Procurement Summary
Country: USA
Summary: C-91-152-12 - I-90 at Foster Avenue & Lawrence Avenue to Ohio
Deadline: 23 Aug 2018
Posting Date: 07 Aug 2018
Other Information
Notice Type: Tender
TOT Ref.No.: 25590751
Document Ref. No.: C-91-152-12
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Tender are invited for Phase III engineering services are required for construction inspection for the improvement of I90 at Foster Ave. & Lawrence Ave. to Ohio (Rehab of existing Kennedy Expressway Reversible Lane). The work includes, but is not limited to, rehabilitation of the Reversible Lane Access Control System (REVLAC) that allows reversible traffic flow along the Kennedy Expressway (I-90/94). Refurbishment and replacement of existing swing gates assemblies and the gate arms, replacement of existing impact restraining barriers, removal of existing DC control cabling and replacing with fiber optic cable, improvements to the nodal building power systems, including installation of new standby diesel generators, replacement of existing DC Control Power Inverter system with a new AC UPS backup system, installation of paved parking lots at nodal buildings A and E, removal of Nodal Building B, replacement of nodal building lighting, rehabilitation of nodal building HVAC systems, miscellaneous repairs to concrete, brick, etc. to each nodal building, installation of new CCTV cameras, upgrades to communications system at nodal buildings, District One headquarters, and the Rodenburg maintenance facility, removal of existing microwave communications system, replacement of the existing Programmable Logic Controller (PLC) local input/output (I/O) racks in each nodal building and headquarters. Includes the installation of remote I/O cabinets at swing gates, barriers and DMS signs, replacement of the existing operator interface panels with new computer graphic control interfaces, new fiber optic network for interconnection of each buildings PLC control network and separate network to interconnect each building and Headquarters, all incidental and collateral work necessary to complete the improvement is required.
Notes : This project requires 25% DBE participation. This solicitation has some or all federal funding, additional requirements may apply. The Complexity Factor for this project is 0.035.
Documents
Tender Notice