Procurement Summary
Country: Germany
Summary: Wildpark Waterworks - New Replacement Filter Hall - Lot 1 Civil Engineering + Lot 2 Process Engineering
Deadline: 09 Sep 2026
Posting Date: 06 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146651931
Document Ref. No.: 544548-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45200000 - Works for complete or part construction and civil engineering work
45240000 - Construction work for water projects
45220000 - Engineering works and construction works
45232430 - Water-treatment work
45252120 - Water-treatment plant construction work
45252126 - Drinking-water treatment plant construction work
65120000 - Operation of a water-purification plant
65130000 - Operation of water supplies
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
LOT 1 - Civil engineering LOT 2 - Process engineering The Wildpark Potsdam waterworks (operator: Energie und Wasser Potsdam GmbH) is used to treat and supply drinking water in the Potsdam area. As part of the modernization of the processing plant, the... existing open filter hall will be replaced by a new two-stage closed filter hall (pressure filter system). The middle part of the building (open filter hall, built in the 1930s) will be demolished. The replacement new building is being built between the remaining ones Existing buildings of the closed filter hall and the machine house, which must remain in operation throughout the entire construction project. The overall measure consists of several awards. There were preparatory measures and a temporary one Processing plant already published/awarded. The main measure consists of the present award (Lot 1 Civil Engineering and Lot 2 Plant Engineering) as well as a further award for EMSR technology, which will be published at a later date should. The task is to replace the open filter system with a two-stage, closed filter system while simultaneously increasing the processing capacity. The new processing plant - the new partial stream or the new processing line - is for the The following flow rates are designed: Qh, max = 280 m³/h Qh, average = 250 m³/h (5, 500 m³/d over 22 h/d) It should be noted that the prospective requirement of this road of up to 5, 500 m³/d is only for a few weeks a year...
Document Type: Contract Notice Reference Number: 260730_EWP_BW_08 Contract Type: works Authority Type: pub-undert Doc Title: Wildpark waterworks - new replacement filter hall - LOT 1 civil engineering + LOT 2 process engineering Dispatch Date: 2026-08-05 Publish date: 2026-08-06 Submission Date: 2026-09-09
Documents
Tender Notice