Procurement Summary
Country: Germany
Summary: Technical Equipment Hls, System Groups 1 to 3, Service Phases 1-9, System Group 8: Service Phases 5, 8 in Accordance with Paragraphs 55 Ff. Hoai
Deadline: 22 Apr 2026
Posting Date: 14 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139503158
Document Ref. No.: 253583-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71300000 - Engineering services
71320000 - Engineering design services
71321200 - Heating-system design services
71321300 - Plumbing consultancy services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Technical equipment HLS, system groups 1 to 3, service phases 1-9, system group 8: service phases 5, 8 in accordance with paragraphs 55 ff. HOAI The women's shelter KARLA51 is located in the property at Karlstrasse 51. This is the owner of the facility and the tenant Evangelical Relief Organization Munich Non-Profit GmbH. The building has a total of 6 floors with an attic - 40 individual apartments, office space and common rooms. The building (built in 1957) was renovated in 1985 and an extension (winter garden) was added in 2005 and connected to the district heating network. The property is not inhabited during the construction work. The main construction project includes the conversion of existing bathrooms including a complete renovation of the HLSE, partial modernization measures, conversion of office and Common areas, possible changes of use as well as general maintenance measures and elimination of fire protection and other construction defects. Doc Title: Technical equipment HLS, system groups 1 to 3, service phases 1-9, system group 8: Service phases 5, 8 in accordance with paragraphs 55 ff. HOAI Contract Type: services
Document Type: Contract Notice Reference Number: 2026_219_VgV_HLS_KARLA51_prv Contract Type: services Authority Type: pub-undert Doc Title: Technical equipment HLS, system groups 1 to 3, performance phases 1-9, system group 8: performance phases 5, 8 acc. Paragraphen 55 ff. HOAI Dispatch Date: 2026-04-13 Publish Date: 2026-04-14 Submission Date: 2026-04-22
Documents
Tender Notice