Expired Tender Hungary ICB TOT Ref. 25988972

Contract notice: Architectural design services Tender - 25988972

Tender notice from Hungary, published on 20 Aug 2018.

Exeutive Summary

The ÉSZAKERD? ERD?GAZDASÁGI ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG has issued a Tender notice for the procurement of a Contract notice: Architectural design services in the Hungary. This Tender notice was published on 20 Aug 2018 and is scheduled to close on 18 Sep 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 25988972, while the tender notice number is 362362-2018 and Register on the platform.

Key facts

Summary
Contract notice: Architectural design services
TOT Ref. No.
25988972
Document Ref. No.
362362-2018
Country
Hungary
Notice type
Tender
Competition
ICB
Publication date
20 Aug 2018
Bid deadline
18 Sep 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Architectural design services
Description: Contract notice: Architectural design services
Authority Type: Other
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 71220000, 71220000, 71320000, 71220000, 71320000
CPV Description: Architectural design services
Engineering design services
Reference number: EKR000450632018
Lillafueredi Allami Forest Rail (hereinafter referred to as: LAEV) developer project (hereinafter referred to as "Project") for the design and construction of architectural projects Site: LAEV vasuta palyahalozata es a hozza tartozo-providing infrastructure.
Lillafueredi Allami Erdei Vasut is developing a project for the construction of a project that is designed and planned for the design and construction of the project. The detailed technical requirements are included in the Supplemental Case Study Documents.
The design task will be further extended to the finishing touchesand the design of the base of the plans, and the realization of the design of the project. The design fault can be traced due to possible problems or problems due to the fault of the designer in the case of overcrowding problems, plan explanation, and local conciliation during which-it is not a design supervisor, to the fault-free and undisturbed closure of the technician's technical approach. A design tester will be able to complete the probationary tests that may be incurred in the warranty, as well as the design errors given by the plan, as well as the completion of the completed technical assistance. The project's validation passwordThe deadline k including workmanship is December 31, 2020 Design
koeteles the installation Part koezbeszerzes for the preparation and consideration of professional szakertelemben koezbeszerzes 1 This major biralobizottsagi member delegate.
1. Vasuti palya reconstruction and track corrections (Miskolc-Dorottya Street 330, Papirgyar Lillafuered Garadna main line and p.333 Papirgyar Mahgeo-technical geothermal design of the Alepitmeny
- Geodetic design of the trajectory and geodesic design of the plan, - design of the layout of the railway line
- design of the route corrections
- design of an alternative route in the time-frame documented sites
- The vona(2). (2) For the purpose of re-utilization of quantities for re-utilization of sub-assemblies (eg, lithium-alloys). Planning tasks for high-profile works
- Establishment of a Garadna vegallomas leisure park (landscaping, parking places, terraces, playgrounds, bridges; - extension of the water-block, upgrade of the ramp, access system) - reconstruction of the Diosgyor-Majlath traffic area (reconstruction, development of the water management system, dismantling of the traffic office office and removal of the traffic obstruction office, car repairing hall emaintenance and repair of 2 repair rooms, 6 epuels or epithets)
- Miskolc-Dorottya street building upgrading, upgrading and parking
- Designing the building of the most demanding projectors
The designer is the designer of the pilot project the execution process is at least 5 times worse, as well as the executableonce in a while, and as required to do so, he / she is obliged to complete the cooperaciation concourse on the working lunch.
Continue in VI.4.3.
Kizaro Reasons:
In the case of a co-contracting procedure, there is no time-consuming,, against whom the Kbt. Section 62 (1) and (2) exclude any grounds for exclusionike survive.
The Kbt. Article 74 (1) on the basis of the timeframe, excludes from the commemorative the timer, the subproblem or the suitably accountable organization who is the cause of the exclusionary reasons or the justification for the exclusion of the former. which is probably a verifiable caseslanderer, who is the head of the ESZAKERDŐ Zrt., his principal officer, his / her work, or the person authorized to represent them, or all the persons referred to in the Civil Code. 8: 1st Section 1 (1), paragraph 1, of this Act shall be binding on the interested party or in the case of a resale relationship. Article 64 (1) to (2) of the Law.
Verified Mod: The Excluded Causes-there is no pool at 321/2015. (X.30.) Korm. Decree of the Ministry of Economy and Transport on the basis of the provisions of Section 8 Section 10 Section 12 - Subsection 16. - Article 67 (1) based on the fact that the prospectus is advised to submit a declaration contained in the EEKD document in the case of non-payment of exclusionary reasons.
If the provider decides to exempt from the capacity of an organization or a person the appropriate working conditionsto be respected, all of the organizations or persons concerned should be consulted in more detail on the EEKD document. In such a case, the organizations or persons possessing their capacities, as far as the requirements are concerned, only state those which are to be considered justified by the time-maker's request (Decree 321/2015 (X. 30.) Korm.)
In the case of a timely test, each of the test-takers will hear an EEKD document.
The EEKD document is not allowed to cross the EKR system using the pre-printed sample. Yes. According to Article 69 (4) of the EC Treaty, at the communication level, the EDF system is in line with all the declarations electronically according to the EDF-The EEKD document can not be crossed by the EDR system, it is possible to use the pre-printed sample. Yes. According to Article 69 para. (4), at the communication level, the EDR system is to be found, accordingly, all credentials electronically may be crossed out on the EDF system. Section 67 para. (4) is based on all-the submitter must declare in his / her application that he / she will not be required to complete the contract with the contractor. (1) and (2) of Article 62 of the Constitution. The Kbt. (4) of Article 67 (1) shall be placed on the form drawn up in the EDF system. The statement should also be made if the time-consumer does not want to claim a sub-job.
Ajanlayou should also comment on whether or not you are in the process of writing a different entry. In the case of a current version of the filing file, the submitter is required to enclose the filing note filed for the filing of the filing and the certificate filed against the filing of the bond with the bond. - 13]. From the current procedure for registration, noeven with content to declare funny. For the time limit of the registrant's application form, please refer to the form created by the EDF.
Resume to III.1.3) Minimum time frame during which the tenderer must register for the first time. Article 65 (1) (a) - Article 321/2015. (X. 30.) Korm. Rule 19 (1) (a) shall provide all the board memberswith the following content:
- the penchant for the penchant for the promotion of the pennies has led to the same number (s) of pennies (i),
- guided by the Ajanlattevő szamlaja,
- a samlajan from the begging of the felhivas k-relett-t vissza-ll-tani egy even (12 honapon )
beluel was 30 days longer than linebreaking.
Attol fucking that the timer when i drove downthree, or when he started working if these data were available. Under the "queuing" clause, the Ajanlatkero confirms the concept set out in point 25 of Section 2 of the Leverage Act LXV 2009.
Verification: The first paragraph of Section 1 (1) of Government Decree 321/2015 (X. 30.) of Korm.r. in accordance with Chapters II, 321/2015 (X. 30.) Korm.r. II, the one-off European co-procurementit must be verified beforehand that it complies with the applicable test methods specified in the Tender Provider. Promotion Date 321/2015. (X. 30.) Korm.r. Section (5) of Section 2 shall accept the simple statement of the economic operators (the Subscriber shall be obliged to complete Section IV). Paragraphs (4) to (7) of Section 69 of the Law on the(s) with the appropriate amount of time with a fire, in the case of the appropriate test requirements, to give the following statement:
All statements of the custodians of the penitentiary party with the following contents:
- the Penzuegy entertainers' ),
- myota guides the timing console,
- If you have the information you are looking for, then you have to wait for 30 days to quit. - Look at the time when you were on paper or when you started work. The supervisor also examines the paid-up pension fund for the period under review, in which case ma validity certificate may be accepted in the appropriate minima. A timer remembers 321/2015. (X. 30.) Korm.r. Article 19 (7). The bidder refers to the Kbt. (6) to (8) and (11) of Section 65.
P2) Section 321/2015. (X.30.) Government Decree 1 - (1) Article 5 (1) based on the provider (where appropriate the appropriate yokeit must be accompanied by the one-off European Dealership Document, which is sufficient to cover the requirements of Title IV. (X.30) Government Decree on the basis of Section 2 (5) of the Decree No. 321/2015 (X.30.) of the Government of the Republic of Croatia, accepts the simple statement by the distinguished economic operator of the P2 Penzuegy alkaProvisional statement of the petition. (4) to (7) of Subsection (7) of Section 69 of the Act on the Provisions for Appropriateness of Appropriateness Test Claims (if applicable, the Major Trader) (1) (c) of Section 19 (X. 30.) of the Government of the Republic of Hungary shall allow the last resort before the day• Continued after the minimum requirements.
1. In the meantime, it is necessary to identify the resources of the co-purchaser to fulfill the requirements of the prospective subcontractor and the submarines known in the field of these resources. The capability requirements-and the proof of this to the list of qualified timers was more strictly applied to the limitations.
3. In the case of the quantitative aspect (ar) of the co-author of the co-author of the Dean of the Koezbeszerzesi Hattalag (Ertesitő 2016/147, 21.12.2016), in the case of qualifying points, he uses the straight form of gold as the score is divided by 0-10 test subjects .
4th-Timer for 322/2015. (X.30.) Of the Order of the Government of the Republic of Hungary on the basis of the date of the contract at least min. 70 million HUF / year and min. 7 billion forints / carnival motives for designers who are responsible for design activities.
5. The accreditation of the accrediting body is in charge of the co-procurement procedure: Takacs Gyoergy 00393.
6. Apply to a timer-the Kbt. Section 81 (4) to (5) - 7 Tender for the Kbt. (2) (e) of Section 75.
8. Attachment to date: Reading (EDF Form) Kbt. Declaration pursuant to Article 66 (2). Yes. Article 66 (5) of the reader's reading. Yes. Article 66 (6) (a) to (b) (even in the case of a negative one). Yes. Declaration pursuant to Section 134, Subsection (5). Yes.-Section 65 (7) - (8) statement. Alairo person (s) is a member of the Masulati family. A certificate of entry into the Cegbirosag and the certificate of the cegbirosag altal from its handing over. (in that particular case). Koezoes is a slate (if applicable) from time-table and coin-operated.
9. If the timeshare is iras(in the case of the winning bout) with the second best bidder, he will be asked for the contract.
10. Applicants are required to comply with the coercive measures, social and labor law requirements that are applied by the law or by applying the collective agreement and the Kbt. 4. abercrombie, csocial and labor law. The name of the body (s) of the organizations (s) of the organization (s) in which the prospective bidders can obtain the appropriate title is available. (Section 73 (4) to (5))
11. The winners of the test season will be able to make a profit from a business or legal person: a time magazine does not allow. DEALSthe force will hold a local beacle on 29.8.2018 at 10:00 o'clock on the LAEV Miskolc-Dorottya Street (3534 Miskolc, Dorottya utca). The timekeeper is obliged to make a statement regarding the designer's atlanta diary (net in gross oesszeg). The design supervisor is responsible for all the tasks (high and low) in the technical camp-covers.
14th The tenderer is the tenderer of the Kbt. According to Section 71, he / she is able to provide the fullest possible opportunity. The reasons for this are excluded: The tasks are one-man-years, their program-level oessandangolas, the Lillafueredi Allami Forest Railroad atfogo developer, the connected image of one another, the development of the application materials and technology forestthe whole body of the sites will have to do homogeneous technical content plans, so it will not be possible to resell the high-profile project elements with the excellence of the rail and the pipeline.
Internet address (URL): http://www.eszakerdo.hu

Documents

Tender Notice
Login to view

Similar tenders

Tender Country TOT Ref. No. Bid deadline
Bazvm Psz Member Institutions Development-Planning-Top_Pl Hungary 152587120 25 Nov 2026
Planning of the Health Sciences Education Center of Szte Hungary 152584917 07 Dec 2026
Complex Renovation of Municipal Apartments / 2026. Hungary 152582982 23 Nov 2026
Ensuring the Service of Military Equipment (2027-2030) Hungary 152551834 22 Dec 2026
Design and Design Supervision Top_Plusz-1.3.2-23 Hungary 152547962 24 Nov 2026

Hungary Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Architectural design services was 18 Sep 2018. Bidding is closed.

This tender has been issued by ÉSZAKERD? ERD?GAZDASÁGI ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG in Hungary.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 71220000 - Architectural design services, 71320000 - Engineering design services.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 25988972. The purchaser document reference is 362362-2018.

See the Similar Tenders section on this page or browse other tenders from Hungary.

This tender falls under Construction and Real Estate in Hungary. Suppliers in these sectors can track similar Hungary tenders using CPV-based alerts.