Contract notice: Airport control tower Tender in Poland - 14513986

Tender notice from Poland, published on 01 Jul 2017.

Executive Summary

The LASY PAŃSTWOWE NADLEŚNICTWO KOLUMNA has issued a Tender notice for the procurement of a Contract notice: Airport control tower construction work in the Poland. This Tender notice was published on 01 Jul 2017 and is scheduled to close on 10 Aug 2017, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 14513986, while the tender notice number is 251346-2017 and Register on the platform.

Key facts

Summary
Contract notice: Airport control tower construction work
TOT Ref. No.
14513986
Document Ref. No.
251346-2017
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
01 Jul 2017
Bid deadline
10 Aug 2017
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Airport control tower construction work
Description: Contract notice: Airport control tower construction work
Authority Type: Other
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45213332, 45213332
CPV Description: Design and construction of a perforated reinforced concrete cross-fire tower in the Forest District Column. On top of the observation booth inDepth 46 m n.p.t. +/- 1m with electric, lightning and alarm installation and assembly of 500W photovoltaic or hybrid cells with the possibility of mounting 500W cells.
Main Site: Rydzyny gm. Pabianice parcel number 665 Rydzyna area, Rydzyna forestry
The subject of the order is the design and construction of a perceptible fire tower kMonolithic reinforced concrete structure, made by the sliding method with an observation deck mounted at the top of 46 m high. / - 1m with electrical, lightning and alarm installation and assembly of 500W photovoltaic or hybrid cells, including the possibility of installing additional cells of 500 W.
The subject matter of the order has been described in detail in the functional-The warranty period for the construction is a minimum of 10 years for photovoltaic or hybrid cells of at least 5 years. General construction and civil engineering
45.26.24.20-1 Construction of buildings / 45.25 Other specialized works
45.40.00.00-1- Finishing works in the field of building objects / 45.4 finishing
Characteristic parameters determining the size of the building and the scope of the robot to be carried out:
Location:
Collegium, Rydzyna gm. Pabianice parcel number 665 Rydzyna area, Rydzyna forestry
State of ownership: State Treasury, PGL, State Forests Forest Inspectorate Column.Technical specification: forest land, near the forest road, land without technical armament.
The order includes:
- geological and engineering studies with the geotechnical category of land;
- general design of the object; Decision on building permit
in the number of (5 (five) copies, Drafting of technical specifications for the execution and reception of construction work, - preparation of instructions for the operation of the facility, - preparation of other required documents required by the law To issue a permit for
construction;
- to obtain on behalf of orderingConstruction of the tower, in accordance with the construction project and the conditions for the building permit, - Preparation of the reception documents related to the building being constructed, - Obtaining the decision permitting the use of the object, - - Submitting the object to the contracting authority. Construction, workmanship and equipment must fully comply with applicable laws and regulations in force-To be in harmony with knowledge and construction art.
The whole of the scope of the subject matter covered by the order must be made in a complete way from the point of view of the purpose it is intended to serve. 24. paragraph 1) out of the ordering procedure: 12) the contractor who did not show the fulfillment of conditions for participation in the procedure or was not invited to the negotiation is excluded
13) the contractor being a natural person who has been legally convicted of a crime: a) referred to in art. 165a, art. 181-188, Art. 189a, art. 218-221, Art. 228-230a, art.250a, art. 258 or art. 270-309 of the Law of 6.6.1997 Criminal Code or Art. 46 or Art. 48 of the Act of 25.6.2010 on sport, b) the nature of tError, referred to in art. 115 - 20 of the Act of 6.6.1997 Criminal Code, c) Treasury, d) referred to in Art. 9 or art. 10 of the Act of 15.6.2012 on the consequences of entrusting the performance of work to foreigners who are against the regulations in the territory of the Republic of Poland, 14) the contractor, if the acting member of his management or supervisory body, partner cooperates with the public orA refugee or general partner in a limited partnership or limited partnership or a proxy is fined for the offense referred to in point 13, 15) the contractor, against whom a final court decision or final administrative decision on the payment of taxes, fees or insurance premiums has been issued Social or health, unless the contractor made the payment due underCharges, fees or social or health insurance contributions with interest or fines, or a binding agreement on the repayment of those debts; 16) The contractor who, as a result of the intentional act or gross negligence, misleads the purchaser in providing information that he is not subject to exclusion., Meets the conditions for participation in the proceedings or is objective and indissolubleCriteria, hereinafter referred to as "selection criteria", or who has concealed this information or is unable to provide the required documentation; 17) the contractor who, by reason of recklessness or negligence, has provided misleading information to the contracting authority, which may have a material impact on the decisions taken by the contracting authority. The ordering party in the procurement proceedings; 18) the unlawful contractorHas influenced or attempted to influence the contracting authority's activities or obtain confidential information that could give it an advantage in the procurement proceedings; 19) the contractor who participated in the preparation of the contract award procedure or the employee, and the person performing the work under the contract of engagement, A work, agency or other contract for the provision of services, took part in meditation(20) a contractor who has entered into an agreement with other contractors to distort competition between contractors in the procurement procedure, as opposed to the exclusion of the contractor from participation in the procedure; The contracting authority is able to demonstrate by means of appropriate means to21) contractor who is a collective entity, against which the court has banned the application of public orders under the law of 28.10.2002 on the liability of collective subjects for acts prohibited by the penalty of punishment; 22) the contractor, against which a preventive measure was banned Applying for public orders; 23) executives who belong to the same capitol group;As in the meaning of the Competition and Consumer Protection Act of 16 February 2007, they have submitted separate tenders, partial offers or requests to participate unless they demonstrate that the links between them do not lead to distortion of competition in the procurement procedure.
The list of documents and statements confirming no grounds for exclusion is contained in pt.-VI.3. ADMINISTRATIVE INFORMATION - The ordering party shall depart from the exclusion of the Contractor pursuant to art. 24 (5) of the Public Procurement Law
Required deadline for execution of the entire order by 30.9.2018,
with the execution of: - the design and documentation specified in the PFU, - the information to the BIOZ plan and obtaining the building permit decision By 15.03.2017
Deadline for tenders: 60 dNi
In the present proceedings, the Ordering Party demands a bid bond of the amount of PLN 8, 000 (in words: eight thousand zlotys)
The bid security may be contributed in the forms specified in art. 45 sec. Section 6 of the Public Procurement Law contains information on the bid bond.
List of statements or documents confirming the fulfillment of conditions for participation in the procedure and lack of grounds for exclusion
A In order to assess compliance with the conditions of participationThe procedure and lack of grounds for exclusion referred to in Art. 24 sec. 1 pt. 22-22, the Contractor is obliged to attach to the offer the following document:
A.1 a single European contract document. The information contained in the aforementioned. The document will provide a preliminary confirmation that the contractor is not subject to exclusion and meets the conditions for participation in the procedure. (Instructions for completing the document are knownOrdered at https://www.uzp.gov.pl/
B The ordering party prior to awarding the order, will call the contractor whose bid was rated highest, to submit within the specified time (not shorter than 10 days), valid on the day of submission The following statements or documents:
B.1 confirming fulfillment of conditions for participation in technical or professional capacity: lists-Indicated in pt. III.1.3) announcement
B.2 confirming no grounds for exclusion from the proceedings:
a) information from the National Criminal Register within the scope of the specified value. 24 sec. 1 point 13. 14 and 21 of the Act and concerning the conviction for the offense of imprisonment, issued not earlier than 6 months before the deadline for submission of tenders or requests to participate in the proceedings.A statement by the contractor that no final court order or final administrative decision has been issued against him for payment of tax, social security or health insurance premiums or contributions, or, in the event of such judgment or decision, documents confirming the payment of these duties, including any interest or fines or concluding Binding poroC) the contractor's declaration that he has not ruled against him as a preventive measure against the prohibition of applying for a public order, (annex no. 8 to SIWZ) - if the contractor has his registered office or place of residence outside of the territory Of the Republic of Poland, instead of the documents referred to in pt. A) submit the relevant informationAnother register issued by the competent judicial or administrative authority of the country in which the contractor is established or has his habitual residence or place of residence is the person to whom the information or document relates, to the extent specified in art. 24 sec. 1, 13, 14 and 21 of the Public Procurement Law;
The documents referred to in point a) should not be issuedPrior to the expiry of the time limit for the submission of tenders or requests to participate in the proceedings.
If the country in which the contractor is established or has his residence or place of residence has the document referred to in point. (A) they shall be replaced by a document containing the contractor's declaration, indicating the personOr persons entitled to represent it, or a statement by the person to whom the document relates, made before a notary or before a judicial, administrative or professional authority or economic authority competent for its place of residence or place of residence. . With the offer form (original) Attachment No. 1 to the SIWZ is PLNUniform European contract document and a power of attorney to represent, if the offer is submitted by a proxy, if it does not result from an extract from the relevant register or from the central business records and information. The original of the power of attorney should be attached to itAuthorizing person signing the offer to represent or participate in proceedings in the tendering procedure and entering into an agreement on the order (Article 23 (2) of the Act). Contractors acting jointly should designate a leader with whom correspondence will be handled. By completing the offer form, as well as other documents referring to "YouIn the place eg "the name and address of the Contractor", enter the data for each entity, not the agent (leader).
3) By signing the contract with the Contracting Parties acting jointly, they must sign a contract regulating the cooperation of these contractors. It can not be concluded for a shorter time than the contract period with the Ordering Party. Instead of the above document, the contracting authority allows the depositIncluding the offer of a contract of co-operation. 24aa. 1 of the Public Works Act reserves the right to make the first evaluation of bids and then examine whether the contractor whose bid was rated the best is not subject to exclusion and meets the conditions for participation in the proceedings.
Internet address (URL): www.lodz.lasy.gov.pl/web/kolumn
aDirective: Classical Directive (2014/24/EU)

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Airport control tower construction work was 10 Aug 2017. Bidding is closed.

This tender has been issued by LASY PAŃSTWOWE NADLEŚNICTWO KOLUMNA in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45213332 - Airport control tower construction work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 14513986. The purchaser document reference is 251346-2017.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.