Procurement Summary
Country: Germany
Summary: Voek 202-26 Forest Road Construction Bfb Middle Elbe
Deadline: 01 Jul 2026
Posting Date: 02 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 142461287
Document Ref. No.: VOEK 202-26
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Lot 1 The Central Elbe Federal Forestry Agency plans to repair forest roads including the delivery of road construction materials in the Raguhn district. The plan is to eliminate lanes and remove paths, as well as profiling and partially supplementing or Repair of the base layer in some areas. Processing with a grader, excavator and vibratory roller is useful. When installing additional new material, natural stone, such as rhyolite, should be used. Initial situation: It is about various path sections to be worked on with a total length of 2, 550 running meters. During the course of timber harvesting and timber removal, slight to moderate damage occurred to the paths being worked on. Lot 2 At the Federal Forestry Agency Middle Elbe is in the Hohes Holz natural heritage area, the expansion of a road in the Hakengrube area is planned. This should be expanded and secured. Processing with a grader and vibratory roller is useful. A new one will also be installed Path material. Initial situation: This is a section of path to be worked on with a total length of 250 running meters. In places, trees grow into the path. This will be cut back before the path construction work begins. In the section of the path There is mostly still an old layer of gravel. This is over-earthed and not always recognizable. When it is wet, the path “greases” due to the loess layer and is difficult to drive on by car, and “tracks” form. About half of the This section of the path is very slightly uphill. Moisture collects in the deepest area. Water cuts/sinks should be created next to the road body into which the water can be drained. When building the path, the subgrade should be pushed. Pointed gutters should be built on both sides of the path to keep the water out of the path. A combined base/cover layer should be installed, profiled and compacted...
Type of procedure: Road repair Federal Forestry Agency Middle Elbe Lot 1 Repair and maintenance of forest roads in the Raguhn district Lot 2 Repair of forest roads NNE Hohes Holz - Snake pit district Lot...
Documents
Tender Notice