BALATONI HALGAZDÁLKODÁSI NONPROFIT ZRT. has floated a tender for Contract notice: Artificial grass. The project location is Hungary and the tender is closing on 15 Jan 2020. The tender notice number is 577937-2019, while the TOT Ref Number is 38693520. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Artificial grass

Deadline : 15 Jan 2020

Other Information

Notice Type : Tender

TOT Ref.No.: 38693520

Document Ref. No. : 577937-2019

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : BALATONI HALGAZDÁLKODÁSI NONPROFIT ZRT.
Office Name: Balatoni Halgazdálkodási Nonprofit Zrt.
Address: Horgony utca 1.
Town: Siófok
Postal Code: 8600
Contact Point: Fodor Ferenc haltermelési igazgató

Phone: +36 84519630
Fax: +36 84519630
Hungary
Email :fodorferenc@balatonihal.hu
URL :http://www.balatonihal.hu

Tender Details

Object of the contract
Artificial grass

Description: Contract notice: Artificial grass

Authority Type: Other
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 39293300, 39293300, 39540000, 44531510, 44112120, 44142000, 44316400, 39293300, 39540000, 44531510, 44112120, 44142000, 44316400
CPV Description: Artificial grass.

Miscellaneous cordage, rope, twine and netting.

Bolts and screws.

Profile sections.

Frames...

Hardware. for the supply of raw materials for the Balaton Fishery Farm Nonprofit Co. Ltd. GINOP-2.3.2-15-2016-00004 identification numberBasal Fishery Resource Fundamentals for Sustainable Feasibility of Fish Fauna Reconstruction and Experimental Database Utilization in Research with Basic Applied Research Methods

Main Site: 8638 Balatonlelle, Irmapuszta

- 80 cm in diameterDog Shaped Aluminum Frame Welded Perforated Plate with Hook: 2 285 pcs

- Artificial Grass (PP, 5-6 cm strip length coesoet): 4, 570 m

- 12 mm diameter coershoe PE PE: 6, 855 meter

- Coating wire (Al or Fe): 4, 570 meters

- 20 cm long plastic quick tester: 22, 850 pieces

- 200 l plastic barrel: 20 pieces

- extra thick (anchor) lanc: 20 meter

- large shallow (for anchor): 100 pieces

AjanIt is mandatory for all licensed rooms to comply with the applicable legal requirements and industry standards. on somethingt the indication of the place of origin is also required in the declaration. (X. 30.) on the basis of the product or origin specified in the technical description (unpaid coil heating table) or the specific procedure which characterizes the products of the given economic operator or the services provided under it, or trademark, patent, youin the case of reference to weight, person, type, or a particular pedigree or production process, the term "or equivalent" must be understood in addition to the reference, that is, any term equivalent to the indicated product or type is accepted.



The equivalence of the timekeeperit must be justified by any appropriate means. Any suitable instrument may be a technical documentation, a statement, a certificate, or a technical documentation or statement from an independent professionally recognized accredited certification / inspection body. Any doubts about the particular elements of the quotation should be fully passed on to the proposer.it must provide clear and verifiable evidence that substantiates its submissions., against whom Kbt. Article 62 (1), furthermore, one of the grounds for exclusion listed in paragraph (2) above shall apply. (a) (b)).

Certification modality:

In the procurement procedures, the eligibility and exclusion reasons are justified, and Specification for Co-Procurement Technical Modification 321/2015. (X. 30.) Korm. According to Masodik Resze, in the course of co-procurement procedures, when submitting an offer, Government Decree II. The chapters are appropriately, the Single European Koezbaerzesi You must pre-certify that you do not belong to Kbt. Article 62 (1) (a) to (q) and further paragraph (2) (a) to (b) are subject to the exclusion criteria. Pursuant to Article 69 (4) to (7) of the Kbt. The exclusions listed in - 62 (1) (2) do not apply aboveArticles 1-8 of the Government Decree. -- 8 (i) (ib) and 10 (10) (g) (gb) and Articles 12-16.

The tenderer shall only be able to submit the Single European Co-Procurement Document for the subcontractor or capacity-providing organization / person to whom the certificate of suitability is based. Article 62 (1) (2) excludes

In the Single European Cooperative Procurement Document (EEKD), the economic operator (the proposer, where appropriate, the person / entity providing the capacities) declares that the grounds for exclusion are not overridden by him, giving him a preference for garden information. The statement must include a statement that the Kbt. Section 69 (4)and which body is entitled to submit the certificate to be submitted, as well as the Kbt. - 69 (11) of the Database requires the use of data and a statement in case of need. The clarification provided for in - 64.

Provides for compliance with the provisions of the Kbt. Declaration pursuant to - 67 (4).

For exclusion reasonsFor this purpose, certificates created prior to the commencement of co-procurement may be retrieved (used) for as long as the contents of the certificates and data contained therein are correct. Unless proven otherwise, the accuracy of the data is claimed by the tenderer in his statement to that effect.from an actor submitted electronically by the same actor in the prior ECA of the co-procuring entity. In this case, the economic operator declares which of the certificates submitted in the previous procedure are to be taken into account. The power of time fueggetlenuel examines the fact that it has been submitted earlierdoes the certificate comply with the content requirements for the certificate to be submitted in the given procurement procedure, that the previous certificate, if applicable, indicates which co-purchase agreement was applicable to the applicable celebrity. Subject to the provisions of - 65 (2), it does not prescribe penzuegyi and economic eligibility conditions.III.2.2) Conditions for fulfilling the contract:

Delivery of the products defined in this procurement contract GINOP-2.3.2-15-2016-00004 Identification number of the Fishery Code for Fishermen of Balaton and applied research methods "within the framework of the Projectthey are realized within a framework of support. The Project must maintain this registration number and item in the invoice.

You are entitled to set up 1 invoice for sale. refers to Kbt. Article 135 (1) and (6)

No advance payment.

Jotallas not required to pay.

The terms and conditions relating to the contract performance, the payment coetter terms and conditions are included in the contract with the data forwarder. Ah the Kbt. - 40 (1) es - 41 (3) para. on the basis of the procedural rules of the ECF, on the rules of ECR 424/2017. (XII. 19.) Government Decree (hereinafter: e-Cr.).

2nd He is the owner of the co-purchasing documents. it is provided free of charge by the donors, which is made electronically accessible via the ECS when the procedure is initiated. If a model of the declaration is available in the language of the declaration form in the electronic form in the EQF, the declaration must be made by the other person in the electronic form. Timeline vaall corpuscles (such as minutes, notes, notes, answers, answers, etc.) are cross-referenced in the ECR by a list of reviewers. The Kbt. With regard to Section 56 para. The kBenchmarking is looking for the key to finding the equipment you need, but you must respond at least six days before the end of the bidding deadline. The detailed formal testimonials of the offer should be included in the contract documents. The offer e-Kr. Subject to the provisions of - 15, it shall be submitted electronically. The time limit for the offer has expiredyou must electronically check in by that time. The EKR will confirm the date of installation. The time limit for the submission of the quotation by the time limit for the submission of the quotation, as well as the inclusion of the quotation into the improper place of the quotation, is not the responsibility of the proposer. Documents to be attached to the offer or to be submitted electronicallyinclude the co-purchasing documents.

7. The resolution of the documents containing the quotations is started by the EKF, which starts to drop by two hours later. The resolution of electronically submitted quotations is done by the ECR in such a way that the quotations at the time of opening are accessible to the Time Force. In the case of electronically submitted quotation, Kbt. 68. - (4) - (5) bStarting with the opening date, the ECF will make the data available electronically - with the content as it appears in the quote - available to the contributors' file. Timeline for hianyok potlasat is Kbt. 71 of the Act. The power of recommendation makes it advisable for Kbt. Article 71 para. (6) is based on an economic entity not previously mentioned in the proposalordering a hianypotlas in the process of going with the hianypotlas

9. Bidding does not apply Kb. Section 75 (2) (e). The timelessness could be a failure to disclose Kbt. In the cases referred to in Article 75 (2), even if the defect of the EKR is the result of a legal succession which is not in the manner provided for in the Kbt.be remedied.

10th Bidding calls on the attention of bidders to exclude from bidding a bidder who offers a slander of reason that does not require a national banana. Designated accredited co-purchasing specialist consultant responsible for co-procurement: Dr. Schablauer Peter FAKSZ (00182)

12. To use the ECR (https://ekr.gov.hu), the e-Kr.Article 6 requires registration. The operation and maintenance of the EKR shall be governed by Act No 27/2017. (XI. 6.) MvM on the basis of the NEKSZT National Electronic Coexistence Service and Tanacsado Ltd. (http://nekszt.hu)

14. The technical-professional app. Terms and Certification of Qualified Proposers' Notes is more strictly enforced.

II.2.14) Proceed to the next point: "Single netto offer price "is based on At, a company-wide, low-priced offer.


Internet address (URL): http://www.balatonihal.hu

Documents

 Tender Notice