Procurement Summary
Country: Germany
Summary: Ventilation Systems
Deadline: 26 May 2026
Posting Date: 23 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140005766
Document Ref. No.: 278619-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45331000 - Heating, ventilation and air-conditioning installation work
45331210 - Ventilation installation work
45331221 - Partial air-conditioning installation work
45321000 - Thermal insulation work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Ventilation systems The central ventilation system is set up outdoors and has a heating and cooling register, which is connected to a glycol network by the heating/cooling department, and a humidifier that runs on demineralized water from the plumbing department is supplied. The outside air intake and exhaust air are also carried out outside. The ventilation network enters the middle wing and the new building on the ground floor. From there, the network is distributed on the ground floor and in the control center rooms on the 1st and 2nd floors. OG. The supply air is kept at 22 °C all year round. The air is distributed in the rooms via plate valves or swirl outlets. Floor displacement air outlets are also used in the operational control rooms, which ensure a particularly low air temperature ensure the inflow. The ventilation ducts must be made of galvanized sheet steel. The insulation and fire protection of the system components are also part of the contracting entity's scope of services. The supply air ducts are also insulated Mineral wool, the exhaust air remains uninsulated. All penetrations into fire protection walls must be carried out with tested fire protection flaps and pressed in professionally. In the operations control rooms with floor heights of up to approx. 5.5 m, the installation is on the Ceiling provided. In addition to the central ventilation system, further decentralized systems are planned: The exhaust air from two battery rooms is led out of the side of the building. The control of the air conditioning system...
Document Type: Contract Notice Reference Number: VE_02.05_RLT Contract Type: works Authority Type: body-pl-la Doc Title: Lüftungsanlagen Dispatch Date: 2026-04-22 Publish Date: 2026-04-23 Submission Date: 2026-05-26
Documents
Tender Notice