Cross Icon
Cross Icon

Construction of steel frame roof structure Tender - 20069682

The UNITED NATIONS OFFICE FOR PROJECT SERVICES has issued a Tender notice for the procurement of a Construction of steel frame roof structure at the treatment plant for the dennery north water supply project (phase 1) in dennery, saint lucia - copy in the Aland Islands. This Tender notice was published on 20 Feb 2018 and is scheduled to close on 29 Jan 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 20069682, while the tender notice number is RFQ/2018/2985 and Registering on the platform.

Expired Tender

Procurement Summary

Country: Aland Islands

Summary: Construction of steel frame roof structure at the treatment plant for the dennery north water supply project (phase 1) in dennery, saint lucia - copy

Deadline: 29 Jan 2018

Posting Date: 20 Feb 2018

Other Information

Notice Type: Tender

TOT Ref.No.: 20069682

Document Ref. No.: RFQ/2018/2985

Competition: ICB

Financier: United Nations Secretariat

Purchaser Ownership: -

Tender Value: Refer Document

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_details

Login to see details

Tender Details

Construction of Steel Frame Roof Structure at the Treatment Plant for the Dennery North Water Supply Project (Phase 1) in Dennery, Saint Lucia - copy
Deadline: 29-Jan-2018 16:00
Time zone: (GMT 0.00) Western Europe Time, London, Lisbon, Casablanca
Description:

The Government of Saint Lucia through the United Nations Office for Project Services (UNOPS) received a USD 5 million grant from the Government of Mexico to undertake a water supply project in Dennery.

UNOPS, functioning as the project management entity in accordance with the signed agreement with the Government of Saint Lucia, is managing the implementation of the project, while the Water and Sewerage Company (WASCO) will facilitate the work of the representatives of UNOPS through follow-up, review and monitoring of project activities.
The beneficiary of the project is the Ministry of Agriculture, Fisheries, Physical Planning, Natural Resources and Co-operatives, and the Government of Saint Lucia and subsequently and most importantly the citizens of Dennery.
The sustainable operation of the system is key to ensure an enhanced level of service to the populations. Experience has proven that benefits are only achieved when hardware installation is fully integrated with properly planned and implemented arrangements for the long-term operation, maintenance and financing of an improved service.
The community of Dennery North deserves a system that is not only fully functional but is also resilient to the unique climatic conditions of the Caribbean region. For this reason, UNOPS wishes to incorporate sustainability by implementing structures that improve the efficiency of the water treatment process as well as creating a safe and comfortable working environment for the end-users.
-----
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
UNSPSC:

D - Construction, Transportation & Facility Equipment & Supplies

22000000 - Building and Construction Machinery and Accessories
There have been no revisions to this notice.
26-Jan-2018 22:52 : [email protected] - New amendment added #1: This amendment is the incl...
Change/edit date

26-Jan-2018 22:52

Change/edit email

[email protected]

Change/edit details

New amendment added #1: This amendment is the inclusion of Annex 1 in the list of documents in support of CLARIFICATION NOTE No. 3 as follows:Description of Site Condition and Site Plans

26-Jan-2018 22:40 : [email protected] - New clarification added: Question No. 2“Please cla...
Change/edit date

26-Jan-2018 22:40

Change/edit email

[email protected]

Change/edit details

New clarification added: Question No. 2“Please clarify if you require the anchors to be chemical with stainless steel threaded rod or new mild steel anchor bolts cast with rework to the concrete footings.Answer No. 2:Anchor bolts and nuts are provided by the Client and will have already been installed at the six (6) anchor point on the existing reinforced concrete raft. The bidder is to include for the specified baseplate and associated works to erect the structural frame. Refer to ANNEX 1, Images 4-5 for anchoring components.

26-Jan-2018 22:39 : [email protected] - New clarification added: The following clarificati...
Change/edit date

26-Jan-2018 22:39

Change/edit email

[email protected]

Change/edit details

New clarification added: The following clarifications are relevant to the process mentioned in reference and should be considered in the preparation of your proposals:Question No. 1:“Can you provide or upload a site layout or pictures of what exist? Our concern is access to and from the site as well as man lift/craneage requirements.”Answer No. 1:The site is located along the Castries Vieux Fort Highway and can be accessed via a concrete residential collector which connect to the aforementioned highway.See Clarification 3 - ANNEX 1 – Site Conditions and Site Plans

25-Jan-2018 21:54 : [email protected] - New clarification added: Question No. 8 “Please co...
Change/edit date

25-Jan-2018 21:54

Change/edit email

[email protected]

Change/edit details

New clarification added: Question No. 8 “Please confirm the building code and wind-speed to be used for the project”Answer No. 8:For information, the wind-speed and building code used for the design of the structure were:· IBC- 2009, ASCE 7-05· Basic wind speed 130mph· Region – Hurricane Prone· Exposure Cat- C

25-Jan-2018 21:53 : [email protected] - New clarification added: Question No. 7“Are we all...
Change/edit date

25-Jan-2018 21:53

Change/edit email

[email protected]

Change/edit details

New clarification added: Question No. 7“Are we allowed to submit an alternative building to the one shown - or do we have to fabricate what is shown on the plan? “Answer No. 7:No alternative bids are allowed.

25-Jan-2018 21:53 : [email protected] - New clarification added: Question No. 6“When is th...
Change/edit date

25-Jan-2018 21:53

Change/edit email

[email protected]

Change/edit details

New clarification added: Question No. 6“When is the due date?”Answer No. 6:All offers must be submitted by 5:00 p.m. Saint Lucia Time on 24th January 2018. The works should be completed 21 days after contract award.

25-Jan-2018 21:50 : [email protected] - New clarification added: Question No. 5“Is the str...
Change/edit date

25-Jan-2018 21:50

Change/edit email

[email protected]

Change/edit details

New clarification added: Question No. 5“Is the structure constructed already or in progress? “Answer No. 5:Only the reinforced concrete floor slab for the structure is completed. Note that a fully operating water treatment plant is atop this slab.

25-Jan-2018 21:50 : [email protected] - New clarification added: Question No. 4“Is the Cl...
Change/edit date

25-Jan-2018 21:50

Change/edit email

[email protected]

Change/edit details

New clarification added: Question No. 4“Is the Client providing scaffold/ access?”Answer No. 4:No. Bidder to include scaffold in their quotation.

25-Jan-2018 21:49 : [email protected] - New clarification added: Question No. 2“What type ...
Change/edit date

25-Jan-2018 21:49

Change/edit email

[email protected]

Change/edit details

New clarification added: Question No. 2“What type of roof sheets? Gauge and color?”Answer No. 2:To be specified by supplier

25-Jan-2018 21:47 : [email protected] - New clarification added: Question No. 1:Is the quo...
Change/edit date

25-Jan-2018 21:47

Change/edit email

[email protected]

Change/edit details

New clarification added: Question No. 1:Is the quote only for the roof covering?Answer No. 1:The quotation should be for the superstructure- the slab currently exists so all components above slab should be included, inclusive of the roof covering and steel frame.

25-Jan-2018 21:03 : [email protected] - New clarification added: Question No. 2“Will the U...
Change/edit date

25-Jan-2018 21:03

Change/edit email

[email protected]

Change/edit details

New clarification added: Question No. 2“Will the UNOPS allow for sub contract installation service from our sub-contractor in St. Lucia?"Answer No. 2:Yes. UNOPS allows for sub-contracting. However, be reminded that Clause 3.4 of UNOPS’ Minor Works Contract applies:“In the event the Contractor requires the services of subcontractors, the Contractor must obtain the prior written approval of the Employer’s Representative for all such subcontractors. The approval of the Employer’s Representative does not relieve the Contractor of any of its obligations under this Contract, and the terms of any sub-contract must be subject to and in conformity with the provisions of this Contract.”

25-Jan-2018 21:03 : [email protected] - New clarification added: Question No. 1:“[…] the t...
Change/edit date

25-Jan-2018 21:03

Change/edit email

[email protected]

Change/edit details

New clarification added: Question No. 1:“[…] the tender contains a statement under section III, Deliverables: "The activities shall be carried out in Saint Lucia". Can you please clarify if this means that fabrication must be carried out in St. Lucia? Or does the tender allow for external fabrication?”Answer No. 1:The structure only needs to be erected in St. Lucia. At the sole discretion of the bidder, the structure can be pre-fabricated externally and then erected at the final location.
NOTE: Multiple Countries (Total: 23)
Type of notice :Request for quotation
More Details :D - Construction, Transportation & Facility Equipment & Supplies
22000000 - Building and Construction Machinery and Accessories

Documents

 Tender Notice


Request Demo
GiZ Tenders India

Procurement Documents for Aland Islands

Access a comprehensive library of standard procurement documents specific to Aland Islands. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Aland Islands

Explore Procurement Documents for Aland Islands


Want To Bid in This Tender?

Get Local Agent Support in Aland Islands and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?