Expired Tender Hungary ICB TOT Ref. 22187408

Contract notice: Architectural design services Tender - 22187408

Tender notice from Hungary, published on 05 Apr 2018.

Exeutive Summary

The ÉSZAKERD? ZRT. has issued a Tender notice for the procurement of a Contract notice: Architectural design services in the Hungary. This Tender notice was published on 05 Apr 2018 and is scheduled to close on 14 May 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 22187408, while the tender notice number is 147056-2018 and Register on the platform.

Key facts

Summary
Contract notice: Architectural design services
TOT Ref. No.
22187408
Document Ref. No.
147056-2018
Country
Hungary
Notice type
Tender
Competition
ICB
Publication date
05 Apr 2018
Bid deadline
14 May 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Architectural design services
Description: Contract notice: Architectural design services
Authority Type: Other
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 71220000, 71320000, 71220000, 71320000
CPV Description: Architectural design services
Engineering design services
Lillafueredi Allami Erdei Vasut developer for the design of a project for the design and design of architectural and architectural design projects
The LAEV 760 mm has a narrow striped rail
Main Site: The LAEV railroad pallet and the supply infrastructure
Lillafueredi Allami Erdei Vasut developerthe design of a project for the design and design of the project. The detailed technical requirements are to be found in the accompanying documentation.
The design task will be further extended to the feasibility of the project, and will be followed by a review of the requirements of the co-procurement process, as well as the toein the case of a real-time reset. The design defect may be due to the design error of the plan or due to an error in the design point of view, the design explanation, the location argument, the execution of which is not the case of a design supervisor, to their fault-free and dull-free lockout. A design tester will be able to complete the probationary tests that may be incurred in the warranty, as well as the design errors given by the plan, as well as the completion of the completed technical assistance. The project deadline for the project is also included in the construction project as of 31 December 2020
1. Vasuti pa- the geotechnical extension of the Alepitmeny, the development of a specialist and geotechnical plan, - the tracking and geodetic planning of the projected teruelet create, create a basic plan for your design,
- Make a design for your future design,
- Pressdesign of line corrections,
- Designing alternate route variants,
- Reducing the amount of re-utilization quantities for the subdivision of line items (sinks, switches, sleepers, etc.)
2. Planning tasks for high-profile works
- Establishment of a Garadna vegallomas leisure park (landscaping, parking places, terrainlatharolo fences, playgrounds, patrolling bridges; - extension of the water-block, upgrade of the ramp, access system,
- construction of the Pisturgtelep megallo, - - reconstruction of Diosgyor-Majlath traffic site (terrain, development of water management, traffic office inquiries) Hanging up the phonethe maintenance and upkeep of repair works, maintenance of 2 other small buildings, 6 epuels or epithets of the building),
- Miskolc-Dorottya street building upgrading, upgrading and parking of the parks. the six are related to the content experimental requirements of consent and designalyos legal guardians, kueloenoesen.
- from the rational rules of the epithets of the sixth AIs of the Epithets of the Iron Epistles in Szeged 289/2012. (X. 11.) Gov. Decree, - - on the construction of the building industry, see Decree 191/2009. (IX.15.) Of the Government of the Republic of Hungary on the forest, forestry and forestry of the year 2009. XVII. toerveny,
- from the spring of the year 1996, LIII. toerveny,
- for the European descent of significant importance for the conservation of natural resources, see paras 275/2004. (X. 8.) Gov. Decree,
- on the coefficient of the examination and the use of co-beneficiary grants, (XII.25.) Of the Government of the Republic of Hungary, and -
- on the design and construction of the embossed epithelium in LXVIII of 1997. toerveny. According to him, he must be ignored with the attention ofas well as the design and merchandising services related to the epithets of investment projects. (X. 30.) Korm.
In the case of characterization, continuation in VI.4.3) point 2.
Kizaro reasons:
In the case of a breach of contract, it can not be time-consuming, economic operator against whom the Kbt. The exclusionary reasons set out in section 62 para. (1) and (2) have survived. Article 74 (1) on the basis of the time-maker, excludes from the commemorative the time-maker, the sub-contractor or the suitably accountable organization who is the cause of the exclusionary reasons or the justification for the exclusion of the justifications.it may not be a time-consuming, subtle, and not necessarily validated by any economic operator who is the official, principal officer, or representative of the ESZAKERDŐ Zrt., or any person authorized to represent them, or all of these Articles. 8: 1st (1) (1) of the Civil Code, or in the case of a rescheduling relationship, .
Tender: Tender refers to the Kb. Section 64 (1) to (2) of the Act.
Verification Mod:
The Kbt. Article 67 (1) on the basis of the prospectus provided by the prospective applicant for a preliminary declaration of non-payment of exclusionary grounds, the applicant may submit a statement in the one-off European Case Documentation Document.he would like to comply with the declarations, and every one of the organizations or persons involved should have the opportunity to submit a one-sided European bargaining document in the meantime. In such a case, the organizations or persons possessing their capacities, as far as the requirements are concerned, only state the requirements that the time-(-2) of the Government Decree No. 321/2015 (X. 30.) of the Government of the Republic of Hungary.)
In the event of a Koezoes time limit, each of the members of the Democratic Party shall hear a one-sided European Probationary Document with a probationary record. ) ta 321/2015. (X.30.) Government Decrees 3-7. Of the Act, must be attached on paper basis. If the date is the Kbt. Section 69 (11), it is also necessary to provide these databases with the necessary information in the appropriate sections of the Single European Co-Procurement Document. The time-consumer and if the time-consumer suits the capacity of a body or person of suitable capacity(s) or person (s) must be supported in the one-off European Jobseeker's Document, as well as in the 321/2015. (X.30.) Government Decree III. Which body is entitled to certify according to the chapter. [321/2015. (X.30.) Government Decree - 3 (2)]. Article 69 (4) of the EC Treaty provides for the solicitation of the performanceprior to using the tool, it is possible to find a timely person with the best advantage in terms of professional considerations, with a sufficient amount of time to fire with the help of justifications for exclusionary reasons. You may do so before you can take the roll-up of the do-it-yourself thing, so that you will not only find the best promoter, but also the best friend in the race, -also invokes the testimony of the attorneys.
The exclusionary reasons do not exist in 321/2015. (X.30.) Korm. Decree of the Ministry of Economy and Transport on the basis of the provisions of Section 8 Section 10 Section 12 - Subsection 16. - Section (4) of Article 67 (4) shall declare that he or she fails to apply to the Contractor's Complainant. (1) to (2) of Section 62.
The declaration shall also be filedIf you do not want to take a subpoena for a period of time, you will not be able to take the time to do so.
In the case of a qualification (in the case of a professional activity):
Continued from point III.1.3 in the characterization process. (Minimum applicable requirements).
P1) Subject to the provisions of the Kbt. Section 65, subsection (1) a) of the Act No. 321/2015. (X. 30.) Korm. Of the Government of the Republic of Hungary, Section 19 (1) (a)(s) with the following content:
- the penchant for the pennies of the penitentiary has led the same number (s) to the pennies (i), - - guides the Provider's coffin, - he has been recalled from a solemn assignment even (12 months).
Beluel was 30 days longer than linebreakingIt is a matter of fact that the Provider when it was written on paper or when it started to work when these data were available. Under the "queuing" clause, the Ajanlatkero confirms the concept set out in - 25, - 25 of the Toermany Act LXV 2009.
Verification: The first paragraph of Section 1 (1) of Government Decree 321/2015 (X. 30.) to the Provider in accordance with Chapter II of Government Decree 321/2015 (X. 30.) Korm.r.it shall be required to prove, in advance of the one-off European Case Documentation Document, that it complies with the applicable Test Methods specified in the Tender Denomination. Promotion Date 321/2015. (X. 30.) Korm.r. Section (5) of Section 2 accepts a simple statement by the economic operators (the Subscriber shall be obliged to complete Section IV). Section 69 (4) - (7) aprior to making a final decision on the performance of the jury, the Appointing Agent (s) shall be summoned with the appropriate amount of time with a fire certificate in the form of the following subpoenas: - All the Penzuegyes' k) penzforgalmi jel-lőzama (i),
- myota guides the time-consuming samsam,
samam from the robbery of the invasion of the murmur of a goddess, or even a belgrade of thirty days beyond the queue.
Attol fueggiano that the time-maker when to letter let when he started doing business,
If this information is available to you. Provider for the off-season cash flow during the period under reviewand in this case any evidence that the date of expiration date is justified may be acceptable to the minimum. A timer remembers 321/2015. (X. 30.) Korm.r. Article 19 (7). The bidder refers to the Kbt. (6) to (8) and (11) of Section 65.
P2) Section 321/2015. (X.30.) Government Decree 1 - (1) Article 5 (1) Based onthe applicant (where appropriate, the mas-based operator who has received the appropriate confirmation) must enclose the one-week European bidding document, which is sufficient for the IV. in the light of the fact that pursuant to Section 2 para. (5) of Decree 321/2015 (X.30.) of the Government of the Republic of Croatia the acceptor accepts the exclusion of the beneficial owneralso the prequalification of the appropriate P2 test for a commercial premise of the Penzuegy. (4) to (7) of Subsection (7) of Section 69 of the Act on the Provisions for Appropriateness of Appropriateness Test Claims (if applicable, the Major Trader) (X. 30.) Korm. Of the Government of the Republic of Hungary must
For the characterization, continue with Section III.1.3.
1. In the period of time, it is necessary to indicate the resources of the co-buyer for the fulfillment of the requirements of the subcontractor-and in the light of these respects the familiar works of art in the eyes.
2. The requirements of the qualification and the proof of the certificate of the qualified timers are more strictly laid down in the terms of the time-sheet of the idler III.1.2) P2 and III.1.3) M1 and M2 points. The contract documents are published in the Kbt. Section 57 (2) of the base date for the lowest 1 time-holder or the timecalled sub-alcoin must be abandoned. For those who have time or money, [email protected] must confirm the deadline. If the document entitled "Confirmation" does not match the deadline until the time limit is reached, then the document "Confirmation" must be verified with a prequalified document-ervenytelenseget.
4. In the case of the quantitative aspect (ar) of the co-author of the co-author of the Dean of the Koezbeszerzesi Hadser (Ertesitő 2016/147, 21.12.2016), he applies the straight golden form in the case of qualifying points, in which case the points are 0-10 testes divide.
According to the III.1.3 M / 2nd Specialist experience, the max. can be taken into account.
Ready-to-bee experience 48 hours, max. adhato receives 10 points.
A III.1.3 M / 2. b. according to the expert's experience in the max. can be taken into consideration.
Ready-to-bee experience 48 hours, max. adhato gets 10 points.
5. Timer for 322/2015. (X.30.) Of the Order of the Government of the Republic of Hungary on the basis of the date of the contract at least min. 50 million HUF / year ex-min. 5 millio Ft / karememeny dictated by the designer responsible for design work.
6. The accreditation of the accreditation body is available in the following terms and conditions:
Name: Takacs Gyoergy Registration number: 00393 Telephone number: 36 302748235 E-mail: [email protected] Mailing address: 2120 Dunakeszi, Kossuth Lajos u. 11
7th-The Kbt. According to Section 47 para. (2), the basis on which the co-beneficiary is based, and the Kbt. Article 66 (2) declares that all documents must be filed in plain semi-finals. It is advisable that the Provider must attach to the schedule the specialists who have been involved in the completion must attach their own professional drawings with a handwrittenin order to ensure that a credible and credible form can be achieved by the full set of definite terms of reference on the reader's roles as well. The deadline for the closing of the application is the Kbt. Section 70 (1) and Section 79 (1) - (2) Date of Contract Date Article 131 (6).
10. Tenderer applies the Kbt. Section 81 (4) -(5) - 11. Tender for the Kbt. (2) (e) of Section 75.
12. Attachment: Kbt. Declaration pursuant to Article 66 (2) (original). Yes. Declaration pursuant to Article 66 para. (4). Yes. Article 66 (5) of the reader's reading. Yes. Article 66 (6) (a) to (b). Yes. Declaration pursuant to Section 134, Subsection (5).Yes. Section 65 (7) - (8) statement. Alairo person (s) is a member of the Masulati family. A certificate of entry into the Cegbirosag and the certificate of the cegbirosag altal from its handing over. (in that particular case). Koezoes from time-table and coin-operated (if applicable).
In view of the characterizationlytatas a VI.4.3) in section 4.
Internet address (URL): http://www.eszakerdo.hu
Directive: Classical Directive (2014/24/EU)

Documents

Tender Notice
Login to view

Similar tenders

Tender Country TOT Ref. No. Bid deadline
Bazvm Psz Member Institutions Development-Planning-Top_Pl Hungary 152587120 25 Nov 2026
Planning of the Health Sciences Education Center of Szte Hungary 152584917 07 Dec 2026
Complex Renovation of Municipal Apartments / 2026. Hungary 152582982 23 Nov 2026
Ensuring the Service of Military Equipment (2027-2030) Hungary 152551834 22 Dec 2026
Design and Design Supervision Top_Plusz-1.3.2-23 Hungary 152547962 24 Nov 2026

Hungary Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Architectural design services was 14 May 2018. Bidding is closed.

This tender has been issued by ÉSZAKERD? ZRT. in Hungary.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 71220000 - Architectural design services, 71320000 - Engineering design services.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 22187408. The purchaser document reference is 147056-2018.

See the Similar Tenders section on this page or browse other tenders from Hungary.

This tender falls under Construction and Real Estate in Hungary. Suppliers in these sectors can track similar Hungary tenders using CPV-based alerts.