Construction work for buildings relating Tender - 8191538
Tender notice from Switzerland, published on 14 Sep 2016.
Executive Summary
The Schulgemeinde Kuesnacht, Schulverwaltung has issued a Tender notice for the procurement of a Construction work for buildings relating to education and research in the Switzerland. This Tender notice was published on 14 Sep 2016 and is scheduled to close on 19 Oct 2016, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 8191538, while the tender notice number is 318991-2016 and Register on the platform.
Key facts
Summary
Construction work for buildings relating to education and research
Urban Development and ArchitekturDas existing schoolhouse from 1962 no longer is enough to spatial, pedagogical, energy and safety standards. After a feasibility study, the school community Kuesnacht has therefore led by a project competition for a new school facility Goldbach year of 2010. BGM architects, Basel, went with herCompetition entry shows "Diego" as the winner of the advertised through the school community in an open process, and carried out the architectural competition. After Projektwettbewerb a study on the reduction of the ground and thus the buildings around 1.60 m opposite the competitive state was developed by architects BGM. The excavation of a total of 2.60 againstabout the present level of the sports field was the building committee of the municipality Kuesnacht with preliminary decision from 26.03.2013 bewilligt.Die new school complex Goldbach comprises the schoolhouse and kindergarten. The two different sizes and freestanding buildings border the playground, which forms the center of the plant. The open arrangement takes groesstmoA ny Ruecksicht given to the needs of the surrounding residential buildings by lake view and good tanning. The school system is developed by the Bi?1/2hlstrasse and assigned to this. The public buildings gets so adequate Praesenz in street image. The arrangement of the buildings provides versatile functional Aussenraeume very different characterThat sind.Allgemein incorporated into the route network of the neighborhood accessible spaces such as library / media drawing / Crafts, the workroom, the office of the school administration and the teachers' room are downstairs. The center of the school building is the inner concourse, which is separated from the auditorium with a flexible partition. By larger events is die recreation hall of the auditorium can be activated. The mobile Stage can be placed depending on the occasion and allows various spatial concepts. The two upper floors are the 7 classrooms and hand working space. The Unterrichtsraeume are oriented east and west. They form a flexible system with class and Gruppenraeumen, including the insidelying and by skylights exposed half classroom can be switched. In the base of the school is the course exposed gym. This comprises a separate access directly Bi?1/2hlstrasse, which involves the use by external, such as clubs, erleichtert.Das Kindergartengebaeude three classes. The children Gaerten are equipped with a separate outdoor space that is directly accessible from the classes. The kindergarten is thus handicapped accessible also on the first floor. The for educational purposes necessary materials can be stored in built-in wardrobes in the classrooms. The proximity of the kindergartens to the schoolhouse allows uncomplicated Zccess to sharable spaces such as gym and Bibliothek.Die high compactness of the building gewaehrleistet a favorable ratio of volume to building envelope. With the clear outer shape without large Rueckspruenge is achieved with a sufficient insulation of the Minergie standard. Certification is provided. The energy supply is basedi?1/2on a renewable energy geothermal installation. Using a heat pump heating is put at your disposal. The building is partly mechanically ventilated. All Unterrichtsraeume lying on the facade, however ventilated naturally by controlled Fensterlueftung. were to achieve a sustainable concept under other following additional measures taken: high thermal quality of the building envelope, large Speicherfaehigkeit by massive construction, exterior efficient sun protection, good daylighting of the class room by large Fensteroeffnungen and skylights, one above the other lying wet areas and optimized risers. On the roof of the kindergarten is a Photovoltaik plant vorgesehen.Die facade of the school building and the kindergarten are made of artificial stone elements. These are added as a supplement with limestone and enriched with colored pigments. The cast stone elements are sandblasted, creating a natursteinaehnliche, busy surface. The windows are wood-metal windows with triple glazing, verbundscheibensicherheitsglas and external sun protection system. The premises are minted by brightly varnished concrete, a bright color scheme and fittings made of solid wood in natural oak. As a flooring terrazzoartiger, polished concrete floor and parquet comes in the classrooms to Anwendung.LandschaftsarchitekturDer New school Goldbach is grueNEN Quartier anchored topographically. Its outdoor area takes on characteristics of the garden landscapes of the neighborhood, thus fits into its context and places them in a subordinate by Zusammenhang.Ueber a generous outdoor staircase you step on the level of the playground, which creates a link between kindergarten and Schulgebaeude. Slope side includes a strong green Heckenkoerper chopped Laubgehoelzen from the yard. In addition to its atmospheric quality and schalldaempfenden effect he is mediating part of Gehoelzrands limiting the outdoor area and it is possible to appear as a unit. Blooming shrubs of different types and heights include the verschiedenen Gartenraeume for game and stay both in the kindergarten and in the public part of the way Zuerichstrasse. Trees and shrubs of native trees and Parkbaeumen in meadows and lawn rich terrain underline the park-like character of Gesamtanlage.Der Outside the kindergarten has the configuration of Gehoelzsaumes niches for sand play, Rasenspielflaechen and seatings. A small Geraetehaeuschen enriches the offer. The garden is directly accessible by the Unterrichtsraeume, but can also be accessed via road or the schoolyard. Thus, at the same time the Behindertenzugaenglichkeit Kindergartengebaeudes is gewaehrleistet. Overall, the garden is but fori?1/2the smallest pupils and Schuelerinnen vorbehalten.Der garden area of the school, however, is designed as a publicly accessible park, which is opened up by the Zuerichstrasse. It also aims to weekends and holidays at all times be accessible during and be inviting to the nearby residents. Ground-level play with water, sand and natural chen materials finds its place here. The existing fountain sculpture "Eulenspiegel" by Joerg Fausch is obtained and a floor higher ground in the park from the road integriert.Der schoolyard primaer a meeting place for students and Schuelerinnen and for the teachers. Sport activities are not in the foreground. have motion gamesn stronger informal nature. A long, bi-oriented Wooden bench forms the striking element on the hard court. Behind the school building replaced the flooring with concrete slabs and gravel sickerfaehigem and creates a calmer atmosphere to sit and linger. From buildings from here can be directly contact and the Area expectant taken possessions for manual training and the like. Following the green hedge, then opens a narrow path, the need in the front more public gardens school fuehrt.Die for the school Besucherparkplaetze focus on contemporary Bi?1/2hl- respectively Zuerichstrasse well as the external access to the sports hall. Thus, the schoolyard and the school are Ingaenge kept free from vehicular traffic and unauthorized use. For the school and the neighbors a container pick-up place is defined. Description: Construction work for buildings relating to education and research Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: GPA
Award criteria: The most economic tender
CPV code: 45214000
CPV Description: Construction work for buildings relating to education and research.   Internet address (URL):
The bid deadline for Construction work for buildings relating to education and research was 19 Oct 2016. Bidding is closed.
This tender has been issued by Schulgemeinde Kuesnacht, Schulverwaltung in Switzerland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45214000 - Construction work for buildings relating to education and research.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 8191538. The purchaser document reference is 318991-2016.
This tender falls under Construction and Real Estate in Switzerland. Suppliers in these sectors can track similar Switzerland tenders using CPV-based alerts.