Expired Tender Hungary ICB TOT Ref. 15499550

A lump-sum flat-rate contract is the Bridge Tender - 15499550

Tender notice from Hungary, published on 08 Aug 2017.

Executive Summary

The NIF ZRT. has issued a Tender notice for the procurement of a A lump-sum flat-rate contract is the Bridge Reconstruction Program I / 1. Phase railway bridge reconstruction - Part 3 in the Hungary. This Tender notice was published on 08 Aug 2017 and is scheduled to close on 18 Aug 2017, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 15499550, while the tender notice number is 11143/2017 and Register on the platform.

Key facts

Summary
A lump-sum flat-rate contract is the Bridge Reconstruction Program I / 1. Phase railway bridge reconstruction - Part 3
TOT Ref. No.
15499550
Document Ref. No.
11143/2017
Country
Hungary
Notice type
Tender
Competition
ICB
Publication date
08 Aug 2017
Bid deadline
18 Aug 2017
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
European Union (EU)

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Title:- A lump-sum flat-rate contract is the Bridge Reconstruction Program I / 1. Phase railway bridge reconstruction - Part 3
Description:Part 3: Railway Route No. 40 Reconstruction of Pincehely, Kapos Bridge: The task to be carried out under this call is to complete the 40th. Budapest-Kelenfld - Dombvr railway line with national public roads 1102 23 reconstruction of the railway bridge in Budapest. The existing trussed steel structure over the Kapos River, egYenes crosses the single-track, standard gauge (1435 mm) crushed stone superstructure with an open section. The existing bridge currently has a bridging superstructure system. The task is to break down, cut and transport existing bridges, "A" and "B". Reinforcing the bridgeheads to the required filling strengthWith anchorage, pile foundation, new demolition site with 37, 1 m opening, roof railing, orthotropic floorboard, corrosion-coated bridge construction site. Railway construction work (track, overhead line, telecommunications, light-weight control) must be carried out as part of bridge reconstructionFiber optic cable structure, etc. Dismantling, demolition and restoration, replacement if necessary), development / reinforcement of access routes between the construction site and the national or local public road network, and the establishment of the construction sites, Timetables, telecommunication and power plants, which may be necessary for the execution of the project.Controlled railway line: Budapest-Kelenfld - Dombvr railroad crossing section: 1102 23 hm- number of tracks: 1 railroad corridor szInt: 103.36 mBf.- altitude line: 0 ‰ - horizontal line: straight line system: 60-track track construction 60 system: 75 vfm- machine track construction 54 system: 263 vfm- bridge construction railway track Length: 338.0 vfm- bedding planting: 700 vfm-Construction of a fiber optic cable (protection and repositioning), laying down in the ground twin LPE pipe: 235 m- construction of a fiber optic cable (protection and repositioning), mounted on a top conductor pole: 210 barrier barrier: Kapos river crossing section: 10097.00 fkm- bottom level: 94.50 mBf.- bottom width: 5.00 m- sloping bend: 1: 2, 0Technical mechanics: For the exact location of the excavations, detailed stratification and test results, see Volume 5, Geotechnics. Bridge details: - Free opening: 37.10 m - Structure length: 39.20 m - BridgeWidth: 8, 34 m - Length: 0, 0 ‰ - Foundation: "A" j. Bridgehead: reinforcement of an existing ski hat with a piece of pile- "B" j. Bridgehead: reinforcement of an existing ski hat with pinnacle Feeder: lattice mainstay orthotropic sliding steel steel work areaWith the winning bidder - the 322/2015. (X.30) Kr. Article 14 (1) Planning tasks not covered by b): Preparation of implementation plans; Creating a realization map; Preparation of operating and maintenance manuals; Teac...

Documents

Tender Notice
Login to view

Hungary Public Procurement Intelligence

Frequently asked questions

The bid deadline for A lump-sum flat-rate contract is the Bridge Reconstruction Program I / 1. Phase railway bridge reconstruction - Part 3 was 18 Aug 2017. Bidding is closed.

This tender has been issued by NIF ZRT. in Hungary.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is financed by European Union (EU).

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 15499550. The purchaser document reference is 11143/2017.

Browse other tenders from Hungary or search by relevant keywords and CPV classification.