Expired Tender Finland ICB TOT Ref. 19782390

Contract notice: Architectural, construction Tender - 19782390

Tender notice from Finland, published on 15 Jan 2018.

Exeutive Summary

The HELSINGIN KAUPUNGIN KAUPUNKIYMPÄRISTÖN TOIMIALAN ASUNTOTUOTANTO has issued a Tender notice for the procurement of a Contract notice: Architectural, construction, engineering and inspection services in the Finland. This Tender notice was published on 15 Jan 2018 and is scheduled to close on 19 Feb 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 19782390, while the tender notice number is 016021-2018 and Register on the platform.

Key facts

Summary
Contract notice: Architectural, construction, engineering and inspection services
TOT Ref. No.
19782390
Document Ref. No.
016021-2018
Country
Finland
Notice type
Tender
Competition
ICB
Publication date
15 Jan 2018
Bid deadline
19 Feb 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Architectural, construction, engineering and inspection services
Description: Contract notice: Architectural, construction, engineering and inspection services
Authority Type: Regional or local Agency/Office
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 71000000, 71000000
CPV Description:
Heka Laajasalo Vuorilahti Structural Design Call for Proposals, Renovation
Call for tenders for the construction of a structural plan for a refurbished rental property, as well as for the completion of construction supervision.
Main Site: Helsinki
Description of the factory:
Project structural design and manufacturing time controlin accordance with the scope of the tender dossier. A project plan has been drawn up for the project. The renovation of the buildings must be planned in accordance with the project plan, the customer's objectives and the cost limits set by the subscriber. The object must be designed in such a way that the building costs estimate is estimated by the building cost estimate below the target price calculated from the project plan. Kustannuslaskthe minds are the developer. For a more detailed description of the designers, see the appendices "Design contract for the design and supervision of plant designers" and project plans.
Description of the project:
The renovation site has 17 residential buildings and 2 paeceekoti buildings. Residential buildings are divided into two types: castles and lamellas. The pincushion is a twine 14 and a lamellar typethere are three of them in the apartment blocks. The Finnish lamellar building in Finland is associated with a cobblestone room with a private bunk bed. In Finland, 1 is located a small one-storey residential building built in 1966, which was renovated in 1991 with a flush-mounted concrete. Housing facilities, storage facilities, lightning protection and technical facilities are located on the ground floor of buildingsa and basement layers. In Suomensuontie1 there is a garage, transformer and sauna facilities. There is no elevator in the buildings. Residential buildings are concrete structures. Helmets and overhanging hollow slabs, floorboards with pile-bearing hollow core slabs, part of the concrete concrete slabs. Facades of sandwich elements.
Objectives of the renovation:
- Building and building technical objectives for project plans
- Costs that can be met by the ARA price limits,
- Thanks to the price-quality ratio,
- Easy maintenance of fa-ades, roofs, yards and public spaces,
- Building components and materials for facades and dwellings, standard products, - Improving energy efficiency,
- Enhancing Esteemism.
A more detailed description of the project is presented in the project plans. Hankplans and studies have been saved to the project bank. The designer of the design offer must consult them prior to the bid submission.
Preliminary timetable:
The project is implemented jointly in two stages.
Heka Laajasalo Vuorilahti:
- start of planning April-May 2018.
- plans for completed groove calculation for 1.5.2019,
- start of construction fall 2019,
- construct2022.
The entire renovation work will be completed in 2022.
The planning schedule will be drawn up under the direction of the planner, working with other designers at an early stage of the design.
Designer's choice:
The designer's choice is made on the basis of economical advantage.
Bid:
The design offer is given as a total price. The fee is flat and everythingcosts such as VAT, IT expenses, cost-cutting costs, cost-effective design engineers, and Tailor-made Supervision are the keys to reward.
Quality assessment:
The customer performs a quality evaluation based on the submitted material. In quality evaluation, the reference targets are compared to the basic renovation project. Quality assessment is performed only with the most immeasurable requirements-For tender submissions, please see the enclosed ESPD form. The tenderer must comply with the obligations under the Subscriber Obligations Act (1233/2006) and be adequately cared for by the social obligations. In the tender suitability section, the tenderer is eligible for the ESPD questionnairethe readiness of the terms.
The documents presented in the invitation to tender must be submitted to the tender.
The bidder must be entered in the trade register, in the advance inventory register, in the inventory register and in the Register of Value Added Taxes in accordance with the Act on Value Added Tax, before the contracting entity makes the purchase decision if the participant's placeit is necessary to establish a registration status.
In order to ensure that the company's legal obligations are met, the bidder should be prepared to provide the subscriber with the procurement and procurement law as well as the documents in accordance with the contract notice prior to signing the contract.lowest lasting 14 days before the countdown period. The builder will submit any prospectus to the Project Bank and the Issuers and Answers Newsletter on the Offer Service Portal last 6 days before the auctioning time. Other lisaetoja are not considered binding by the developer
Internet address (URL): http://www.att.hel.fi/
Directive: Classical Directive (2014/24/EU)

Documents

Tender Notice
Login to view

Similar tenders

Finland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Architectural, construction, engineering and inspection services was 19 Feb 2018. Bidding is closed.

This tender has been issued by HELSINGIN KAUPUNGIN KAUPUNKIYMPÄRISTÖN TOIMIALAN ASUNTOTUOTANTO in Finland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 71000000 - Architectural, construction, engineering and inspection services.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 19782390. The purchaser document reference is 016021-2018.

See the Similar Tenders section on this page or browse other tenders from Finland.

This tender falls under Construction and Real Estate in Finland. Suppliers in these sectors can track similar Finland tenders using CPV-based alerts.