Open for bids Tender India NCB TOT Ref. 151611721

Supply installation and commissioning of Plante Tender - 151611721

Tender notice from India, published on 29 Oct 2026.

Executive Summary

The DIRECTORATE OF PURCHASE AND STORES, DAE has issued a Tender notice for the procurement of a Supply installation and commissioning of Plante type 645 AH battery banks for FBTR, Qty: 65 in the India.The project location is Kanchipuram, Tamil Nadu, India. This Tender notice was published on 29 Oct 2026 and is scheduled to close on 19 Nov 2026, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 151611721 and Register on the platform.

Key facts

Summary
Supply installation and commissioning of Plante type 645 AH battery banks for FBTR, Qty: 65
TOT Ref. No.
151611721
Document Ref. No.
Login to see
State
Tamil Nadu
Notice type
Tender
Competition
NCB
Publication date
29 Oct 2026
Bid deadline
19 Nov 2026
EMD
94000
Tender value
Refer Document
Purchaser ownership
Public
Procurement Type
Goods
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Tender details are for registered users

Login to see details

Documents

Tender Notice
Login to view
Bid_Document_10087814.pdf
Login to view
Specification_Document.pdf
Login to view
BOQ_Document.csv
Login to view

Bill of Quantities (BOQ)

# Title Description Qty Unit Delivery (Days)
1 Removal and dismantling of existing Ms EXIDE make 48 V DC battery bank consisting of 23 nos. of 2 V, 645 AH YHP -13 Plante type lead acid battery cells. Removal and dismantling of existing Ms EXIDE make 48 V DC battery bank consisting of 23 nos. of 2 V, 645 AH YHP -13 Plante type lead acid battery cells. The work includes disconnection of intercell,inter tier connectors and cables, draining the electrolyte from the cells into PVC carboys and removal of cells from the seismically qualified stands in the battery room of FBTR. 2 set 300
2 Shifting of PVC carboys containing drained old electrolyte from battery room to FBTR DM plant for neutralizing, Neutralizing the electrolyte and safe disposal. Shifting of PVC carboys containing drained old electrolyte from battery room to FBTR DM plant for neutralizing, Neutralizing the electrolyte and safe disposal. 2 set 300
3 Supply of 48 V DC Battery bank consisting of 23 Nos of 2 V, 645 AH, C 10 rated, Plante Lead Acid batteries in SAN polymer container. Purchase is through buyback agreement only. Supply of 48 V DC Battery bank consisting of 23 Nos of 2 V, 645 AH, C 10 rated, Plante Lead Acid batteries in SAN polymer container along with complete accessories like links, inter cell connectors, inter tier cables, bolts and nuts with washers and petroleum jelly for the cells. Purchase is through buyback agreement only. 2 set 300
4 Supply of Electrolyte 26.4 ltrs of Sulphuric acid per cell for 645 AH, 48 V DC battery bank Supply of Electrolyte 26.4 ltrs of Sulphuric acid per cell for 645 AH, 48 V DC battery bank 2 set 300
5 Supply of Spare 2 V, 645 AH dry cells Supply of Spare 2 V, 645 AH dry cells 4 nos 300
6 Supply of Spare electrolyte 26.4 ltrs of Sulphuric acid per cell for 4 nos of spare dry cells Supply of Spare electrolyte 26.4 ltrs of Sulphuric acid per cell for 4 nos of spare dry cells 1 set 300
7 Supply and replacement of plywood base plates suitable for the above 645 AH cells Supply and replacement of plywood base plates suitable for the above 645 AH cells 50 nos 300
8 Complete erection, installation and commissioning, commissioning testing and handing over the new battery banks to FBTR. Complete erection, installation and commissioning, commissioning testing and handing over the new battery banks to FBTR. 2 set 300

Similar tenders

India Public Procurement Intelligence

Frequently asked questions

The last date to submit a bid for Supply installation and commissioning of Plante type 645 AH battery banks for FBTR, Qty: 65 is 19 Nov 2026. Submit before this date to be considered.

This tender has been issued by DIRECTORATE OF PURCHASE AND STORES, DAE in India.

The tender value is not disclosed; please refer to the tender document. The EMD / bid security is ₹94000.

This tender is Self Financed

This is a Goods procurement tender issued as a public sector opportunity in India.

The tender is classified under the following CPV code(s): 31440000 - Batteries.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 151611721. The purchaser document reference is available after login.

See the Similar Tenders section on this page or browse other tenders from India.

This tender falls under Technology and Equipment in India. Suppliers in these sectors can track similar India tenders using CPV-based alerts.