Construction work for gas pipelines Tender in Slovakia - 7314444
Tender notice from Slovakia, published on 14 Jul 2016.
Executive Summary
The SPP distribucia, a.s. has issued a Tender notice for the procurement of a Construction work for gas pipelines in the Slovakia. This Tender notice was published on 14 Jul 2016 and is scheduled to close on 14 Jul 2017, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 7314444, while the tender notice number is 242183-2016 and Register on the platform.
Recovery, reconstruction and construction of gas pipelines :: Stakeout utility networks (except gas network SPP-D, which sets worker SPP-D) ;: delivery, stocking and maintaining the temporary traffic and safety signs needed for the execution of the work in accordance with applicable laws regulations ;: restoration, reconstruction or construction of the pipeline, t. j. COMpletna Realization of earth, building and assembly work, including switching dopojov OPH ;: supply of materials needed to carry out the work ;: requisite opinions, statements and decisions relevant government authorities in accordance with relevant environments such as water, waste, air, nature respectively. ensure the necessary notification Conservation Actnature and landscape, if the client does not inform in writing the contractor to ensure that the Client ;: transportation, gathering and securing recovery / disposal of waste in accordance with applicable legislation ;: perform all the prescribed tests on the work as a whole as well as its individual parts ;: Spaete landscaping and surface after termination ofi?1/2Works in original condition with regard to the execution of the work (unless the parties agree in writing on different surfaces and landscaping) ;: delivery ;: prescribed technical documentation is delivered design built documentation including a listing of the actual work performed as an itemized budget, drawn up in the program ODIS ;: Delivery Geodetic to focusNia actual execution of works, including Dopojeni?1/2 CABs in the system JTSK in high Systeme BPV 3 accuracy classes in graphical form MicroStation, with body TePlyn no. 372 in electronic form; which I will be targeted and all pipeline crossings with foreign devices with the identification of the owner with a foreign equipment and planimetric updates for temperature ;:security M develop and agree a technological procedure to disconnect and link ;: Spaete those customers to prevadzky.Pre for accidentally reconstruction, repairs and special projects: to the contract is a summary of activities and work related to the implementation of emergency projects without PD, accident reconstruction and repair of oil. Extraordinary projects and emergency redeclares emergency commission structures SPP: Distribution SpA in accordance with applicable regulatory acts. Repair of oil will be carried out based on individual requirements of the CAP: Distribution SpA planted "prompted to delete a state of emergency / state of emergency / call for repair" .Činnosti and work involved in managing emergency projects mimoriadnych projects without documentation and repair of oil, Najman consists of the following activities: engineering-project basis činnosti.Vstupne :: carry out the surveys necessary for preparation of documentation and production, : obtaining the necessary permits for building works, including all opinions to competent authorities ensure the necessary, : notification pursuant to the Act on the protectioni?1/2nature and landscape, : obtaining the consent of the owner of the property concerned with technical solutions and implementation s connection of gas appliances to the distribution sieti.Projektova Preparation :: preparation of documentation for zoning decision if the respective institutions required, : preparation of documentation for building permits: Should the relevant authorities provided the, : Preparation of project documentation of actual realization diela.Realizacia parts :: Project documentation of actual realization of the work, : ensure geodetic survey, : ensure the implementation of the changes necessary permits, : coordination of works and supplies in the implementation diela.Činnosti after execution Realization :: securing approval decision : andto be the competent authorities with requested, : participation in trial operation and cooperation in the Guarantee skuškach.Prace and supply of materials :: Stakeout existing engineering network (excluding gas network SPP-D, which sets worker SPP-D), : delivery, stocking and maintaining temporary traffic and safety markings needed for the execution of the work ini?1/2accordance with applicable law, : restoration, repair, or construction of gas equipment, t. j. Complete implementation of earthworks, building and assembly work, including switching dopojov OPH, : supply of materials needed to carry out the work, : performance of documentation in accordance with applicable legislation, : transportation, gathering and evaluation of security / DISPOSALno waste in accordance with applicable law, : perform all the prescribed tests on the work as a whole as well as its individual parts, : Spaete landscaping and surface after completion of execution of the work to its original state with regard to the execution of the work (unless the parties agree in writing the landscaping and other surfaces), : delivery prescribed technickej documentation, : delivery of project-built documentation including a listing of the actual work performed as an itemized budget, drawn up in the program ODIS, : delivery geodetic survey of your actual construction, including Dopojeni?1/2 CABs in the system JTSK in high Systeme Bpv, 3rd accuracy class in graphic a MicroStation extension with TePlyn no. 372 in electronic form which will be targeted and all pipeline crossings with foreign devices with the identification of the owner of foreign equipment and planimetric updates with surrounding security, : develop and agree a technological procedure to disconnect and link, : Spaete putting customers into operation. Description: Construction work for gas pipelines Authority Type: Utilities entity
Contact Nature: Works
Procedure: Not applicable
Document: Qualification system without call for competition
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45231220
CPV Description: Construction work for gas pipelines.   Internet address (URL): http://www.spp-distribucia.sk
The bid deadline for Construction work for gas pipelines was 14 Jul 2017. Bidding is closed.
This tender has been issued by SPP distribucia, a.s. in Slovakia.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45231220 - Construction work for gas pipelines.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 7314444. The purchaser document reference is 242183-2016.
This tender falls under Construction and Real Estate in Slovakia. Suppliers in these sectors can track similar Slovakia tenders using CPV-based alerts.