Procurement Summary
Country: Germany
Summary: Zfb - New Construction of a Center for Fire Services and Civil Protection
Deadline: 11 Aug 2026
Posting Date: 13 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145037403
Document Ref. No.: 480796-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45231300 - Construction work for water and sewage pipelines
45232460 - Sanitary works
45251143 - Compressed-air generating plant construction work
45332000 - Plumbing and drain-laying work
45332200 - Water plumbing work
45332300 - Drain-laying work
45332400 - Sanitary fixture installation work
45343200 - Firefighting equipment installation work
51134000 - Installation services of compressors
35111300 - Fire extinguishers
35111320 - Portable fire-extinguishers
39360000 - Sealing equipment
39370000 - Water installations
39715300 - Plumbing equipment
42123400 - Air compressors
42123610 - Compressed-air package
42130000 - Taps, cocks, valves and similar appliances
42131000 - Taps, cocks and valves
42131400 - Sanitary taps, cocks
44163111 - Drain pipes
44411100 - Taps
44411300 - Washbasins
44411700 - Lavatory seats, covers, bowls and cisterns
44411800 - Urinals
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Waste water/water/gas systems (VE4010) Waste water/water/gas systems (VE4010) As the project sponsor, the Dithmarschen district is planning to build a new center for fire services and civil protection (ZFB) in the municipality of Hemmingstedt. All roofs come with one Minimum gradient of 2% carried out. Roof drains are provided at the low points. The emergency drainage is largely implemented via Speier. Rain drainage includes a total of: •59 flat roof drains (main and emergency drainage) •approx. 1, 000 m Rainwater pipe including fittings and connecting parts The wastewater from the vehicle halls is collected via heavy-duty channels. The waste water generated by the sanitary facilities of the main building is collected in collecting pipes. The waste water drainage includes total: •181 m drainage channel •677 m wastewater pipe DN 40 - DN 125 All consumers (sanitary objects) are connected to the drinking water network. Irrigation includes: •1, 675 m stainless steel pipe including fittings and connecting parts, as well Insulation •58 pieces of shut-off valves •3 pcs boot washing systems •32 pcs washbasin systems •24 hour toilet facilities •22 shower facilities •Connections to cleaning cabin and hose care systems Fire extinguishers will be provided in hallway areas. The fire extinguishing systems include a total of: •70 fire extinguishers Compressed air compressors are provided to supply compressed air to the workshop areas. The compressed air supply includes a total of: •7 pcs compressed air stations •850 m of pipe...
Document Type: Contract Notice Contract Type: works Authority Type: la Doc Title: ZFB - New construction of a center for fire services and civil protection Dispatch Date: 2026-07-09 Publish Date: 2026-07-13 Submission Date: 2026-08-11
Documents
Tender Notice