Procurement Summary
Country: Germany
Summary: Traffic System Planning (Lot 1) and Overall Bim Coordination (Lot 2)
Deadline: 21 Apr 2026
Posting Date: 13 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 137724604
Document Ref. No.: 177314-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71322500 - Engineering-design services for traffic installations
71000000 - Architectural, construction, engineering and inspection services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Traffic system planning (Lot 1) and overall BIM coordination (Lot 2) Lot 1 traffic system planning Planning of the traffic systems in the construction and final state according to HOAI for service phases 1, 2, 3, 5 and 6 as well as planning of the traffic routing during construction Replacement construction of six motorway bridges as part of the bridge modernization program in the area of the Munich-Nord motorway junction (AK) (BAB 99 / BAB 9). The planned project is an entertainment measure within the meaning of Section 4 FStrG, without that the existing situation is changed within the meaning of Section 17 Paragraph 1 Sentence 2 of the Federal Highway Act (FStG). The planning services for the replacement construction of six motorway bridges are under Implementation of the BIM methodology (Building Information Modeling). Lot 2 BIM overall coordination Planning the traffic systems in construction and final state according to HOAI for service phases 1, 2, 3, 5 and 6 as well as planning the traffic routing during construction for the replacement construction of six motorway bridges as part of the Bridge modernization program in the area of the Munich-Nord motorway junction (AK) (BAB 99 / BAB 9). The planned project is a maintenance measure within the meaning of Section 4 FStrG, without affecting the existing situation within the meaning of Section 17 Paragraph 1 Sentence 2 Federal Highway Act (FStG) is changed. The planning services for the replacement construction of six motorway bridges are under Implementation of the BIM methodology (Building Information Modeling). Doc Title: Traffic system planning (L...
Document Type: Contract Notice Reference Number: A0183000015 Contract Type: services Authority Type: pub-undert Doc Title: Traffic facility planning (Lot 1) and BIM overall coordination (Lot 2) Dispatch Date: 2026-03-12 Publish Date: 2026-03-13 Submission date: 2026-04-21
Documents
Tender Notice