The RM of Sherwood No. 159 (RM) encompasses the City of Regina and includes a variety of industries from farming and manufacturing to tourism. The RM is in the heart of the prairie farming industry, whereby the majority of the land base in the RM is agricultural land. Heavy clay soil characterizes the area as one of the richest farming pockets in the province. The RM of Sherwood No. 159 is seeking Proposals for the supply and application of a dust suppressant on various gravel roads within the RM of Sherwood No. 159. The RM has, in the past, used a liquid magnesium chloride formula as a dust suppressant. Scope of Proposal The RM will be open to proposals that will provide a dust suppressant that will meet the needs of the RM, be environmentally friendly, provide some type of soil stabilization, be easy to apply, control dust for a long period of time and be within our budget. This request for proposal (RFP) is for the provision of all labor, materials, tools, equipment, and supervision required to supply, transport, and apply a dust suppressant on approximately 10, 400 meters of gravel roads within the RM of Sherwood No. 159 for 2026 to be known as the “work”. Work will be on an "as needed and when requested" basis agreed to by both parties.
Solicitation Type : RFP - Request for Proposal (Formal) Reference Number : 00004885392 Location : Saskatchewan Purchase Type : Not Stated Dates Publication : 2026/02/02 09:52:00 AM EST Closing Date : 2026/02/19 03:00:00 PM EST Contact Information : Joe McKay : 306-985-9366 :
[email protected] : Description : The RM of Sherwood No. 159 (RM) encompasses the City of Regina and includes a variety of industries from farming and manufacturing to tourism. The RM is in the heart of the prairie farming industry, whereby the majority of the land base in the RM is agricultural land. Heavy clay soil characterizes the area as one of the richest farming pockets in the province. The RM of Sherwood No. 159 is seeking Proposals for the supply and application of a dust suppressant on various gravel roads within the RM of Sherwood No. 159. The RM has, in the past, used a liquid magnesium chloride formula as a dust suppressant. Scope of Proposal The RM will be open to proposals that will provide a dust suppressant that will meet the needs of the RM, be environmentally friendly, provide some type of soil stabilization, be easy to apply, control dust for a long period of time and be within our budget. This request for proposal (RFP) is for the provision of all labor, materials, tools, equipment, and supervision required to supply, transport, and apply a dust suppressant on approximately 10, 400 meters of gravel roads within the RM of Sherwood No. 1...