Login
Register
Complete Your Profile
Change Password
Request a Password Reset
Download Documents
Download Documents
Get Help to Participate in This Tender
Change Password
For better security, update the account password.
The CORPORATE OFFICE, GURGAON has issued a Tender notice for the procurement of a Supply Installation testing and commissioning of Hybrid Roof top Solar power plant, Qty: 9 in the India.The project location is Bangalore, Karnataka, India. This Tender notice was published on 24 Nov 2026 and is scheduled to close on 24 Dec 2026, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 152955492 and Register on the platform.
Purchaser contact is for registered users
Login to see detailsTender details are for registered users
Login to see details| # | Title | Description | Qty | Unit | Delivery (Days) |
|---|---|---|---|---|---|
| 1 | Hybrid Roof top Solar power plant | Supply Installation testing and commissioning of Hybrid Roof top Solar power plant as per TS and Scope of works | 1 | set | 90 |
| 2 | Supply Installation testing and commissioning including cable termination of Junction Panel Junction Box With suitable rating | Supply Installation testing and commissioning including cable termination of Junction Panel-Junction Box With suitable rating Mccb 4Pole 36Ka Tm Based Release Speder Link, Input And Output Busbar Set 30X10 Copper Rybn- Powder Coated Siemens Gray 7032 Panel Indication Lamp On Off Trip and Ryb Control Mcb Wire Accessories and Panel Acessories as per Direction of EIC | 1 | EA | 90 |
| 3 | Supply Installation testing and commissioning including cable termination of ATS Change Over Panel | Supply Installation testing and commissioning including cable termination of ATS Change Over Panel- 200A ATS Motorized Change Over Switch 4 Pole 240V Ac With ASR Controlller With Interlock Logic Auto/Manual Operation 1 Input 1 Output Shall take status only of supply of Solar Source and Should ON/Off in Auto mode Outgoing Mccb 1Nos 250A 4Pole 36Ka Mccb With Speder Link Source 1 and Source 2 30X10 Copper Busbar Set Onn Off Trip Ryb Indication Lamp Control Mcb Panel Accessories and Wire Accessories Powder Coated Panel 7032 Siemens Grey as per Direction of EIC | 1 | EA | 90 |
| 4 | Dismantling and shifting of existing solar water heater supply | Dismantling and shifting of existing solar water heater supply and laying of AC armoured cables providing proper ventilation for Battery inverter etc to be kept in ACDB room Supply and installation of battery racks and carrying out all other miscellaneous works necessary for completion of the project scope ensuring satisfactory performance of the system and compliance with the instructions of the EngineerinCharge | 1 | LS | 90 |
| 5 | Non Comprehensive AMC for 1st year as per TS | Non Comprehensive AMC for 1st year as per TS | 1 | EA | 455 |
| 6 | Non Comprehensive AMC for 2nd year as per TS | Non Comprehensive AMC for 2nd year as per TS | 1 | EA | 820 |
| 7 | Non Comprehensive AMC for 3rd year as per TS | Non Comprehensive AMC for 3rd year as per TS | 1 | EA | 1185 |
| 8 | Non Comprehensive AMC for 4th year as per TS | Non Comprehensive AMC for 4th year as per TS | 1 | EA | 1550 |
| 9 | Non Comprehensive AMC for 5th year as per TS | Non Comprehensive AMC for 5th year as per TS | 1 | EA | 1915 |
| Tender | State | TOT Ref. No. | Bid deadline |
|---|---|---|---|
| Automatic Rail Id Printing System in Rsm | Chhattisgarh | 152956832 | 15 Dec 2026 |
| Ceramic Resistor for Woodward Governor to Woodward Part No. 5433665 [ Warranty P Eriod: 18 Months after the Date of Delivery ] ] 媴媴 of 8 Run Date/Time: 24/11/2026 13:10:47 Stores/South Western Rly... | Karnataka | 152956831 | 11 Jan 2027 |
| Upholstery Fabric for Seat Cushions | Maharashtra | 152956830 | 30 Dec 2026 |
| Varnish for Coil Moulding | Telangana | 152956829 | 29 Dec 2026 |
| Power Capacitor Bank | Telangana | 152956828 | 29 Dec 2026 |