Procurement Summary
Country: Germany
Summary: Tender for Earthworks, Civil Engineering and Road Construction Work to Create Bus Parking Spaces and Charging Infrastructure at the Uetersen Depot of the Kreisverkehrsgesellschaft in Pinneberg Mbh (Kvip)
Deadline: 21 Apr 2026
Posting Date: 18 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138030840
Document Ref. No.: LOT-0001 E48168196
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The Kreisverkehrsgesellschaft in Pinneberg mbH (KViP) is planning to expand the bus depot in Uetersen as part of the ongoing electrification of the bus fleet. The aim of the measure is to expand the parking areas and the charging infrastructure for Electric buses. Currently, a total of 27 new charging points are to be built in addition to the existing seven charging points. For this purpose, new bus parking spaces will be created and the existing courtyard areas will be partially converted. To ensure the For energy supply, a technical center with a medium-voltage transfer station, transformers and low-voltage switchgear will be built. The construction and equipment of the energy center and the delivery of the charging stations are not part of this Tender. The electrical connection to the charging points is carried out via newly laid medium and low voltage cables as well as control and communication lines, which are routed in an underground supply channel system. The one advertised here Construction measures include the following services in particular: - Expansion and conversion of traffic and parking areas for buses, including paving work - Construction of a total of 27 foundations for charging facilities - Construction of an underground Supply canal system for energy and control lines - Creation and expansion of rainwater drainage including an underground trench system for rain retention - New construction and adaptation of street drains and rainwater pipes - Manufacture of foundations for street lighting poles and implementation of existing lights - Adaptation and coordination of existing supply lines in coordination with the utility providers - Civil engineering work for electrical infrastructure - The Drainage of the traffic areas continues to take place in the separation system. To improve rain retention, the existing system will be supplemented by an underground trench system. Construction will be carried out in several phases...
Documents
Tender Notice