Tender are invited for This Project entails reconductoring Bothell-SnoKing 230kV Circuits #1 and #2 with a single high temperature low sag (HTLS) Aluminum Conductor Composite Reinforced (ACCR) conductor per phase between City Light's Bothell Substation (3912 156th SE, Bothell) dead-end structures and B03_07S (Circuit #1) and B03_10S (Circuit #2) at the SnoKing Substation (Maltby Rd and 39th Ave SE, Woodinville) corridor just south of Maltby Road for a distance of 3.1 miles. This is a furnish-and-install contract that requires the successful bidder to supply all labor, equipment and materials to complete the Project. This Project also includes to replacement of insulator assemblies, guys, tower signage and bent steel members; installation of new guys and anchors and anchor tests; modification of turning mast lattice steel structures for guy attachments; removal of certain wood poles and attached wires; installation and removal of guard structures; temporary sediment and erosion control measures; traffic control; and construction permitting.
Notes : A mandatory pre-bid meeting will be held on September 11, 2018 at 1 : 30 PM at Room 4070 Seattle Municipal Tower 700 Fifth Avenue, Seattle, WA 98104 and September 12, 2018 at 2 : 00 PM at Room 4080, Seattle Municipal Tower 700 Fifth Avenue, Seattle, WA 98104. Project Location : This Project is in unincorporated Snohomish County in Washington State running north from the SnoKing transmission corridor at approx. the intersection of Maltby Road (SR 524) and 43rd Ave SE. The line continues north generally parallel to 43rd Ave SE to Bothell Substation, belonging to City Light, for 3.1 miles. All written correspondence relating to these Bidding Documents should be addressed to : Seattle City Light 700 5th Avenue, Mailroom 2822Seattle, Washington 98104 Attn : Bikas Pande, Project Manager,
[email protected]. This project has a "prevailing wage" requirement.