Procurement Summary
State: Gujarat
Summary: Long Lead Items, Long Lead Items- Well Construction- all Tangibles Required to Construct the Well as Per Sow (Surface and Subsurface/Wellbore) Inclusive but not Limite... (Quantity Required: 3 Lumpsum per Well)
Deadline: 27 Oct 2022
Posting Date: 06 Oct 2022
Other Information
Notice Type: Tender
TOT Ref.No.: 72714358
Document Ref. No.: GEM/2022/B/2611986
Financier: Self Financed
Purchaser Ownership: Public
Document Fees: Refer Document
Tender Value: Refer Document
EMD: ₹ 1000000
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Item Description: LONG LEAD ITEMS- Well Construction- All tangibles required to Construct the well as per SoW (surface and subsurface/wellbore) inclusive but not limited to Oil Country Tubular Goods (OCTG) and related accesories, X-MasTrees, Well Heads, Hangers and related accessories, Spares etc. (also Refer Clause 17.5 of SCC)
Long Lead Items, Consumables, ODR for Associated Drilling Services, ODR for Drilling Rig, Mob-Demob Charges for Integrated Drilling Services, ILM for Integrated Drilling Services, ODR for Integrated Testing Services, Mob-Demob Charges for Integrated Testing Services, ILM for Integrated Testing Services, Waste Management Services, Optional Drilling and Completion Fluid, Optional Cement Slurry, Mob-Demob Charges- Formation MDT, Operating Charges- Formation MDT, Mob-Demob Charges- Dual Packer, Operating Charges-Dual Packer, Mob-Demob Charges- Nuclear Magentic Resonance, Operating Charges-Nuclear Magnetic Resonance, Mob-Demob Charges- Resistivity Imager, Operating Charges-Resistivity Imager, Mob-Demob Charges- Dipole Sonic Imager, Operating Charges-Dipole Sonic Imager, Mob-Demob Charges- Free Point Indicator and Backoff Services, Operating Charges-Free Point Indicator and Backoff Services, Mob-Demob Charges- Severing and Colliding Tools, Operating Charges-Severing and Colliding Tools, Mob-Demob Charges- Tubing Cutter Services and Drill Pipe Cutting Services, Operating Charges-Tubing Cutter Services and Drill Pipe Cutting Services, Mob-Demob Charges- Drill Pipe and Tubing Puncture Services, Operating Charges-Drill Pipe and Tubing Puncture Services, Mob-Demob Charges- Wireline Casing Gun Perforation, Operating Charges-Wireline Casing Gun Perforation, Mob-Demob Charges- Setting Tool- Bridge Plug, Operating Charges-Setting Tool- Bridge Plug, Mob-Demob Charges- Setting Tool- Retainer Packer, Operating Charges- Setting Tool- Retainer Packer, Mob-Demob Charges- Setting Tool- Junk Basket, Operating Charges-Setting Tool- Junk Basket BOQ Title Integrated Project Management Services for Drilling and Testing of Exploratory Wells
Item Title: Long Lead Items
Item Quantity: 3
Unit of Measure: Lumpsum per Well
Delivery Period (In number of days): 150
Start Date: 06-10-2022 07:21 PM
End Date: 27-10-2022 07:00 PM
EMD Amount: 1000000
Documents
Tender Notice
Bid_Document_3869203.pdf
Specification_Document.pdf
BOQ_Document.csv