Executive Summary

The NORCEM AS has issued a Tender notice for the procurement of a Carbon capture and storage project at the Brevik plant - Contract C0 in the Norway. This Tender notice was published on 24 Apr 2020 and is scheduled to close on 29 May 2020, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 42428994, while the tender notice number is 2020-322915 and Register on the platform.

Key facts

Summary
Carbon capture and storage project at the Brevik plant - Contract C0
TOT Ref. No.
42428994
Document Ref. No.
2020-322915
Country
Norway
Notice type
Tender
Competition
ICB
Publication date
24 Apr 2020
Bid deadline
29 May 2020
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Tenders are invited for Carbon capture and storage project at the Brevik plant - Contract C0
Short description : The Norwegian authorities have for a long time had clear ambitions related to carbon capture and storage. Norcem Brevik together with the waste incineration plant at Klemetsrud are the two Norwegian plants that are now being considered for CO2 capture. The cement industry has large CO2 emissions. Globally, it accounts for 5-7% of the twovoice CO2 emissions (1.9 gigatons CO2 annually). In Norway, the share is 2%. Norcem Brevik emits between 820, 000 and 890, 000 tonnes of CO2 annually.Norcem, with owner HeidelbergCement, has a vision of zero emissions of CO2 from concrete products, seen from a lifecycle perspective, in 2030. To achieve this vision isit is necessary to capture CO2 from the cement production. If the measure is implemented, Norcem Brevik will become the world`s first cement plant with full-scale CO2 capture. The tests and experiences have been successful and Akers amine technology is the basis for the project. Flue gas is extracted from the factory pipe. The gas that is 100-165 degrees is cooled down to 30 degrees in a cooling tower. Sodium hydroxide (liquor) is added to remove sulfur dioxide and hydrochloric acid from the flue gas. Cooled flue gas then enters an absorber. Here, CO2 bindsto an amine solution. The CO2-rich amine solution is then pumped into a desorber. The temperature is raised to 120 degrees and the connection between the amine solution and CO2 is broken, and pure CO2 gas is formed. This is an energy-intensive process and residual heat from the factory is used for this heating. CO2-gassen then goes to a compressor. Here the pressure is increased and the gas switches to liquid form. Liquid CO2 is then transported to an intermediate warehouse and is ready for shipment by tanker. The gas is transported by ship to an intermediate warehouse at Kolsnes before being pumped out to a permanent warehouse in the Johansen formation south of Troll inThe North Sea. The capture plant will capture 55 tonnes of CO2 per hour, or 400, 000 tonnes a year. The capture plant will be located / built next to existing cement kiln 6. It consists of various components such as absorbers, strippers, compressors and dryers. In addition, so-calledAll boilers are being built to extract energy from Norcem`s process flue gas to power the plant. A new and higher pipe is being built, and there will be a need for rebuilding of pipe ducts for connection to trapping plants and heat exchangers. Tanks for amine and NaOH solutions are built. Sea water is to be usedcooling in the process, and therefore seawater intake is established at Sekkepiren. Pipelines from process area to intermediate storage and from intermediate storage to port / loading arm. Intermediate storage of trapped and conditioned CO2 will be established at a future warehouse ...

Documents

Tender Notice
Login to view

Similar tenders

Norway Public Procurement Intelligence

Frequently asked questions

The bid deadline for Carbon capture and storage project at the Brevik plant - Contract C0 was 29 May 2020. Bidding is closed.

This tender has been issued by NORCEM AS in Norway.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45000000 - Construction work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 42428994. The purchaser document reference is 2020-322915.

See the Similar Tenders section on this page or browse other tenders from Norway.

This tender falls under Construction and Real Estate in Norway. Suppliers in these sectors can track similar Norway tenders using CPV-based alerts.