Cross Icon
Cross Icon

The System Design Manufacturing Testing Supply Tender - 4646224

Indian Oil Corporation Limited, IBP Kolkata has floated a tender for The System Design Manufacturing Testing Supply Installation and Commissioning of Plant and Machinery Oxidizer Blend Tank including Charging Platform and Shed at Site Mixed Bulk Explosives Support Plant at Talcher Dist Angul Odisha. The project location is , , India. The reference number is BGE/PM/BT/TAL/1516 and it is closing on 04 Jan 2016. Suppliers can request Register free of cost to get the complete Tender details and download the document.

Expired Tender

Procurement Summary

State: -

Summary: The System Design Manufacturing Testing Supply Installation and Commissioning of Plant and Machinery Oxidizer Blend Tank including Charging Platform and Shed at Site Mixed Bulk Explosives Support Plant at Talcher Dist Angul Odisha

Deadline: 04 Jan 2016

Posting Date: 12 Dec 2015

Other Information

Notice Type: Tender

TOT Ref.No.: 4646224

Document Ref. No.: BGE/PM/BT/TAL/1516

Financier: Self Financed

Purchaser Ownership: -

Document Fees: Refer Document

Tender Value: Refer Document

EMD: Refer Document

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_details

Login to see details

Tender Details

The System Design Manufacturing Testing Supply Installation and Commissioning of Plant and Machinery Oxidizer Blend Tank including Charging Platform and Shed at Site Mixed Bulk Explosives Support Plant at Talcher Dist Angul Odisha, The System Design Manufacturing Testing Supply Installation and Commissioning of Plant and Machinery Oxidizer Blend Tank including Charging Platform and Shed at Site Mixed Bulk Explosives Support Plant at Talcher Dist Angul Odisha

Tender Fee(INR):

EMD Amount (INR): 53, 000

Tender Value: Not Indicated

Documents

 Tender Notice


Request Demo
GiZ Tenders India