Construction of One (1) Off-Site ATM Vestibule Lobby Type at Municipality of Caoayan, Caoayan, Ilocos Sur
REQUEST FOR QUOTATION
The Development Bank of the Philippines (DBP), through its Bids and Awards Committee, RMC-Western Luzon, will undertake a Small Value Procurement for the -œConstruction of Off-Site ATM Vestibule Lobby Type- in accordance with Section 53.9 of the Revised Implementing Rules and Regulations of Republic Act No. 9184. The details of the project/activity/program are as follows:
Name of Project : Construction of One (1) Off-Site ATM Vestibule Lobby Type
Location : Municipality of Caoayan
Caoayan, Ilocos Sur
Specification: Construction of Off-Site ATM Vestibule Lobby Type in LGU Caoayan (See attached Annex -œA- for complete scope of works)
Approved Budget for the Contract: Two Hundred Sixty-Four Thousand Seven Hundred Thirty-Six Pesos and 18/100 (a‚+/- 264, 736.18)
Contract Duration : Thirty (30) days upon award of Contract
Interested bidders are required to submit their signed Price Quotation Form (Annex -œA-) on or before 3:30 P.M. of December 13, 2017. Open quotations may be submitted manually at DBP RMC-Western Luzon Mezzanine, DBP Dagupan Branch Building, M. H. del Pilar Street, Dagupan City or through email address
[email protected].
The project shall be awarded to the proponent determined to have submitted the complete and lowest quotation. The proponent with the lowest price quotation shall be required to submit to the BAC certified copies of the following documents before award of the project:
1. Mayor-s / Business Permit;
2. PhilGEPS Registration Certificate;
3. PCAB License;
4. Income/Business Tax Return; and
5. Omnibus Sworn Statement
For inquiry, you may contact Mgr. Rosielyn C. Olalia, BAC Secretariat, at Telephone Nos. (075) 523-7836 or 523-7835.
Scope of Works
The contractor shall hold all the obligations, duties, and responsibilities necessary to the successful completion of the contract assigned to or be undertaken by the contractor, including all labor, materials, equipment and services, other incidentals and furnishings thereof in accordance with the drawings, specifications and all addenda prepared by DBP.
1. GENERAL REQUIREMENTS
1. Permits
2. Preparation of architectural and electrical drawings
3. Provision of temporary water, power and facilities
4. Mobilization and Demobilization
5. General cleaning and hauling of debris
2. SITEWORKS
1. Excavation works
2. Backfill
3. CONCRETING WORKS
1. Formworks and scaffoldings
2. Construction of footing, column, beam, slab, parapet, etc.
4. MASONRY WORKS
1. Installation of 6- thk. CHB inclusive of 10mm diameter re-bars and plastering on both sides using Portland concrete.
5. METAL WORKS
2. Signage post
3. Fabrication of 37.5mm stainless steel handrail complete with accessories.
6. THERMAL & MOISTURE PROTECTION
1. Waterproofing works
a. Application of elastromeric waterproofing (2 coats)
7. DOORS & WINDOWS
1. Glass Door inclusive of lock, closer and hinges
a. Installation of A1/4- thk. glass on 2- x 4- aluminum frame (analok finish) with 5/8- diameter aluminum tubing horizontal grille (1/2- re-bar inserted spaced at 0.10m) tubing. Provide 3M brand 4mils clear security film.
2. Windows
a. Installation of A1/4- thk. clear glass on aluminum frame (analok finish) with 5/8- diameter aluminum tubing horizontal grille (1/2- re-bar inserted spaced at 0.10m) tubing and aluminum louvers with insect screen. Provide 3M brand 4mils clear security film for glass window.
8. FINISHES
1. Painting of the following finishes Boysen brand
a. Semi- gloss paint finish for walls.
b. Enamel paint for steel post.
2. Installation of the following floor finishes
a. 300mm x 300mm vinyl tiles
3. Installation of the following ceiling finishes
a. A1/4 thk. Marine plywood on 2- x 2- wood ceiling joist.
9. SPECIALTIES
1. Signage
a. Flag type signage with steel post.
b. Installation of sunscreen blinds ( color: bone white)
c. Installation of aluminum threshold at door opening
10. PLUMBING
1. Installation of roof drain, strainer and downspout.
11. MECHANICAL WORKS
1. Installation of oscillating fan
2. Installation of exhaust fan with timer
12. ELECTRICAL WORKS
1. Installation of lighting fixture
2. Installation of circuit breaker
3. Installation of switches, outlets and wirings
4. Tapping of electrical wiring to main power supply
DESCRIPTION QTY. UNIT
A. General Requirements and Permits 1 lot
B. Mobilization 1 lot
C. Site Works:
Excavation, backfill, earthfill, hauling of debris 1 lot
D. Concreting Works:
Cement 34 bags
Sand 2 cu.m.
Gravel 4.50 cu.m.
12mm dia. Bar 30 pcs.
10mm dia. Bar 50 pcs.
Tie Wire 6 kgs.
Formworks 1 lot
E. Masonry Works:
6" thk. CHB 200 pcs.
Cement 17 bags
Sand 1.30 cu.m.
10mm dia. Bar 5 pcs.
Tie wire 4 kgs.
F. Thermal and Moisture Protection
Waterproofing (Elastomeric)
Application of elastomeric waterproofing (2 coats of water proofing) 15 sq.m.
G. Door and Windows
0.90m x 2.10m aluminum framed glass door w/ 3M clear security film 4 mils. Complete with lock accessories and horizontal grille. 1 set
1/4- thk. clear glass on aluminum framing complete with horizontal grille and louvers (Provide 3M clear security film 4 mils) 3.60 sq.m.
H. Finishes
Ceiling
1/4- thk. marine plywood 3 shts.
2- x 2- wood nailer 60 bdft
Assorted nails 6 kgs.
Flooring
0.30m x 0.30m vinyl tiles (3mm thk.) Color: Off-white 45 pcs.
Adhesive 2 kgs.
Painting
Semi-gloss paint (walls and ceiling) 42 sq.m.
I. Specialties
ATM flag-type signage (1.00M x 0.60M) complete with steel post and reinforced foundation 1 unit
Sunscreen Blinds (Color: Bonewhite) 27.5 sq.ft.
Aluminum Threshold 1 pc.
Stainless steel railing complete with 1 lot
J. Electrical Works
Electrical works (LED lighting fixture, pinlight, switches, outlets, wirings, circuit breaker)
Include tapping of electrical wiring to the main power supply 1 lot
K. Mechanical Works
Heavy duty exhaust fan with timer (complete with ducting and louver) 1 unit
Oscialting Fan 1 unit
L. Plumbing Works 1 lot
OTHER WORKS AND REQUIREMENTS/CONDITIONS:
1. The contractor shall secure and pay all required permit fees and comply with all laws and local ordinances and related government regulations in connections with the project. Included herein are signing of plans for processing of necessary permits.
2. The contractor shall submit timetable/schedule reflecting all activities needed to complete the project. Included herein are the signing of plans for processing of necessary permits.
3. The contractor shall submit sample/s of materials/fixtures for approval by DBP before fabrication/installation.
4. Defective works and materials may be rejected by DBP at any time before the final acceptance of the work and rebuild/replace in accordance with the plan and specifications with the resulting expenses chargeable to his account.
5. Upon completion of works, the contractor shall remove all temporary structures and surplus materials before leaving the premises.
6. The contractor shall be fully responsible for the safety of his men and clearly understands and agree that no employer-employee relationship shall exist between the contractor-s men and the DBP. Any damage caused by the contractor or his men to any property of the DBP or injury or death to a third party shall be the sole responsibility of the contractor and the latter shall pay the cost or shoulder the burden thereof.
7. The DBP shall be free and made harmless from any and all kind of claims, damages, liabilities arising from the contractor-s non-compliance with the requirement of the Workmen-s compensation, Social Security and other labor laws.
8. Neither the final certificate nor the final payment, nor any provision of the contract document shall relieve the contractor of the responsibility for faulty materials and workmanship.
9. If the contractor refuses or fails to complete the project within the specified time plus any time extension duly granted, the contractor shall pay DBP, by way of liquidated damages, the amount equivalent to one tenth of one percent of the total contract price for each calendar day or delay until the project is completed and accepted or taken over by the DBP as stated in the Revised IRR Annex E of R.A. 9184.
10. Other terms, regulations and conditions shall follow the Revised IRR of R.A. 9184.
Closing Date : 2017-12-13