Procurement Summary
Country: Switzerland
Summary: As 35 Lenzburg: Lenzburg Public Facilities, Part of the Swiss Federal Railways Sbb, Infrastructure, Expansion and Renewal Projects, Engineering, Driving Current, Mitte Region
Deadline: 30 May 2024
Posting Date: 26 Mar 2024
Other Information
Notice Type: Tender
TOT Ref.No.: 99303021
Document Ref. No.: 1403339
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45234160 - Catenary's construction works
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
As part of the SBB modernization package, the Lenzburg train station must be adapted according to the requirements of the hay. Subject and scope of the order: • Construction of the driving phases of the construction phases 1- 30 • Construction of new masts with a boom / lane holder • Construction of new ride-in-halt • rail, earth and rear lines (S+E) • Draw new rear-wheel ropes (Aldrey) in the advertised perimeter • Riding wire work in accordance with plans • New building switching positions high • With the help of work for signals and signal scope of the specialist service.
Demand/awarding authority: Swiss Federal Railways SBB, infrastructure, expansion and renewal projects, engineering, driving stream, region of Middle Business/Organizer: Swiss Federal Railways SBB, infrastructure, expansion and renewal projects, engineering, travel current, region, to HDN. by Andreas Kilchenmann, Bahnhofstrasse 12, CH-4600 Olten, Switzerland, phone: 000 00 00, email: [email protected], url www.sbb.ch
Publish Date: 25.03.2024
Procurement object
2.1 Type of the construction application: execution
2.2 Project title of procurement: AS 35 Lenzburg: Lenzburg public facilities, part of the driving current
2.3 File number / project number: 1161183
2.4 Division in lots?: No
2.5 Community vocabulary:
2.6 The subject and scope of the order: As part of the SBB modernization package, the Lenzburg train station must be adapted according to the requirements of the hay. Subject and scope of the order: • Construction of the driving phases of the construction phases 1- 30 • Construction of new masts with a boom / lane holder • Construction of new ride-in-halt • rail, earth and rear lines (S+E) • Draw new rear-wheel ropes (Aldrey) in the advertised perimeter • Riding wire work in accordance with plans • New building switching positions high • With the help of work for signals and signal structures from the specialist service Safety systems • Assembly of lighting on track masts • Demolition of existing lines, ground ropes, according to the project perimeter in the station area • Abort switching post
2.7 Place of ...
Documents
Tender Notice