high power lasers, devices such as spectrometersthe Thomson Parabola, RCF films, and RCF and Attenuator Multiple Film Stacks (stacks). In the case of Thomson Parables, we need supporters with adjustable heights to be used in various experimental configurations and areas large enough to support all the elements of such devices (magnetic dipole, electrostatic deflector, drift area, detection area. For RCF and Attenuator stacks, dedicated supports have been designed to allow four stacks (multi-shot) to be opened at a single opening of the camera, and the use of stacks with totally different thicknesses depending on In the interaction of high-power laser pulses (10 PW) with solid targets the theoretical predictions indicate a convemore than 30% of laser energy in gamma radiation through the radiation reaction process with photon multiplicities of up to 1, 014 / pulse and generation time comparable to laser pulse duration: 30 fs. Spectral gamma spectrometers to be used in such experiments are based on the detection of Compton electrons scattered in the zero-degree direction by photon interaction with athe gamma-electron conversion target placed at the spectrometer input. In the same type of experiments, spectrometers for the prompt detection of electron-positron pairs will be used to extract their dN / dE characteristic up to 100 MeV. The thicknesses of the shields of these spectrometers have been established following the simulations made with the GEANT4 package and havest dimen • The sole tenderer / associated offeror / subcontractor / third party must prove that they do not comply with the provisions of art. 164, 165, 167 of Law no. 98 / 2016. In this respect, the sole bidder / associated offeror / subcontractor / third party will complete the DUAE Part "Exclusion Reasons". The Bidder ranked first in the interim ranking made at the completion of the evaluationof the tenders, shall submit, at the request of the contracting authority, the following editorial documents proving / confirming non-compliance with the situations stipulated in art. 164, 165, 167 above, both for the sole tenderer / associated bidder and for the subcontractor / third party stated in the offer: - the criminal record of the economic operator and the members of the management bodymanagement or supervision of the respective economic operator or of those who have the power to represent, decide or control within him, as it results from the certifying certificate issued by the ONRC / constitutive act, - Romanian legal persons must submit certificate of fiscal attestation regarding the fulfillment of obligations to pay taxes, taxes or contributionsto the general consolidated budget from which the lack of overdue debts at the moment of presenting this certificate will occur, - foreign legal persons will present any editorial documents issued by the authorized institutions of the country of origin (fiscal attestation certificates, criminal records, other equivalent documents etc .) to prove that he has fulfilled his obligationto pay taxes, duties or contributions to the general consolidated budget in accordance with the national law of the country of residence of the sole vendor / associated offeror / subcontractor / third party or the country in which the sole tenderer / associated offeror / subcontractor / supportive third party It is set. From the enlightened documents presented there must be a lack of datathe remaining ones at the time of their presentation, - certificates / records / editorial documents proving / confirming the non-compliance with the situations stipulated in art. 167 par. (1), both for the sole tenderer / associated bidder and for the supporter / third party named in the tender (if applicable), - supporting documents demonstrating that the sole tenderer /associate, as well as for the subcontractor / third party declared in the offer, falls within the provisions of art. 166 par. (2), art. 167 par. (2), art. 171 of Law no. 98/2016 on public procurement with subsequent amendments and completions (if applicable), - other editorial documents, as the case may be. The sole bidder / the tenderer / the subcontractor / the supporting party must not be registeredin the situations provided for in art. 59-60 of the Law no. 98/2016. The decision-makers within the contracting authority are: - Nicolae-Victor Zamfir General Manager, - Mitică Dragusin Nuclear Safety Director, - Constantin Ivan Technical and Administrative Manager, - Ion Alexandru Popescu Economic Director, - Ionel Andrei Director Quality Control ELI-NP, - Raluca Iuliana Stoicea Chief of the Legal and Human Resources Department, - Calin Alexandru Ur Technical Director ELI-NP, - Ruxandra-Oana Moraru Legal Advisor, - Daniela Moraru Legal Advisor, - Dana Cristina Verdeş Legal Advisor, - Daniel-Catalin Stoica Legal Advisor, - Ioan Adrian Muresan Economist, - Corina Lungu Public Procurement Officer, - Ecaterina Gingu-Imparatul Achiziti Referenti Public, - Alina Daniela Mureşan Public Procurement Officer, - Dan Stutman Chief of RA3, - Florin Rotaru Scientific Researcher RA3. Special Warnings 1) Not meeting the DUAE with the offer (including for associate / third party supporter) draws its rejection as unacceptable; 2) the following documents will be filed with the DUAE: commitment [...]details on www.e-licitatie.ro The economic operators will also take into consideration the information presented in the document "Instructions for bidders" attached to the attached "Documents" section of the SEAP awarding documentation. Internet address (URL): www.eli-np.ro
The bid deadline for Contract notice: Assembly of metal structures was 02 Sep 2019. Bidding is closed.
This tender has been issued by INSTITUTUL NA?IONAL DE CERCETARE-DEZVOLTARE PENTRU FIZIC? ?I INGINERIE NUCLEAR? „HORIA HULUBEI” in Romania.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45223100 - Assembly of metal structures, 71327000 - Load-bearing structure design services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 34678240. The purchaser document reference is 328916-2019.