Tenders are invited for Construction Work Related to a Drinking Water Project in the Community of Whetstone in Cochise County, Arizona.
Whetstone Water Improvement District (WWID) is planning to carry out construction work related to a drinking water project in the community of Whetstone in Cochise County, Arizona, which will be partially financed by a grant from the North American Development Bank (NADB). WWID intends to execute the following infrastructure works:
1. Drilling and equipping Well #3 with a volumetric flow rate of 150 gpm, consisting of:
a. Drilled to a depth of 600 feet with 16-inch diameter surface casing and cementing;
b. Power line and transformer to supply energy to well (provided by power company);
c. Electromechanical equipment;
d. Chlorination unit; and
e. Perimeter fence.
2. Installing a water main extending approximately 615 feet, using 6-inch PVC pipe and 6- inch mechanically jointed ductile iron pipe inside a 6-inch steel casing to be installed by the jack and bore method under State Route 90.
3. Alternate Bid: Electrical upgrades to Wells #1 and #2.
Note: The electrical upgrades at the existing wells will be procured as an alternate bid item. Should the availability of funding be insufficient to cover this bid item, the upgrades will be delayed or removed from the project scope. NADB intends to contract a qualified consulting firm to provide Construction Management Services for the Water Supply and Distribution System Improvements in Whetstone, Arizona. The services will consist of verifying that construction work is carried out in accordance with the designs, specifications and established standards, as well as monitoring project performance and the proper use of funds provided by NADB. These services are expected to begin in the first quarter of 2019 and take approximately nine months to complete.
The consultant will be selected and contracted in accordance with NADB Procurement Policies and Procedures, as NADB will be the Executing Agency. Consulting firms that have experience in similar works and are interested in participating in the selection process should send an expression of interest to NADB via e-mail at the address indicated below no later than March 29, 2019.
The requirements and general bid information are indicated below:
Bid No.: SOLTA-C-19-007
Job Description: Construction Management Services for the Water Supply and Distribution System Improvements in Whetstone, Arizona.
The bid documents will be published only in English and can be found at the following link: https://cocef.box.com/s/v37u64l0hd1ec4m480osgsuzkv664h43.
Questions of a technical or contractual nature must be submitted to Marielena Constandse via email at the address indicated below, no later than March 29, 2019. Telephone inquiries will not be accepted. NADB will respond to all questions on April 3, 2019. Proposals must be delivered to an electronic repository no later than 5:00 PM (MST) on April 17, 2019. NADB will provide instructions for submitting proposals only to those firms that confirm their participation by e-mail at the address indicated below, on or before March 29, 2019. Proposals sent via e-mail will not be accepted.
Marielena Constandse
NADB Contract Officer
[email protected]*******************************
© 2019 Copyright by the North American Development Bank. Text of previous editions of NADBank News
may be viewed at: http://www.nadb.org.
For general queries concerning the North American Development Bank or NADBank News, send an email to
[email protected] or call (210) 231-8000.