Contract notice: Approval plans, working drawings Tender - 34560832
Tender notice from Hungary, published on 10 Jul 2019.
Exeutive Summary
The NIF NEMZETI INFRASTRUKTÚRA FEJLESZT? ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG has issued a Tender notice for the procurement of a Contract notice: Approval plans, working drawings and specifications in the Hungary. This Tender notice was published on 10 Jul 2019 and is scheduled to close on 09 Aug 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 34560832, while the tender notice number is 322174-2019 and Register on the platform.
Key facts
Summary
Contract notice: Approval plans, working drawings and specifications
Object of the contract Approval plans, working drawings and specifications Description: Contract notice: Approval plans, working drawings and specifications Authority Type: Body governed by public law Contact Nature: Services Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 71245000, 71242000, 71243000, 71245000, 71311300, 71312000, 71313000, 71245000, 71242000, 71243000, 71311300, 71312000, 71313000 CPV Description: Approval plans, working drawings and specifications. Project and design preparation, estimation of costs. Draft plans (systems and integration). Infrastructure works consultancy services. Structural engineering consultancy services. Environmental engineering consultancy services. Kecskemet - intermodalis csp. kapcs. tervezes Reference Number : EKR000764872019 Megbizasi szerződes kereteben a Kecskemet County Jogu Varos intermodal hub developer project for pre-project and planning tasks Main Site: AK's current venue (Hungary, 1134 Budapest, Vaci ut 45. Atrium Park Irodahaz "B" episode) Kecskemet intermodal hub juncture, plan-ready tasks: 1st Make your plan documentary work 2. Preliminary Exam Documentation 3.Hatosagi Prefix Basic Sketches for Crossbreeds 4 . Preliminary Documentary Documentation 5. Purchase of Six-Year Allowances (Allowances for Coal Operations) 6. Execution of documentary design documents 7. In case of co-operatives, the draft of the tender-level tender plan is 8 . The design of the design of the designer is 9. Tasteful Elementary Education (RMT) and Co-benefitsAnalytical (CBA) up-to-date bulletin 10. Koezuti's Safety Six Exams Creating a plan for your little boy 12. The design of the Szabalyozasi plan The design space can be found in the ruins of the Košice-East, primarily the Vasutallomas epuelet, which is located on the property and on its undisturbed rooftops, and on functional spaces that functionally link to Vasutallomas.dat soran elaborated technical content: The design task of Kecskemet Intermodal Csomopont must be designed by the Varos New Koezoesseg Transport Coaching Point, which will also be the center of the busy bus station. you need to dismantle bus trainsyou need to design it so you need to create a new stationary for the epoch of the railway station. In addition, a new add-on passenger compartment must be planned. The bus palmaudvar is connected to the pedestrian and parueler, for approx. 200 m passenger sheds are to be built, and the smaller, smaller (oesses about 100 m) "box" is to be designed.tarolasahas 21 pieces and 16 local jatras serviced, six-inch nelkuel can be used for grass-catching meadow-shaped megallohely designed. The roevidtavu busztarolo is designed for the up-to-date fortification. To plan a roevidtavu bus ride, you need to plan a low-floor (20-30m) driver's rest epuel / parish.to plan for the dogut, so the two iranyu felaro paths should be planned in the 80 m long, the Nagykőroesi ut axis. The level of connection between the treadmill and the Bethlen dog will be the developer of the existing Nagykoigorsi street junction, at which level the planning task is at stake. There are also 25 parking lots and 3 pcstaxi parkolo, and in the forests of the round-bodied servas, 200 planks of the park park with a capacity of 200 plots are planned to be planned. to design atepites should be planned. Felueljaro: The project is abouta 150-meter-long roundabout and pedestrian walkway over the 150-meter rail will provide the Hunyadivaros varosresz pedestrian and roundabout connection. The narrowest athidalando is 8 pcs long and 60 meters long. At least 85 meters meter elongated rim of the slats is found in the Vasuti vagany field, with a skeleton structure of the wheelchair.It is designed to be sexy. The recommended cross-sectional width is 7.0 meters, while the length of the lateral part of the artery is approximately 65 meters. at point [Farmer and penzuegyi suit, Suitable for minimumkoevetelmenye (i):] !!! A) Kizaro Causes: It is not possible to have a timer, a subordinate and not to be in the correct case of a real master who is a Kbt. Section 62 (1) - (2) is subject to exclusions. The Kbt. Article 74 (1). In point (b), the timeliness has to elude the reporter, sub-agent, or the appropriate reader.an enrolling organization who or what is the reason for the expulsion has come in. Causes of Kizaro are telling their fashion: 1. Preliminary Certificate Mod: The Kbt for the timer. Section 67 (1) - (2) and Section 1 (1) of the Cr. According to the EECD, it is necessary to prove in advance that there is no reason for the exclusion of the grounds for exclusion. The timer or the appropriate reader is resArticle 4 (1) of the Cr. Kbt. - 62 (1) - (2) excludes grounds for disregard (subject to -- 4 (3) - (4) and 6 (1) - (2) of Kr. as well). In the case of Koezoes, each of the koezoes' timers enters a form. In section 15 of the Cr.and for the organization to apply only the EECD to the expulsion reasons, but not for those who do not take the correct reader in the real time. Article 67 (4). In the case of a pending entry in section 13 of the Cr.i the cegbirosag introduced a variation of the entry frame (all of the resets with a fingernail side) and the chassis beer handler with electronic cegbirosagi certificate. If there is no registration in progress, the corresponding negative statement is attached. 2. True Mod Mod for Dashboard: Kbt. Section 69 (4) - (7) is based on the KizaThe introduction of the reader of the reasons for the causes of the ro roots has been inspired by Article 1 (7), 8, 10, 12-16 of the Cr. - It is not possible to get the proofs if the newsletter is Kbt. According to Article 69 para. (11), non-referral is not mentioned in the relevant regulations, the exclusions databases are true.and the host actor made them viable in EEKD. In this regard, Kbt is still on the rise. Section 69 para. (11a). - 69. (11a): in this case he declares in arrest which earlier truth certificate he has put forward takes into consideration the biralat line.Proofs issued prior to the start of the trial can also be accessed (used) as long as the contents of the documents are true. Until the contrary evidence is provided by the Co, the actual content of the data is denied by the notifier by the relevant declaration. [Cr. Section 1 (7)] B) Prerequisites for Professional and Professional Entries: The Kbt. Section 65 (1). c) based on the meaning of the design service of the epitome firm based on the notion of the official chambers of professional activity, or in case of non-Hungarian economic operators, registered in the country of residence or licensed in the country of establishment or in the country of establishment. Character number due to time constraints III.1.1) continued in III.1.2) Kbt. Section 67 (1) - (2) and Section 1 (1) of the Cr. according to the EECD, it is presented in advance in its schedulemust meet the appropriate condition. Foreword, the exemplary exemplary certificate of the EECD adopts the simple statement of the hosted farm, in the light of the appropriate match. Each of Koezoes' timers enters a form. Foreword to Form IV. no information is provided The Kbt. Article 69 (4) - (7). based on the above, their correspondents are justified by the following: P / 1. Article 19 (1) of the Kr. c) basically have to add the last throw before the final task, the final throw closed with the turn of the beam, and the chips (the planning and licensing tasks associated with the koezuti infrastrura developer)se) it is a simple statement of a low traffic ado nelkuel in the original or masolati peldany, attentive to when the timer dropped, or when he started to work as if these data were in possession. Section 65 (6). According to the one-of-a-kind, the koezoes journalists give you an e-mail. The Kbt. 65 (7) - (8)(11) - (12) and Section 19 (3) and (7) of the Cr. For further information on the mods of the documentary, see the documentary. The documents are up to date with Kbt. With regard to Article 39 para. (1), in the case of an unconscious and complete dog, in accordance with point I.3.it is up to date to update. K is conducting a co-operation in the electronic coexistence system (hereafter: EKR). The basis of the news is the documents published in the EDF. Reports must be posted in the EDF, readable, non-editable in pdf format. At the time of the news, AT should be aware of Kbt. 41 / A. - - (1)Takri. For the use of the EDF, see 424/2017. (XII.19) Corm. (hereinafter referred to as "EKRr.") - 6 registration. Forces Kbt. 41 / A. - (4) the exam on the basis of the statement made by the EWC in the EWC has entered into the right of each representative right. Criticism of the foundation of Koatoska Hatosag utmutatya (Koezbekerzesi Ertesitő 2016/147, 12.12.2016.) Qualitative criteria 1-3. case: straight gold, 4-5. points are awarded with points (yes: 10 points, no points: 0 points), the gold medal in the case of "Ar" is awarded with a score of 0 to 10 in the case of qualifying points 1-3. level 36 years 3./ ev and 25 millio Ft / beard designers are responsible for authorizing the contractor. In case of Koezoes, the responsible person in charge was certified by each chief of the koezoes. The authorship clause stipulates that the winner's subscriber is subject to the III.1.3) M / 2.1.-M / 2.3. and the 4th and 5th qualitative experts266/2013. (VII.11.) And Government Decree 297/2009 (XII.21.), With the lower (or equivalent) vernacular design rights, and the Hungarian Chamber of Commerce notices with such authority: M / 2.1. - "KE-K" entitlement M / 2.2 - "E" entitlement M / 2.3. point - "HT" entitlement Refreshing point II.2.5 4. qualifies as a critical aspecteB: "SZKV 1.1-4. Expert Authorization A Review II.2.5. Clause 5: qualifies as an attorney: "E" entitlement 5. Terms and conditions set out in points III.1.1), III.1.2) and III.1.3) of the Qualified Scholarly Compliance Statement for Qualifying Qualifiers 6with the same assumptions, the same condition assures the wicket opportunity, by ordering the hianypotl with the exception of one time, if the timer enters the hunter who has not previously been on the agenda, and in view of this hunter actor, the other hianypotla would be suicidal. 7th Foreclosure Foreclosure Kbt. 35. (8) projectin the case of both individual and koezoes timekeepers. 8. In this review, the roevidites are the lower ones: Kr. - 321/2015. (X. 30.) Government Decree, EECD - unified european coexistence document, dij-neto regalkozzi dij. Newsletter for Reading Reading and Kbt. Article 66 (2) declarations are introduced. Kobt does not apply Kbt. 75.-Paragraph 2 (e). K would make the Kbt publicly available. Section 75 (2). Point g) is based on 12. The complete list of records is included in the documentation. The Review IV.2.6. the time period specified in point Kbt. Article 81 (11). base 60 days 14. Reasonable Stewards Reaching Stupidity is Not Providing. Professional Documentation in Documentation 8.5.1. point norh. Character number due to time constraint point VI.3) continued at V.4.4) [Appeals of legal remedies] !!! Internet address (URL): http://www.nif.hu
The bid deadline for Contract notice: Approval plans, working drawings and specifications was 09 Aug 2019. Bidding is closed.
This tender has been issued by NIF NEMZETI INFRASTRUKTÚRA FEJLESZT? ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 71245000 - Approval plans, working drawings and specifications, 71242000 - Project and design preparation, estimation of costs, 71243000 - Draft plans (systems and integration), 71311300 - Infrastructure works consultancy services, 71312000 - Structural engineering consultancy services, 71313000 - Environmental engineering consultancy services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 34560832. The purchaser document reference is 322174-2019.