Expired Tender France ICB TOT Ref. 35047080

Construction of a gendarmerie in the commune Tender - 35047080

Tender notice from France, published on 27 Jul 2019.

Executive Summary

The C.A. DE LA RIVIERA FRANCAISE has issued a Tender notice for the procurement of a Construction of a gendarmerie in the commune of sospel in the France. This Tender notice was published on 27 Jul 2019 and is scheduled to close on 30 Jul 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 35047080, while the tender notice number is 19-95350 and Register on the platform.

Key facts

Summary
Construction of a gendarmerie in the commune of sospel
TOT Ref. No.
35047080
Document Ref. No.
19-95350
Country
France
Notice type
Tender
Competition
ICB
Publication date
27 Jul 2019
Bid deadline
30 Jul 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Tender are invited for construction of a gendarmerie in the commune of sospel
object of the contract : construction of a gendarmerie on the commune of sospel place of execution of work, delivery of supplies or provision of services: place of the station 06380 sospel possibility to submit an offer for: one or more lots lot information: lot n1: special foundations the company of this lot is bound to respect all the texts, (laws, decree, decree, example of the solutions, norms-dtu, standards, technical notices, certifications) issued by the reef at the date of the signing of the contract. Generally, it is indicated that all the materials concerned by the present prescriptions will have to be presented by the contractors with all the samples, minutes, documentation and justification necessary. In case of insufficiency of information, the master of work will be able to ask the contractor and the load of this one, all tests or calculations by a laboratory ormoreover, the contractors will refer, for all the works quoted in the cctp, to the french regulations and standards in force at the date of the consultation and will take into account all the special requirements applicable on the site. Lot n2: big work respect of all the norms and technical prescriptions of the different administrations (services water, electricity, road system etc ....) all the works to realize for these administrations must be the subject of a prior agreement with the provision of plans, drawings, sketches and summary descriptions of the work to be done. The contractor must also take into account all municipal or departmental orders for the realization of his works. Particular: without this list being limited (including updates, modifications eterratum) .- eurocodes- dtu rules 13.1 superficial foundations for the building- dtu 13.2 deep foundations for the framedtu 13.3 paving: design, calculation and execution- dtu 21 execution of concrete structures- dtu 20.1 calculation rules and minimum construction provisions- rules fb prediction method for calculating the fire behavior of concrete structures lot n3: wood frame and cover the works to be carried out, at the expense of the company, include a flat rate and not a limitation: - preparatory work of all kinds (supply of elements to be incorporated, prmeasurements of measurements on the building, verification, as the progress of the works of the good implantation of the companies or the reservations, etc ...) .- all the work to be carried out in non occupying environment- all the necessary works and temporary character, (realization and then deposit, demolition and / or removal) concerning its body of state- selective sorting and evacuation of the site, rubble, waste and others, in discharge approved by themunicipalite.- the implementation oworks comprising: fixing, setting, sealing and caulking in accordance with the provisions of this cctp. - complementary site installations for the implementation of its works, - implementation studies including calculation notes, wood frame plans to be submitted. Approved by the control office and the project manager before execution. The irons indicated on the plans of the project are given as an indication.- all its installations of site- the supply, the transport on the job and the implementation of all the materials necessary for the realization of the projected constructions. - the supply, the establishment and the removal at the end of works of all the apparatuses necessary for the realization of the works.- manpower.- the removal, for any reason whatsoever, of the material on the right-of-way of the building site.- the repair of the defective works found during the execution.- the protection and the treatment of the materials.- the elements definitifs or provisional connection or dressing with the bodies of state adjacent to its works. - the subjects due to the presence of other corps of state on the building site. - the protection of the neighboring buildings.- the adaptation of the works (including impacts on the structure) to the different phases of the works.- provisional provisions to ensure safety (temporary guardrails, safety net, etc.) - the supply and installation of all accessories allowing a perfectfinishing of the works.- the protections necessary during and after the implementation of the works until the reception.- the implementation and the laying down of the temporary supports of support which are necessary.- the presentation of samples.- the daily cleaning, major cleaning, weekly and general cleaning at the end of the works.- complete file of executes work.the above list is not exhaustive. Lot n4: fronts the work to be carried outcharge of the company, include a flat rate and not limited to: - preparatory work of all kinds (supply of items to incorporate, measures taken on the building, audit, as and when the progress of the work of the proper implementation ofincorporations or reservations, etc ...) .- all work to be done in non-occupancy- all the necessary and temporary work, (realization and then deposit, demolition and / or removal) about son body of state- the selective sorting and evacuation of the site, rubble, waste and others, in discharge approved by themunicipalite.- the implementation of works comprising: fixation, adjustment, sealing and caulking in accordance with the prescriptions of the cctp .- complementary site facilities for the implementation of its works, - site surveys for commissioning. - the supply and supply on site of the materials and equipment necessary for the execution of the works.works, - the lifting and the implementation of the materials, - the supply and the realization of samples for approval of the master of work, - the scaffoldings and protections necessary to the execution of the works, - the protection of the unpainted works - exterior coatings - exterior coatings on insulation - concrete paints - cleaning at the end of the company's intervention, - supply of data sheets for the products used, - assistance and advice of the company. Fabricant paints and materials.- supply and installation of the works defined hereafter in the cctp.- reception cleaning- assistance to other bodies of state.- treatments and protections.- conditioning and protection of metals .- the manufacture in workshop, the transport on foot, the storage, the installation, the adjustment, the adjustment and the stakes of the works described in the cctp.- the holes and seals.- the control of the good operation works before the reception.-the plans of collection and file doela list above is not limiting. Lot 5: exterior wood furnishings the works to be carried out, at the expense of the company, include a flat rate and not a limitation: - preparatory work of all kinds (supply of items to be incorporated, measures taken on the shop, verification, as and when the progress works of good implementation ofincorporations or reservations, etc ...) .- all worksto be carried out in a nonoccupied environment - all the necessary and temporary works, (realization and then deposit, demolition and / or removal) concerning its body of state- the selective sorting and the evacuation of the site, rubble, waste and others, in discharge approved by themunicipality.- the implementation of works comprising: fixing, setting, sealing and caulking in accordance with the requirements of this cctp.- the complementary facilities of site to the implementation ofhis works, - the releves on site for putting in manufacture or command.- the plans of details of the works starting from the dimensions raised of the elements of the go- reception of the works of go- preparation of the plans of reservations for the works to seal in the structural elements and communication to the interested parties for agreement. - rustproofing in the workshop and retouching on the building site after installation of ferrous metals. - work transport, handling, storage, protectimaterials and materials.- sealing made with cement mortar.- scaffolding, lifting equipment, protections for workers (railings, nets, etc ...) .- supply and installation of windows defined by the cctp and washing works on both sides.- the protection of aluminum structures by peelable film.- the installation of ventilation grills in the joinery.- all the flaps of cladding and support, glazing beads.- supply and installation of the works defined above after in the cctp.cleaning of reception- assistance to other bodies of state.- treatments and protections.- packaging and protection of metals.- manufacturing in workshop, transport on foot, storage, installation, adjustment, adjustment and setting stakes of the works described in the cctp.- the holes and seals.- the control of the good functioning of the works before the reception.- the plans of rotation and file doela list above is not limiting. Lot n6:serrurerie the works to be carried out, at the expense of the company, include a flat-rate and not limited: - the preparatory works of all kinds (supply of the elements to be incorporated, measurements of the site, verification, as and when the progress of the work of the good implementation of incorporations or reservations, etc ...). - all the work to be done in a non-occupied environment - all the necessary and temporary works, (realization then depdare, demolition and / or removal) concerning its state body - the selective sorting and evacuation of the site, rubble, rubbish and other, in discharge approved by the municipality. - the implementation of works comprising: fixing, adjustment, sealing and caulking in accordance with the requirements of the cctp. - the complementary installations of construction site with the implementation of its works, - the releves on site for putting in order. - the supply and delivery onmaterials and equipment necessary for the execution of the works, - the lifting and the implementation of the materials, - the supply and the realization of samples for approval of the master of work, - the scaffoldings and protections necessary to the execution of the works, - the protection of unpainted structures, - external coatings - external coatings on insulating materials - concrete coatings - cleaning at the end of the company's intervention, - the provision of technical data sheets relating tothe products used, - assistance and advice from the manufacturer of paints and materials. - supply and installation of the works defined hereafter in the cctp. - reception cleaning - assistance to other state bodies. - treatments and protections. - conditioning and protection of metals. - workshop manufacturing, on-the-job transportation, storage, installation, adjustment, adjustment and putting into play of the works described in the cctp. - holes and sealings. - the control of the good functioning of the works before the reception. - the plans of rotation and file doe the list above is not exhaustive lot n7: internal joinery the contractor owes all the work necessary for the perfect completion and the complete completion of the works, as it appears from the graphic and written documents, which he must have read, as well as according to the regulations in force and the rules of the art., for the works ofit is specified that all the works and supplies which are the indispensable complement of the planned works, for the perfect completion of all the works which are the subject of a lot, will be due by each contractor even if they do not appear, or are not described in the main parts or annexes of the market.the work to be performed, at the expense of the company, include flat-rate and non-limitatively: - studies, pac, detail drawings of the books, these drawings will review the locations and dimensions of the rabbets to book. If for lack of information, the reservations are not carried out, they will be charged to the contractor in charge of this lot. - the presentation, for prior agreement, of all the materials to enter the construction.- the supply of wood, plywood, fibreboard, particles used in the construction of joineries.- treatments and protections.- packaging and pwood rotection.- the manufacture in workshop, the transport on foot, the storage, the installation, the adjustment, the adjustment and the setting stakes of the works described in the present cctp.- the settlements of the frames of doorframes, batis or angles.- the supply of doorframes and wooden frames located in the partitions to the contractor in charge of the lot partitions -doublages (for the partitions) which will ensure the installation.- the supply of the frames and batts metal located in the concrete walls to the concretebuyer of the lotgros work that will ensure the installation- the supply and installation of door locks housing, gendarmerie and common premises- the supply and installation of the doors- the supply and installation of hardware stores of all works joinery, including oiling and greasing necessary as well as labeling.- the supply and installation of facades duct technique- the supply and installation of doors and closet fittings- the supply and installation of trapss of access, cladding and smooth wood ...- the supply and installation of bath dressing panels including access door- glazing equipment of some works (doors, ....) .- the kitchenettes- the supply and installation of mailboxes- the supply and installation of bulletin boards- the supply and installation of the signetique- the possible devices of temporary protection (case of very exposed works whose installation can not be realized in the final phase) .- has adate to be specified by the project manager, the cleaning of all the works as well as the removal of the temporary protection devices. - the supply and installation of the fastening systems not incorporated in the structural work as well as the cleats. Supply of fasteners (rails, bushings, cleats, etc.) where these are to be incorporated in the casting, at the locations shown on the drawings prepared by the contractor in charge of this lot. - holes and seals.- the control of the good functioning of the works before the reception. The list above is not limiting. Lot 8: cloison - false-ceiling- doubling the contractor shall have all the work and supplies necessary for the completion of the installations, in accordance with the provisions of this consultation file, without limitation or restriction, with all the conditions of perfect completion, operation and safety. All the work will have to be donewith all the necessary guarantees and in accordance with the standards in force at the time of the execution of the works. This lot includes the performance of the following services: - all site installations specific to this lot. The conformity of the frame and selected materials with the regulatory requirements, in particular those relating to the risks of fire, the contractual requirements of resistance, adaptation to the hygrometriume premises and sound insulation.- dusting the surface of the structural work to the connection with the works in plates.- the verification of the supports before the intervention.- the tracing and the implantation of the works.- the supply all materials and products required including handling, storage, assembly, etc.- the protection of metal structures by galvanization.- the supply, installation, removal and removal of the execution equipment (scaffolding, etc.) .- crazyinstallation and installation of the insulators and the vapor barrier, if necessary, fixing brackets, if any (additional cross-member, turntable, etc.) or structural reinforcement (frame in the case of heavy doors) .- installation of partition or of plasterboard cladding- the installation of ceilings in plasterboard- the installation of suspended ceilings in slab- the installation, adjustment and sealing of the frames and batis associated with the partition walls.- the supply, the setting place, theadjustment and fixing to the support structure of the primary frames the necessary caseceant.- the cutting for the eventual lighting devices encastres.- the work of various incorporations.- the supply and the installation of the protection devices of the vertical salient angles ( special strips, corner sticks), foot protection devices for partitions, etc., necessary for this installation.- the supply and installation of joint covers, cornices and joint treatment between oplate and other types of plastering.- the supply and installation of resilient strips, special joints, etc.- the cleaning and removal of all wastes and rubble resulting from these works as and when advancing to a center appropriate treatment.- the protections of works of other bodies of state.- the connections estimated necessary by the project manager, following the intervention of other bodies of state, after the completion of the work of the present lot.- the cleaning of the sdamage caused by the work of this lot.- the removal at the end of the work of the protections and packaging to an appropriate treatment center.- the final cleaning.- the supply and implementation of all the regulatory material as well as all the security protections necessary for access, supplies and execution of works.- records of works executed: doe lot n9: tile - faience the contractor will be responsible for all the work andsupplies necessary for the realization of the installations, in accordance with the provisions of this consultation file, without limitation or restriction, with all the conditions of perfect completion, operation and safety. All the works must be carried out with new equipment., presenting all the necessary guarantees and answering the standards in force at the time of the execution of the works. This lot includes the realization of the following services: - allsite facilities specific to this lot.- the recognition of the substrates.- the reception of the supports.- the studies, the plans of apparatus, plans of layout and details of execution.- the supply and the application of a smoothing plaster and adhesive in the case of laying collee.- the supply and installation of floors and walls themselves- delivery of the coating in a good state of cleanliness, without glue and waste stain from the deposit.falls, waste and packaging to a suitable treatment center. - the supply of the products specific to the execution of the works. - the supply of samples. - the realization of the witness surfaces, the adjustments requested by the master d. Creation and delivery of the works in their final state.- the supply of the tools and the execution equipment.- the application of the products according to the specifications of the dtu specifications and the particular documents of the market.-points with the different contractors loads of the other bodies of state interested.- the necessary preparations under the coatings.- the protections of works of other bodies of state.- the connections estimated necessary by the master of work, continued the intervention of other bodies of state, after the completion of the work of the present lot.- the cleaning of the soils occasioned by the works of this lot.- the protection of these works until the reception phase.- the cleaning of these worksin the reception phase. - the removal at the end of the work of the protections and packaging to a suitable treatment center. - the supply and implementation of all the regulatory materials and all the security protections necessary for access, supply and maintenance. The execution of the works.- file of executed works: doeen addition to the prescribed services, the company must: - the studies and the plans of execution.- the studies and the plans for the synthesis.- the setsupplies and services as defined in this cctp, as well as those provided in the common parts - all ancillary costs of material and labor (allowances, accommodation, travel, etc ...), lot n10: electricity c.f.o-c.f.a for the purposes of this lot, the following services will be provided: - site installation.- earth connection - equipotential links.- connection to the grid.- implementation of an electricity generator.- creation of a table gmainly low voltage. - creation of a divisional panel: td lts. - lighting equipment and sockets. - security lighting. - strong current leads - low currents. - lightning protection. - fire alarm. - pre wiring of vdi. .- control of access / intrusion / cctv.- videotelephony.- telephony: telephone networks service and rubis.- gtc.batiment dwellings: - connection to the public electrical distribution network.- creation of a riser in accordance withnfc 14-100.- creation of blue tariff metrics. - distribution of telephone networks and fiber optics. - creation of technical sleeves. - equipment lighting and power outlets. - lighting equipment - general service. - television. - control of access / videophone. - autonomous fire detector. Lot n11: c.v.c-plumbing the company owes all the services for a perfect completion of the installations which concern it and in particular: - the supply, the installationn and the folding of all equipment, machinery and scaffolding necessary for the performance of works and the adjustments of the installation.- all ancillary works such as piercings, seals, bleeds, connections, sleeves, oil changes, fillings, purges, etc. (except those defined in the delivery limits) - the removal of rubbish and miscellaneous packaging, with complete cleaning of the premises at the end of the decommissioning - the commissioning of the facilities, with cleaning and rinsing of the pipesso the disinfection of the networks of hot water and sanitary cold water, including the supply of the attestation of realization of this disinfection.- the filling and the purge of all the networks at the start of the installations.- the supply at work of all equipment and devices and their implementation- acoustic devices- measurements and adjustments- all work and tests specified in the various parts constituting the file consultation- the maintenance in bthe repair and replacement of all parts found to be defective during the warranty period. - the supply of the reaction and fire resistance reports of the various materials and materials. - the provision of test certificates. Of the aqc, the autocontroles the casecheant.- the supply of the releves of the adjustments of flow carried out on the installations hydraulic and aerauliques and the installations of mechanical ventilation controlled. Lot n12: painting the contractor shall have all the work and supplies necessary for the completion of the installations, in accordance with the provisions of this consultation file, without limitation or restriction, with all the conditions of perfect completion, operation and safety. All the works must be executed with new equipment, presenting all the necessary guarantees and answering the norms in force at the time of the executhe present lot includes the following services: - all site installations specific to this lot.- the recognition of the substrates.- the reception of the supports.- the studies, the plans of apparatus, plans of layout and details of execution.- the supply and application of a smoothing compound and adhesive in the case of laying - the supply and installation of floors and walls themselves. Of the coating dans clean condition, free of glue and waste from disposal. - removal of falls, waste and packaging to a suitable treatment center. - supply of clean products for the execution of the work. Provision of samples. - production of witness surfaces, adjustments requested by the prime contractor and delivery of the works in their final state. - supply of tools and equipment. Products following prspecifications of the specifications dtu and special documents of the market.- the updates with the various contractors loads of other bodies of state interested.- the necessary preparations under the coating.- the protections of works of other bodies of state.- the connections estimated necessary by the project manager, following the intervention of other bodies of state, after the completion of the works of this lot. - the cleaning of the soils caused by the work of present lot.- the protection of these works until the reception phase.- the cleaning of these works in phase of reception.- the removal at the end of the work of the protections and packing towards a suitable treatment center.- the supply and the implementation use of all the regulatory material and all the security protections necessary for access, supply and execution of the works. - dossier of the executed works: doeen addition to the prescribed services, the company must: - lstudies and implementation plans.- studies and plans for the synthesis.- all supplies and services as defined in the cctp, as well as those provided in the common parts- all ancillary costs of equipment and hand (compensation, housing, travel, etc.), lot n13: v.r.d the works include: - the realization of the preparatory works necessary for the liberation of the rights of way for the realization of the market of the batch vrd: demolitions diverses, felling of trees, fencing, emergence and various signs, - the realization of earthworks for the creation of construction sites roads, pedestrian routes.- earthworks platforms building and retention basin; the realization of roads (including external public roads up to the snowshoeing), pedestrian routes- the implementation of a network and works for the collection and management of rainwater for thebuildings and roads, - the implementation of a network of wastewater for the sanitation of buildings, - the service of the building in drinking water, electricity, telecommunication networks within the operational perimeter, - the opening trenches for the concerned dealers (grdf), - lighting of the tracks and the pedestrian, - the establishment of the marking on the ground as well as the vertical signaling, - the realization of walls - the supply and the installation of the fences and portals, - the trlandscaped avenues, - site cleaning. Main features : the main characteristics are described in the cctp specific to each batch. Quantity or extent: the nature and extent of the work are described in the cctp specific to each lot. Useful information deadline for receipt of tenders: 30/07/2019 at 11:00 conditions of participation: the criteria are detailed in the pieces ofu walk own situation: the required references are detailed in the parts of the market economic and financial capacity - references required: the required references are detailed in the parts of the market professional reference and / or technical ability - references required: the required references are detailed in the parts of the market

Documents

Tender Notice
Login to view

France Public Procurement Intelligence

Frequently asked questions

The bid deadline for Construction of a gendarmerie in the commune of sospel was 30 Jul 2019. Bidding is closed.

This tender has been issued by C.A. DE LA RIVIERA FRANCAISE in France.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 35047080. The purchaser document reference is 19-95350.

Browse other tenders from France or search by relevant keywords and CPV classification.