Procurement Summary
Country : Mali
Summary : Technical and Financial Rehabilitation Works of Realization of High Court of Koulikoro - Koulikoro Region
Deadline : 26 Jul 2019
Other Information
Notice Type : Tender
TOT Ref.No.: 34612157
Document Ref. No. : 03072019-01/USAID/MJP
Competition : ICB
Financier : United States Agency for International Development (USAID)
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : CHECCHI COMPANY AND CONSULTING (CHECCHI)
Mali
Tel: +223-91956313
Attn: Jonas Dougnon
Mali
Email :jdougnon@checchiconsulting.com
Tender Details
Tenders are invited for Technical and Financial Rehabilitation Works of Realization of the High Court of Koulikoro - Koulikoro Region.
Description
The MJP is looking for a company for the various renovation works of the Koulikoro TGI, the detailed specifications of which are attached.
The other party must formally agree to:
- work under the supervision of a certified works inspector, designated by the MJP Project;
- certify that the paints used do not contain lead and that none of the materials used contain asbestos;
- provide protective equipment for workers (helmets, gloves, work shoes);
- organize an information session at the opening of the project on the risks of HIV / AIDS;
- organize secure storage of flammable material and chemical compounds;
- provide a specific location and approved by the Municipality of Bamako for the disposal of waste;
- put a first aid kit at the disposal of site personnel;
- install an access control to the building site, idle guard and markup to secure the work site;
- limit access to the site to authorized persons only;
- provide complete and detailed information on his physical address, business name and situation with regard to his fiscal and social obligations (presentation of the tender documents);
- provide the contacts of three previous significant customers as a reference;
- provide a detailed organization chart of the company, the curriculum vitae of its management, its previous references with significant international or local structures, its tax and social book;
- provide a guarantee of completion of works equal to 5% of the amount HT of the works certified by a banking institution;
- provide a precise chronogram of the work, from the receipt of the service order;
- provide the detailed and valued list of materials and materials that will be acquired on the advance of funds requested from the MJP for the start of work;
- provide professional insurance guaranteeing the envisaged works, the places and the equipment in place and the personnel of the company.
Lot 1: OFFICE OF THE PRESIDENT
F / P Luxe plaster on the walls
F / P of Paint on walls and ceiling
F / P of Padded Door with Groom
F / P power outlet
F / P grate lamp 1, 20
F / P Full English Toilet Bowl
F / P wash basin in full
F / P full shower column
F / P Towel holder, soap dish, coat rack, toilet paper
Carpet Removal and Floor Cleaning
F / P Carpet Floor Quality
F / P 2.5 HP SPLIT air conditioner
F / P Office furniture (Visitor chairs work table)
Lot 2: SECRETARIAT OF THE PRESIDENT
F / P Painting on walls and ceiling with all subjections
F / P outlets
F / P single ignition switch
F / P grate lamp 1, 20
F / P SPLIT 1, 5 HP air conditioner
F / P Office furniture (Visitor chairs work table)
Lot 3: OFFICE OF THE PROSECUTOR
F / P Luxe plaster on the walls
F / P of Paint on walls and ceiling
F / P of Padded Door with Groom
F / P outlets
F / P grate lamp 1, 20
F / P Full English Toilet Bowl
F / P wash basin in full
F / P full shower column
F / P Towel holder, soap dish, coat rack, toilet paper
Carpet Removal and Floor Cleaning
F / P Floor quality carpet
F / P 2.5 HP SPLIT air conditioner
F / P Office furniture (Visitor chairs work table)
Lot 4: SECRETARIAT OF THE PROSECUTOR
F / P of Wall and Ceiling Paint
F / P power outlet
F / P single ignition switch
F / P Fixtures Grille Lamp 1, 20
F / P SPLIT 1, 5 HP air conditioner
F / P Office furniture (Visitor chairs work table)
Lot 5: LOST ROOM
Garden landscaping (patio)
F / P Metal Benches to be fixed on the ground
Painting retouch of hall and corridors (walls and ceiling 682 m²)
Glazed Aluminum Display Board F / P of 2.00mx 1.20m
Renovation of visitors` toilets
F / P of plexiglass nameplates (indication signs)
Overhaul of the electricity network as a whole (wiring, cabinet, connection branch)
F / P Chute in offices
Lot 6: HEARING ROOM 1
Making metal benches (L = 2, 50m) to seal on the ground
Installation of sound devices with (2) Microphones with wires and (04) Wireless microphones
F / P 2.5 HP SPLIT air conditioner
Mat formica coating of the seat table
F / P grate lamp 1, 20
F / P Emblem of Justice and State on Wall (Behind Siege)
F / P chair of the presidium
F / P of Air Blower
F / P Painting on Walls and Ceiling
Cleaning the floor tile
Lot 7: DELIBERATION ROOM
F / P Work Table Set and 6 Chairs
F / P Full English Toilet Bowl
F / P wash basin in full
F / P full shower column
F / P Painting on walls and Ceiling
F / P Floor quality carpet
F / P Luminaire
F / P Power outlets
F / P of Air Blower
F / P air conditioner SPLIT 2 HP
Lot 8: AUDIENCE ROOM 2
Making metal benches (L = 2, 50m) to seal on the ground
Installation of sound devices with (2) Microphones with wires and (04) Wireless microphones
F / P 2.5 HP SPLIT air conditioner
Mat formica coating of the seat table
F / P grate lamp 1, 20
F / P Emblem of Justice and State on Wall (Behind Siege)
F / P chair of the presidium
F / P of Air Blower
F / P Painting on Walls and Ceiling
Cleaning the floor tile
Lot 9: DELIBERATION ROOM
F / P Work Table Set and 6 Chairs
F / P Full English Toilet Bowl
F / P wash basin in full
F / P full shower column
F / P Painting on walls and Ceiling
F / P Floor quality carpet
F / P Luminaire
F / P Power outlets
F / P of Air Blower
F / P air conditioner SPLIT 2 HP
Lot 10: SEPTIC TANK AND COURT DEVELOPMENT
Maintenance and Rehabilitation of the pit and looks
F / P Barrier Metallic at the gate
F / P Retouching of the entire main building
F / P of mat and flag surrounded by green space
Installation of a submersible concrete slab for rainwater drainage outdoors and indoors
Displacement and Rehabilitation of the plaque
Lot 11: ARCHIVE-REPROGRAPHY ROOM (DRC)
F / P Masonry Hollow Agglos 15
F / P BA for Posts
F / P Coating on Walls
F / P Painting on Walls and Ceiling
F / P Metal Window (1, 50m * 1, 20)
F / P of Luminaires (Grille Lamp)
F / P Single ignition switch
F / P Power socket
F / P of Air Blower
Lot 12: ROOF SEALING
F / P Concrete for the slope form to the gutters
F / P Pax-Alu waterproofing on the roof including waterproofing on the wall and any suggestion
F / P Pvc pipes 110 + Elbow for evacuation of rainwater from the stairwell
F / P Pvc pipes 110 + Elbow for drainage (4) and additional gutter (5)
F / P of Metal Gutter and Reinforcement of Silicone Gaskets of Glazed Metal Windows (10)
Closure of the expansion joint over its entire surface
General cleaning
Lot 13: LOCAL SEALS IN THE REAR COURT
Pickling topsoil
Full mass excavation for isolated soles
Excavations in a ditch
F / P Isolated insoles
F / P Pole Primer
F / P Masonry in agglos full of 20 cm
Laterite backfilling and compaction
Realization of a slightly reinforced concrete slab (thickness 8cm)
F / P of metal poles in IPN 100
F / P sheet metal cover tray with IPN 80 sleepers, square tube 60 and 50 cm metal angle
Double twist metal mesh with tensioners
F / P Masonry Hollow Agglos 15
F / P Coating on Walls
F / P Painting on Walls and Ceiling
Metal gate in wrought iron grid (3.00mx 2.50m) with angle frame 50
F / P of Air Blower
Lot 14: EXTENSION HOSTING OFFICE, WAITING HALL AND CUSTODY STATION
Excavations in trench and trench
Concrete mix dosed at 150kg / m³
Reinforced concrete soles dosed at 350kg / m³
Expectations of posts and longrins in BA dosed at 350kg / m³
Masonry in agglos full of 15
Land embankment
Concrete with a dosage of 300kg / m³
Masonry in hollow agglos of 15
Posts in BA dosed at 350kg / m³
Lintels in BA dosed at 350kg / m³
High chain linkage at 350kg / m³
Slab in slabs (15 + 5) concrete dosed at 300kg / m³
Cement mortar plaster
Metal door 150 x 220
Outlets
Single switch
Air brewer
Grille lamp
FOM paint on walls and ceilings
Oil painting on metal joinery
F / P of plexiglass nameplates (indication signs)
Office furniture (Work table, Waiting chairs)
F / P of Ceramic Stoneware Floor Tiles
F / P of Plinth tiles
F / P Slope on the roof
F / P Pax-Alu waterproofing on the roof including waterproofing and all subjections
Appendix - detailed benefits
TGI DE KOULIKORO
QUANTITATIVE QUANTITATIVE
No.
NOMINATIONS
U
Qty
Unit price
Amount
I
OFFICE OF THE PRESIDENT
1
F / P Luxe plaster on the walls
m²
81.6
2
F / P of Paint on walls and ceiling
m²
116.6
3
F / P of Padded Door with Groom
u
1
4
F / P power outlet
u
4
5
F / P grate lamp 1, 20
u
2
6
F / P Full English Toilet Bowl
u
1
7
F / P wash basin in full
u
1
8
F / P full shower column
u
1
9
F / P Towel holder, soap dish, coat rack, toilet paper
Ens
1
10
Carpet Removal and Floor Cleaning
m²
35, 000
11
F / P Carpet Floor Quality
m²
35, 000
12
F / P 2.5 HP SPLIT air conditioner
U
1
13
F / P Office furniture (Visitor chairs work table)
U
1
TOTAL I
II
SECRETARIAT OF THE PRESIDENT
1
F / P Painting on walls and ceiling with all subjections
m²
77.6
2
F / P outlets
u
3
Documents
Tender Notice